04/23/2021 | Press release | Distributed by Public on 04/23/2021 00:19
Information on parameters of Unit 1-4, today at 7:00 hrs:
Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 502 MWe
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 500 MWe
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 492 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 503 MWe
Electricity production since the beginning of the year: 4 163 624 MWh.