China Railway Corporation

09/02/2021 | Press release | Distributed by Public on 09/01/2021 21:13

Integrated Commissioning and Test on New Guiyang Terminal Connecting Line (Xiaobi...

The picture shows an inspection train operating on the newly completed section of Guiyang Loop Railway on August 19. On that day, with the integrated commissioning and test started, the new Guiyang terminal connecting line (Xiaobi-Qingzhendong-Baiyun) entered the key stage of project acceptance. The section completed this time is from Xiaobi Station to Baiyun North Station in a length of 81km, which is a part of the 94km Guiyang Loop Railway. This section connects with the Baiyun-Xiaobi section opened to traffic previously and thus making the Guiyang Loop Railway a closed loop.