Petroleum Safety Authority Norway

10/04/2018 | Press release | Distributed by Public on 10/04/2018 01:06

Audit of control room solution for Ivar Aasen

Objective
The objective of the audit was to verify whether the implementation of the selected solution with a control room in Trondheim is prudent and in compliance with the regulations.

Result
One non-conformity was identified in connection with the emergency shutdown system.

In addition, improvement points were identified in connection with:

  • Risk reduction and continuous improvement
  • The emergency preparedness analysis
  • Communication analyses
  • The security analysis

Aker BP has been given a deadline of 26 October 2018 to report on how the non-conformity and improvement points will be addressed.