Denison Mines Corp.

03/29/2021 | Press release | Distributed by Public on 03/29/2021 14:07

Annual Report (SEC Filing - 40-F)

denison-aiff2020vfinal
Exhibit 99.1
Denison Mines Corp.
2020 Annual Information Form
March 26, 2021
ABOUT THIS ANNUAL INFORMATION FORM
This annual information form ('AIF') is dated March 26, 2021. Unless stated otherwise, all of the information in this AIF is stated as at December 31, 2020.
This AIF has been prepared in accordance with Canadian securities laws and contains information regarding Denison's history, business, mineral reserves and resources, the regulatory environment in which Denison does business, the risks that Denison faces and other important information for Shareholders.
This AIF incorporates by reference:
Denison's management discussion and analysis ('MD&A') for the year ended December 31, 2020,
Denison's audited consolidated financial statements for the year ended December 31, 2020,
both of which are available under the Company's profile on SEDAR (www.sedar.com) and on EDGAR (www.sec.gov/edgar.shtml) as an exhibit to the Company's Form 40-F.

Financial Information
Unless otherwise specified, all dollar amounts referred to in this AIF are stated in Canadian dollars ('CAD'). References to 'US$' or 'USD' mean United States dollars.
Financial information is generally derived from consolidated financial statements that have been prepared in accordance with International Financial Reporting Standards as issued by the International Accounting Standards Board.
Table of Contents
About this AIF
About Denison
Developments over the Last Three Years
The Uranium Industry
Mineral Resources and Reserves
Mineral Properties
Athabasca Exploration: Sampling, Analysis and Data Verification
Denison Operations
Manager of UPC
Denison Closed Mines Group
Environmental, Health, Safety and Sustainability Matters
Government Regulation
Risk Factors
Denison's Securities
Denison's Management
Legal and Regulatory Proceedings
Material Contracts
Names and Interests of Experts
Additional Information
Audit Committee Mandate
Glossary of Terms
1
6
8
17
24
27

102
107
111
112
112
114
120
139
140
146
147
149
150
A
B
Caution about Forward-Looking Information
Certain information contained in this AIF and the documents incorporated by reference concerning the business, operations and financial performance and condition of Denison constitutes forward-looking information within the meaning of the United StatesPrivate Securities Litigation Reform Act of 1995and similar Canadian legislation.
Generally, the use of words and phrases like 'plans', 'expects', 'is expected', 'budget', 'scheduled', 'estimates', 'forecasts', 'intends', 'anticipates', or 'believes', or the negatives and/or variations of such words and phrases, or statements that certain actions, events or results 'may', 'could', 'would', 'might' or 'will' 'be taken', 'occur', 'be achieved' or 'has the potential to' and similar expressions are intended to identify forward-looking information.
Forward-looking information involves known and unknown risks, uncertainties, material assumptions and other factors that may cause actual results or events to differ materially from those expressed or implied by such forward-looking statements.
2020 Annual Information Form 1
Denison believes that the expectations and assumptions reflected in this forward-looking information are reasonable, but no assurance can be given that these expectations will prove to be correct. Forward-looking information should not be unduly relied upon. This information speaks only as of the date of this AIF, and Denison will not necessarily update this information, unless required to do so by securities laws.
Examples of Forward-Looking Information
This AIF contains forward-looking information in a number of places, including statements pertaining to Denison's:
expectations regarding raising capital and uses of capital
operational and business outlook, including exploration, evaluation and development plans and objectives
plans for capital expenditure programs, exploration and development expenditures and reclamation costs and timing
results of its Wheeler River PFS and plans with respect to the EA and FS process (each as defined below)
results of its Waterbury PEA (as defined below) and related plans and objectives
expectations regarding future uranium prices and/or applicable foreign exchange rates
expectations regarding the process for and receipt of regulatory approvals, permits and licences under governmental and other applicable regulatory regimes
estimates of its mineral reserves and mineral resources
expectations about 2021 and future market prices, production costs and global uranium supply and demand
expectations regarding ongoing joint arrangements and Denison's share of same
expectations regarding additions to its mineral reserves and resources through acquisitions and exploration
expectations regarding the toll millingofCigar Lakeores, and the relationships with its contractual partners with respect thereto
future royalty and tax payments and rates
expectations regarding possible impacts of litigation and regulatory actions
Statements relating to 'mineral resources' are deemed to be forward-looking information, as they involve the implied assessment, based on certain estimates and assumptions that the mineral resources described can be profitably produced in the future.
Material Risks
Denison's actual results could differ materially from those anticipated. Management has identified the following risk factors which could have a material impact on the Company or the trading price of its common shares ('Shares'):
the capital intensive nature of mining industry and the uncertainty of funding
global financial conditions, including market reaction to COVID-19 and operational risks related to the COVID-19 pandemic
the speculative nature of exploration and development projects
Denison's history of negative cash flow
the imprecision of mineral reserve and resource estimates
the risks of, and market impacts on, developing mineral properties
risks associated with the selection of novel mining methods
dependence on obtaining licenses, and other regulatory and policy risks
2020 Annual Information Form 2
uncertainty regarding engagement with Canada's First Nations and Métis
environment, health and safety risks
lack of public market for uranium and global demand and international trade restrictions
the impact of uranium price volatility on the valuation of Denison's assets, including mineral reserves and resources, and the market price of its Shares
uncertainty regarding public acceptance of nuclear energy and competition from other energy sources
volatility in the market price of the Company's Shares
the risk of dilution from future equity financings
devaluation of any physical uranium held by the Company, and risk of losses, due to fluctuations in the price of uranium and/or foreign exchange rates
dependence on other operators of the Company's projects
reliance on uranium storage facilities
reliance on contractors, experts and other third parties
the risk of failure to realize benefits from transactions
the risk of Denison's inability to expand and replace its mineral reserves and resources
competition for properties
risk of challenges to property title and/or contractual interests in Denison's properties
the risk of failure by Denison to meet its obligations to its creditors
change of control restrictions
uncertainty as to reclamation and decommissioning liabilities and timing
potential for technical innovation rendering Denison's products and services obsolete
liabilities inherent in mining operations and the adequacy of insurance coverage
the ability of Denison to ensure compliance with anti-bribery and anti-corruption laws
the uncertainty regarding risks posed by climate change
the reliance of the Company on its information systems and the risk of cyber-attacks on those systems
dependence on key personnel
potential conflicts of interest for the Company's directors who are engaged in similar businesses
limitations of disclosure and internal controls
● the potential influence of Denison's largest Shareholder, Korea Electric Power Corporation ('KEPCO') and its subsidiary, Korea Hydro & Nuclear Power ('KHNP').
The risk factors listed above are discussed in more detail later in this AIF (see 'Risk Factors'). The risk factors discussed in this AIF are not, and should not be construed as being, exhaustive.
Material assumptions
The forward looking statements in this AIF and the documents incorporated by reference are based on material assumptions, including the following, which may prove to be incorrect:
our budget, including expected exploration levels and costs and the assumptions regarding market conditions and other factors upon which we have based our expenditure expectations
our ability to execute our business plans for 2021 and beyond
our ability to, and the means by which the Company can, raise additional capital to advance other exploration and evaluation objectives
our ability to obtain all necessary regulatory approvals, permits and licences for our planned activities under governmental and other applicable regulatory regimes
our expectations regarding the demand for, and supply of, uranium, the outlook for long-term contracting, changes in regulations, public perception of nuclear power, and the construction of new and relicensing of existing nuclear power plants
our expectations regarding spot and long-term prices and realized prices for uranium, and that the price of uranium will not materially decline in the long-term
our expectations regarding our ability to acquire physical uranium on terms beneficial to the Company and that the physical uranium position will be advantageous in securing project financing and in securing long-term uranium supply agreements in the future
our expectations regarding tax rates, currency exchange rates and interest rates
our decommissioning and reclamation obligations and the status and ongoing maintenance of agreements with third parties with respect thereto
our mineral reserve and resource estimates, and the assumptions upon which they are based
our, and our contractors', ability to comply with current and future environmental, safety and other regulatory requirements and to obtain and maintain required regulatory approvals
our operations are not significantly disrupted as a result of political instability, nationalization, terrorism, sabotage, social or political activism, breakdown, natural disasters, governmental or political actions, litigation or arbitration proceedings, equipment or infrastructure failure, labour shortages, transportation disruptions or accidents, or other development or exploration risks
2020 Annual Information Form 3
A Note for US Investors Regarding Estimates of Measured, Indicated and Inferred Mineral Resources and Proven and Probable Mineral Reserves
This AIF uses the terms 'mineral resource', 'measured mineral resource', 'indicated mineral resource' and 'inferred mineral resource', which are Canadian mining terms as defined in and required to be disclosed in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects ('NI 43-101'), which references the guidelines set out in the Canadian Institute of Mining, Metallurgy and Petroleum (the 'CIM') - CIM Definition Standards on Mineral Resources and Mineral Reserves ('CIM Standards'), adopted by the CIM Council, as amended. However, these terms are not defined terms under Industry Guide 7 ('Industry Guide 7') under the United States Securities Act of 1933, as amended, and, until recently, have not been permitted to be used in reports and registration statements filed with the U.S. Securities and Exchange Commission (the 'SEC' or the 'Commission').
The terms 'mineral reserve', 'proven mineral reserve' and 'probable mineral reserve' are also Canadian mining terms for the purposes of NI 43-101 and CIM Standards. These definitions differ from the definitions in Industry Guide 7. Under Industry Guide 7, mineralization may not be classified as a 'reserve' unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time of the reserve determination. Under Industry Guide 7 standards, a 'final' or 'bankable' feasibility study is required to report reserves, the three-year historical average price is used in any reserve or cash flow analysis to designate reserves and the primary environmental analysis or report must be filed with the appropriate governmental authority. Denison has not prepared a feasibility study for the purposes of NI 43-101 or the requirements of the SEC in connection with its probable mineral reserves disclosure, and therefore such mineral reserve disclosure is not comparable to information from U.S. companies subject to the reporting and disclosure requirements of the SEC. Further, until recently, the SEC has not recognized the reporting of mineral deposits which do not meet the Industry Guide 7 definition of 'reserve'.
The SEC adopted amendments to its disclosure rules to modernize the mineral property disclosure requirements for issuers whose securities are registered with the SEC under the Exchange Act. These amendments became effective February 25, 2019 (the 'SEC Modernization Rules') with compliance required for the first fiscal year beginning on or after January 1, 2021. The SEC Modernization Rules replace the historical disclosure requirements for mining registrants that were included in SEC Industry Guide 7. As a result of the adoption of the SEC Modernization Rules, the SEC now recognizes estimates of 'measured mineral resources', 'indicated mineral resources' and 'inferred mineral resources'. In addition, the SEC has amended its definitions of 'proven mineral reserves' and 'probable mineral reserves' to be 'substantially similar' to the corresponding definitions under the CIM Standards, as required under NI 43-101.
United States investors are cautioned that there are differences in the definitions under the SEC Modernization Rules and the CIM Standards. Accordingly, there is no assurance any mineral reserves or mineral resources that the Company may report as 'proven mineral reserves', 'probable mineral reserves', 'measured mineral resources', 'indicated mineral resources' and 'inferred mineral resources' under NI 43-101 would be the same had the Company prepared the reserve or resource estimates under the standards adopted under the SEC Modernization Rules.
United States investors are also cautioned that while the SEC now recognizes 'indicated mineral resources' and 'inferred mineral resources', investors should not assume that any part or all of the mineralization in these categories will ever be converted into a higher category of mineral resources or into mineral reserves. Mineralization described using these terms has a greater amount of uncertainty as to their existence and feasibility than mineralization that has been characterized as reserves. Accordingly, investors are cautioned not to assume that any 'indicated mineral resources' or 'inferred mineral resources' that the Company reports are or will be economically or legally mineable. Further, 'inferred mineral resources' have a greater amount of uncertainty as to their existence and as to whether they can be mined legally or economically. Therefore, United States investors are also cautioned not to assume that all or any part of the 'inferred mineral resources' exist.
2020 Annual Information Form 4
In accordance with Canadian securities laws, estimates of 'inferred mineral resources' cannot form the basis of feasibility or other economic studies, except in limited circumstances where permitted under NI 43-101.
Accordingly, information contained in this AIF and the documents incorporated by reference herein containing descriptions of the Company's mineral deposits may not be comparable to similar information made public by U.S. companies subject to the reporting and disclosure requirements under the United States federal securities laws and the rules and regulations thereunder.
2020 Annual Information Form 5
ABOUT DENISON
Denison Mines Corp. is primarily engaged in uranium exploration and development. The registered and head office of Denison is located at 1100 - 40 University Avenue, Toronto, Ontario, M5J 1T1, Canada. Denison's website address is www.denisonmines.com.

At the end of 2020, Denison had a total of 66 active employees, all of whom were employed in Canada. None of the Company's employees are unionized.
The Shares are listed on the Toronto Stock Exchange ('TSX') under the symbol 'DML' and on the NYSE American under the symbol 'DNN.' Computershare Investor Services Inc. acts as the registrar and transfer agent for the Shares. The address for Computershare Investor Services Inc. is 100 University Avenue, 8th Floor, Toronto, ON, M5J 2Y1, Canada, and the telephone number is 1-800-564-6253.
Denison is a reporting issuer in all of the Canadian provinces and territories. The Shares are also registered under the United States Securities Exchange Act of 1934, as amended, and Denison files periodic reports with the United States Securities and Exchange Commission.
In this AIF, Denison or the Company means Denison Mines Corp., Shareholders means holders of Denison's common shares and Shares means Denison's common shares.

Denison's Structure
Denison conducts its business through a number of subsidiaries. The following is a diagram depicting the corporate structure of Denison and its active subsidiaries as at December 31, 2020, including the name, jurisdiction of incorporation and proportion of ownership interest in each.
The Waterbury Lake Uranium Limited Partnership ('WLULP') is held by Denison (66.89%) and Korea Waterbury Uranium Limited Partnership ('KWULP') (33.09%) as limited partners and Waterbury Lake Uranium Corporation ('WLUC') (0.02%), as general partner, with Denison and KWULP holding limited partnership interests of 66.90% and 33.10%, respectively.
Denison also owns a number of inactive subsidiaries which have no liabilities or assets and do not engage in any business activities.
2020 Annual Information Form 6
Denison Overview
Uranium Exploration and Development
Denison's uranium exploration properties are principally held directly by the Company or indirectly through Denison Mines Inc. ('DMI'), Denison Waterbury Corp. and Denison AB Holdings Corp.
Denison's Key Assets - In the Athabasca Basin Region of Northern Saskatchewan:
●A 90% interest in, and operator of, the Wheeler River Uranium project, which is host to the high-grade Phoenix and Gryphon uranium deposits - together representing the largest undeveloped uranium project in the infrastructure rich eastern Athabasca Basin.
●A 66.90% interest in, and operator of, the Waterbury Lake project, which includes the The Heldeth Túé ('THT', formerly J Zone) and Huskie deposits.
●A 22.50% interest in the McClean Lake uranium processing facility and uranium deposits, through its interest in the McClean Lake Joint Venture ('MLJV') operated by Orano Canada Inc. ('Orano Canada').
●A 25.17% interest in the Midwest uranium project, operated by Orano Canada, which is host to the Midwest Main and Midwest A deposits.
●An extensive portfolio of exploration properties located in the Athabasca Basin.
Services
The Company generates cash flow through the following areas of its business:
(i)
Management of Uranium Participation Corporation ('UPC')
Pursuant to a management services agreement, DMI serves as the manager of UPC, a publicly-traded company listed on the TSX under the symbol 'U', which invests in uranium oxide in concentrates (U3O8) and uranium hexafluoride (UF6).
(ii)
Denison's Closed Mines group (formerly Denison Environmental Services)
Denison provides mine care & maintenance services to third party customers.
Toll Milling
Denison is a party to a toll-milling arrangement through its 22.50% interest in the MLJV, whereby ore is processed for the Cigar Lake Joint Venture ('CLJV') at the McClean Lake processing facility (the 'Cigar Toll Milling'). In February 2017, Denison completed a financing (the 'APG Transaction') with Anglo Pacific Group PLC ('APG') and its wholly owned subsidiary Centaurus Royalties Ltd. for gross proceeds to Denison of $43,500,000. The APG Transaction monetized a portion of Denison's future share of the Cigar Toll Milling, providing Denison with the financial flexibility to advance its interests in the Athabasca Basin, including the Wheeler River project.
2020 Annual Information Form 7
While the APG Transaction monetized certain future toll milling receipts from the Cigar Toll Milling, Denison retains a 22.5% strategic ownership stake in the MLJV and McClean Lake processing facility. See 'Denison's Operations - Cigar Lake Toll Milling - APG Transaction'.
The Formation of Denison Mines Corp.
Denison was formed by articles of amalgamation as International Uranium Corporation ('IUC') effective May 9, 1997 pursuant to the Business Corporations Act (Ontario) (the 'OBCA'). On December 1, 2006, IUC combined its business and operations with DMI, by plan of arrangement under the OBCA (the 'IUC Arrangement'). Pursuant to the IUC Arrangement, all of the issued and outstanding shares of DMI were acquired in exchange for IUC's shares. Effective December 1, 2006, IUC's articles were amended to change its name to 'Denison Mines Corp.'
Denison subsequently completed a plan of arrangement with Energy Fuels Inc. in 2012 and filed articles of amalgamation on January 1, 2014, July 1, 2014 and July 3, 2014 in connection with Denison's acquisitions of JNR Resources Inc. ('JNR') and Fission Energy Corp. ('Fission').
DEVELOPMENTS OVER THE LAST THREE YEARS
2018…
In January, the Company amended and extended its credit facility with the Bank of Nova Scotia (the 'Credit Facility') to January 31, 2019.
Also in January, Denison announced an 88% increase in the indicated mineral resources estimated for the Wheeler River project with the completion of an updated mineral resource estimate for the Gryphon deposit at Wheeler River. The Gryphon deposit is estimated to contain, above a cut-off grade of 0.2% U3O8, 61.9 million pounds of U3O8 (1,643,000 tonnes at 1.71% U3O8) in indicated mineral resources, plus 1.9 million pounds of U3O8 (73,000 tonnes at 1.18% U3O8) in inferred mineral resources. By comparison, the maiden mineral resource estimate, completed in September 2015, was comprised of inferred mineral resources of 43.0 million pounds of U3O8 above a cut-off grade of 0.2% U3O8 (834,000 tonnes at 2.3% U3O8). Together, Wheeler River is now host to 132.1 million pounds U3O8 (1,809,000 tonnes at an average grade of 3.3%) in total indicated mineral resources. Following the mineral resource update, Wheeler River retained and improved its standing as the largest undeveloped high-grade uranium project in the infrastructure rich eastern portion of the Athabasca Basin. In March, Denison filed a technical report containing the updated mineral resource estimate for the Wheeler River property. See 'Mineral Properties - Wheeler River'.
In March, Denison also completed a review of an updated mineral resource estimate for the Midwest project. The review resulted in the estimation of (a) inferred mineral resources on the property increasing to 18.2 million pounds of U3O8 (100% basis; above a cut-off grade of 0.1% U3O8), an increase of 13.5 million pounds of U3O8 from the prior estimate; and (b) indicated mineral resources increasing to 50.78 million pounds U3O8 (100% basis; above a cut-off grade of 0.1% U3O8), an increase of 2.08 million pounds U3O8 from the prior estimate. A technical report was filed on March 27, 2018. See 'Mineral Properties - Midwest'.
In April, Denison further amended the Credit Facility to accommodate the Company's change in financial statement presentation currency to Canadian dollars. The covenant in the Credit Facility to maintain a specified level of tangible net worth was changed to $131,000,000 (from US$150,000,000).
2020 Annual Information Form 8
Also in April, the Company reported the completion of the winter drilling program at the Wheeler River project, including the discovery of high-grade uranium mineralization 600 metres and 1 kilometre to the northeast of the Gryphon uranium deposit. High-grade intercepts were obtained at the sub-Athabasca unconformity along the K-North trend from reconnaissance drill fences spaced 200 metres apart. The results were confirmed by chemical assays announced on June 6, 2018, which included 1.4% U3O8 over 5.5 metres (including 7.2% U3O8 over 1.0 metre) in drill hole WR-704, located 600 metres northeast of Gryphon; and 1.1% U3O8 over 3.0 metres (including 2.8% U3O8 over 1.0 metre) in drill hole WR-710D1, located 1 kilometre northeast of Gryphon. The winter drilling program at Wheeler River included 21,153 metres drilled in 29 diamond drill holes, largely focused on step-out drilling along strike of the Gryphon deposit and reconnaissance level regional exploration along the K-North and K-West trend.
And in April, Denison reported the expansion of the Huskie zone on the Waterbury Lake project, with the receipt of U3O8 chemical assay results from the Company's winter 2018 diamond drilling program. The results were highlighted by the following intercepts: 4.5% U3O8 over 6.0 metres (including 5.8% U3O8 over 4.5 metres), and 0.57% U3O8 over 6.3 metres (including 1.9% U3O8 over 1.0 metre) in drill hole WAT18-452; and 0.62% U3O8 over 1.0 metre in drill hole WAT18-460A. The winter drilling program involved 9,794 metres of diamond drilling in 19 drill holes, and was focused on 50 metre step-out drilling along strike and down-dip of the Huskie zone, as well as wider-spaced reconnaissance drilling to the west along the geological trend.
In May, Denison announced the results of its Annual General Shareholders Meeting, which included the ratification and approval of the Company's new Share Unit Plan and the previous grants of share units thereunder.
In August, changes were made to the composition of the Company's Board of Directors, with the appointment to the Board of David Cates (the Company's President and Chief Executive Officer), Jack Lundin, Moo Hwan Seo and Patricia Volker. At that time, the Company accepted the resignation of Kwang-Hee Jeong and Lukas Lundin. In addition, Catherine Stefan, previously serving as the Company's independent Lead Director, was appointed Chair of the Board.
In September, Denison entered into an agreement with Cameco Corporation ('Cameco'), pursuant to which Denison would increase its ownership interest in the Wheeler River project to 90% through the acquisition of 100% of Cameco's minority interest in the Wheeler River Joint Venture ('WRJV') (subject to certain rights of first refusal in favour of JCU (Canada) Exploration Limited ('JCU'), pursuant to the WRJV joint venture agreement) in exchange for the issuance to Cameco of 24,615,000 Shares of Denison. JCU waived its rights under the WRJV joint venture agreement to acquire any of Cameco's interest, and Denison's acquisition of Cameco's interest was completed effective October 26, 2018 (the 'Cameco Transaction'). See 'Mineral Properties - Wheeler River'.
Also in September, Denison announced the appointment of Tim Gabruch as the Corporation's Vice President Commercial.
And in September, Denison reported a new discovery of uranium mineralization on the Company's Waterbury Lake project. Basement-hosted uranium mineralization was intersected in two drill holes, approximately three kilometres northeast of the project's Huskie deposit, returning mineralized assay intervals of 0.43% U3O8 over 1.0 metre (including 0.73% U3O8 over 0.5 metres) in drill hole WAT18-478 and 0.45% U3O8 over 0.5 metre as well as 0.31% U3O8 over 0.5 metre and 0.20% U3O8 over 0.5 metre in drill hole WAT18-479. The zone of mineralization was subsequently named the GB zone.
2020 Annual Information Form 9
In September, Denison announced the results of the Pre-Feasibility Study ('PFS') for the Wheeler River project. The PFS was completed in accordance with NI 43-101 and is highlighted by the selection of the in-situ recovery ('ISR') mining method for the development of the high-grade Phoenix deposit ('Phoenix'), with an estimated average operating cost of $4.33 (US$3.33) per pound U3O8. The PFS considers the potential economic merit of co-developing the Phoenix and Gryphon deposits. The ISR mining operation planned for Phoenix, would see associated processing to a finished product occurring at a plant to be built on site at Wheeler River. The Gryphon deposit is designed as an underground mining operation, utilizing a conventional long hole mining approach with processing of mine production assumed at Denison's 22.5% owned McClean Lake mill. Taken together, the project is estimated to have mine production of 109.4 million pounds U3O8 over a 14-year mine life, with a base case pre-tax Net Present Value ('NPV') of $1.31 billion (8% discount rate), Internal Rate of Return ('IRR') of 38.7%, and initial pre-production capital expenditures of $322.5 million. The base-case economic analysis assumes uranium sales are made at UxC Consulting Company, LLC's ('UxC') annual estimated spot price (composite mid-point scenario) for mine production from Phoenix (from ~US$29/lb U3O8 to US$45/lb U3O8), and a fixed price for mine production from the Gryphon deposit (US$50/lb U3O8). The PFS is prepared on a project (100% ownership) and pre-tax basis, as each partner to the WRJV is subject to different tax and other obligations. The technical report in support of the PFS was filed on October 30, 2018. See 'Mineral Properties - Wheeler River'.
In November, Denison reported that it had completed a maiden mineral resource estimate for the Huskie basement-hosted uranium deposit in accordance with NI 43-101 and CIM Definitions (2014), which was reviewed and audited by SRK Consulting (Canada) Inc. ('SRK'). The results are detailed in the updated technical report for Waterbury, filed on December 21, 2018. See 'Mineral Properties - Waterbury Lake'.
Also in November, Denison reported the discovery of unconformity uranium and base metals mineralization on the K West trend at Wheeler River. Highlights from the Company's summer 2018 diamond drilling program at Wheeler River included drill hole WR-733D1, which returned 0.30% U3O8, 4.7% Co, 3.7% Ni and 0.55% Cu at the unconformity on the K West trend, approximately 500 metres west of the parallel K North trend, which hosts the Gryphon deposit.
And in November, Denison announced the completion of a private placement offering (the '2018 Offering') of Shares issued on a 'flow-through' basis pursuant to the Income Tax Act (Canada). The Company issued 4,950,495 Shares, at a price of $1.01 per Share, for total gross proceeds of approximately $5,000,000. The gross proceeds of the financing were used to fund expenses related to the Company's exploration activities in 2019.
In December, the Company's Board of Directors and the WRJV each approved the advancement of the Wheeler River project, following a detailed assessment of the robust economic results demonstrated in the PFS.
2019…
In January, the Company amended and extended its Credit Facility to January 31, 2020.
In March, the Company announced the execution of the new five-year management services agreement (the 'MSA') to provide management services to UPC. The MSA took effect on April 1, 2019, at the conclusion of the three-year term of the then current management services agreement between UPC and DMI. See 'Manager of UPC'.
2020 Annual Information Form 10
Also in March, Mr. Moo Hwan Seo resigned from the Board. Mr. Geun Park joined the Board, filling the vacancy created by Mr. Seo's resignation.
In May, the Company announced the discovery of unconformity-hosted uranium mineralization along the southern portion of the K West trend at the Company's Wheeler River Project, including 0.08% eU3O8 over 1.3 metres in drill hole WR-756, accompanied by strong sulphide mineralization and other geological features commonly associated with unconformity-related uranium deposits. The Company also announced the completion of follow-up drilling at the GB Zone at Waterbury Lake, which intersected basement-hosted mineralization in multiple drill holes, including 0.15% U3O8 over 6.0 metres in drill hole WAT19-480, and 0.25% U3O8 over 2.0 metres and 0.22% U3O8 over 1.5 metres in drill hole WAT19-486.
In June, the Canadian Nuclear Safety Commission ('CNSC') and the Saskatchewan Ministry of Environment accepted the Provincial Technical Proposal and Federal Project Description (the 'Project Description') submitted by Denison for the ISR uranium mine and processing plant proposed for the Wheeler River Project. This acceptance initiated the Environmental Assessment ('EA') process for Wheeler River in accordance with the requirements of both the Canadian Environmental Assessment Act, 2012 and the Saskatchewan Environmental Assessment Act.
Also in June, the Company announced that it had executed a series of Memoranda of Understanding (the 'MOUs'), in support of the Wheeler River Project, with certain Indigenous communities who assert that Wheeler River falls partially or entirely within their traditional territories and where traditional land use activities are currently practiced within the local and regional area surrounding the project. These non-binding MOUs formalize the signing parties' intent to work together in the spirit of mutual respect and cooperation, in order to collectively identify practical means by which to avoid, mitigate, or otherwise address potential impacts of the project upon the exercise of Indigenous rights, Treaty rights, and other interests, as well as to facilitate sharing in the benefits that are expected to flow from the project.
And in June, the Company announced its plans to undertake an initial ISR field program within the Phoenix orebody at Wheeler River, using water to evaluate hydrologic conditions that can be used to assess the hydraulic connections and potential mining solution flow between a series of test wells. Initial test results from Phoenix were announced in August, which confirmed hydraulic connectivity between multiple test wells, providing significant preliminary indications of the suitability of the area tested for the application of ISR mining. In September, the Company reported the initial results from the next test area of Phoenix, which also confirmed hydraulic connectivity within a significant portion of the ore zone tested.
In July, Denison's Closed Mines group entered into a new two-year services agreement with Rio Algom Limited ('Rio Algom'), a subsidiary of BHP Billiton Limited ('BHP'). Under the terms of the agreement, the Closed Mines group is responsible for carrying out the management and operation of nine of Rio Algom's decommissioned mine sites in Ontario and Quebec from July 1, 2019 to June 30, 2021, which services include the operation of water treatment plants and tailings management facilities; environmental monitoring and compliance, data management, and regulatory reporting; maintenance of roads, dams and electrical infrastructure; site management, including health and safety, procurement, logistics, and budgeting activities; and project management and execution for various projects, including infrastructure upgrades and replacements, engineering and environmental programs, as well as water management initiatives.
2020 Annual Information Form 11
In September, following the positive initial results of its field program at Phoenix, Denison advanced to the second stage of ISR field testing - the installation of two large-diameter commercial scale wells ('CSW's) at Phoenix, with each well designed to meet the technical and regulatory standards expected for a commercial ISR well at Phoenix.
In October, David Bronkhorst was appointed Vice President Operations with responsibility for overseeing and advancing the Company's project evaluation programs for Wheeler River.
Also in October, the Company successfully installed two CSWs at Phoenix - marking the completion of the first CSWs designed for ISR mining in the Athabasca Basin. The completion of each CSW included the drilling of a large-diameter vertical borehole (~12 inches in diameter), to intersect the Phoenix ore body at a depth of approximately 400 metres below surface, and the installation of well materials designed to meet expected environmental and regulatory standards for eventual ISR mining. The Company also tested down-the-hole permeability enhancement techniques within the large diameter CSWs.
In December, Denison completed a private placement offering (the '2019 Offering') of Shares issued on a 'flow-through' basis pursuant to theIncome Tax Act(Canada). Denison issued 6,934,500 flow-through shares, at a price of $0.68 per share, for aggregate gross proceeds to Denison of approximately $4.7 million, which includes the exercise, in full, of the over-allotment option of 904,500 shares. The gross proceeds from the financing were used to fund the Company's Canadian exploration activities in 2020.
Also in December, Denison reported the completion of a highly successful ISR field program at Phoenix. The 2019 ISR field program was designed to validate the permeability of Phoenix, and to collect an extensive database of hydrogeological data to further evaluate the ISR mining conditions present at Phoenix. This detailed data is expected to facilitate detailed mine planning as part of the completion of a future Feasibility Study ('FS'). The ISR field program, as described above, successfully achieved each of its planned objectives.
Denison also announced the initiation of the next phase of ISR metallurgical laboratory testing for uranium recovery, which will utilize the mineralized drill core recovered through the installation of various test wells during the 2019 ISR field program. The metallurgical laboratory test program builds upon the laboratory tests completed for the recovery of uranium as part of the project's PFS and is expected to further increase confidence and reduce risk associated with the application of ISR. The results are expected to facilitate detailed mine and process plant planning as part of a future FS, and will provide key inputs for the EA process. Significant components of the metallurgical laboratory test program include core leach tests, column leach tests, bench-scale tests and metallurgical modelling.
And in December, Denison received a positive scoping decision, with a Record of Decision issued by the CNSC on the scope of the factors to be taken into account for the EA for the Wheeler River project, which indicate that the EA will follow the CNSC's generic guidelines.
2020…
In January, the Company amended and extended its Credit Facility to January 31, 2021.
Also in January, Mr. Geun Park resigned from the Board. Mr. Jun Gon Kim joined the Board effective February 17, 2020, filling the vacancy created by Mr. Park's resignation.
2020 Annual Information Form 12
In February, Denison reported that initial data from the Phoenix Deposit core leach tests includes elemental uranium concentrations, after test startup, in the range of 13.5 grams per litre ('g/L') to 39.8 g/L, and an average of 29.8 g/L over a 20-day period of testing. This compares favourably to the previous metallurgical test work completed to assess the use of the ISR mining method at Phoenix, which supported the use of an assumed uranium concentration of 10 g/L in the PFS design for the ISR processing plant.
Also in February, Denison reported that the results from the hydrogeological test work completed to-date have confirmed the ability to achieve bulk hydraulic conductivity values (a measure of permeability) consistent with the PFS. Extensive hydrogeological data sets were collected during the 2019 ISR field program for incorporation into a hydrogeological model being developed for Phoenix to be used for detailed planning for further ISR field testing intended to support the completion of a future FS.
In March, Denison announced the temporary suspension of Wheeler River EA activities, and adjustments to its prior 2020 Outlook, amidst the significant social and economic disruption resulting from the COVID-19 pandemic and the Company's commitment to ensure employee safety, support public health efforts to limit transmission of COVID-19, and exercise prudent financial discipline.
In April, Denison completed a US$5.75 million bought deal public offering, issuing 28,750,000 Shares, including the exercise in full of the underwriters' over-allotment option of 3,750,000 Shares. The shares were qualified for issuance pursuant to a final short form prospectus in all provinces of Canada (other than Quebec), and in the United States pursuant to a related registration statement on Form F-10, as amended (SEC File No. 333-237381), filed with the United States Securities and Exchange Commission (the 'SEC') under the Canada/U.S. multi-jurisdictional disclosure system.
In June, the Company filed a short form base shelf prospectus ('2020 Prospectus') with the securities regulatory authorities in each of the provinces and territories of Canada and a registration statement on Form F-10 was filed with the SEC. The 2020 Prospectus qualifies the issuance of certain securities and combinations of securities, for an aggregate offering amount of up to $175,000,000 during the 25 month period beginning June 2, 2020, in amounts, at prices and on terms to be subsequently determined and disclosed, as applicable.
Also in June, the Company announced the completion of independent hydrogeologic modeling for the Phoenix deposit at Wheeler River, based on site-specific data collected from the 2019 ISR field program, which produced demonstration of 'proof of concept' for the application of the ISR mining method at Phoenix, with respect to potential operational extraction and injection rates, a significant milestone in de-risking the technical risks identified in the 2018 PFS.
In July, Denison announced the resumption of ISR field testing activities at Phoenix, with the commencement of the 2020 ISR field program. The work was intended to build additional confidence in the results of the hydrogeologic model developed for the deposit, and to support further field work expected to be required for the completion of a future FS. Denison also announced that, in order to ensure the Company's operations comply with all applicable health and safety guidelines associated with the COVID-19 pandemic, all operating procedures at the Company's Wheeler River site were reviewed and adapted to incorporate physical distancing and enhanced hygiene protocols, as well as special travel protocols designed by Denison for northern Saskatchewan. Where applicable, the Company's protocols incorporated feedback received from potentially impacted communities in northern Saskatchewan to minimize any health and safety risks associated with travel to and from site.
2020 Annual Information Form 13
Also in July, the Company announced the completion of a conceptual mining study, evaluating the use of the ISR mining method, for the J Zone deposit at the Waterbury Lake project and the initiation of a preliminary economic assessment (the 'Waterbury PEA').
And in July, Denison announced the London Court of International Arbitration had rendered a final award in favour of Denison in the arbitration between Denison and Uranium Industry a.s. ('UI') with respect to the contingent proceeds of Denison's sale to UI of its interest in the Gurvan Saihan Joint Venture in Mongolia in 2015 (the 'Mongolia Transaction'). The arbitration panel declared that UI violated its obligations to the Company under the related agreements, and ordered UI to pay the Company US$10,000,000 plus interest at a rate of 5% per annum from November 16, 2016, plus certain legal and arbitration costs. The arbitration panel further dismissed all other claims and counterclaims. For further updates, see 'Legal and Regulatory Proceedings'.
In October, the Company completed a bought deal equity offering (the 'October2020 Offering') of 51,347,321 Shares, which included the partial exercise of the over-allotment option granted to the underwriters, for aggregate gross proceeds of approximately US$19 million. The October 2020 Offering was completed pursuant to a prospectus supplement to the 2020 Prospectus. Proceeds of the October 2020 Offering are anticipated to be used to fund evaluation and EA activities on the Wheeler River project in 2021, as well as for general working capital purposes.
Also in October, Denison provided an update on field activities at Wheeler River, with the completion of its 2020 ISR field program at Phoenix and the commencement of an ~12,000 metre exploration drilling program designed to test initially for extensions to known mineralization at Phoenix and then advance to regional targets for the discovery of satellite uranium deposits potentially amenable to ISR mining. The ISR field program included the installation of five additional monitoring wells in two clusters, which will allow for long-term monitoring and the modelling of groundwater impacts through construction, operations and decommissioning of the Phoenix project, each of which will be an important element of the effect assessment in an Environmental Impact Statement ('EIS').
In November, Denison announced its decision to restart the formal EA process for Wheeler River effective January 2021. The decision to resume the EA process marked the end of the temporary suspension announced in March 2020 amidst the significant social and economic disruption that emerged as a result of the COVID-19 pandemic.
Also in November, the Company announced it had entered into an equity distribution agreement ('EDA') providing for an at-the-market ('ATM') equity offering program, with Cantor Fitzgerald Canada Corporation, Scotia Capital Inc., Cantor Fitzgerald & Co. and Scotia Capital (USA) Inc. The intention of the ATM was to allow Denison to, through the agents and from time to time, offer and sell, in Canada and the United States by means of ordinary brokers' transactions through the facilities of the TSX and/or NYSE American, such number of Shares as would have an aggregate offering price of up to US$20 million. The sale of the Company's Shares through the ATM were made pursuant to and qualified by a prospectus supplement to the 2020 Prospectus. As at the date hereof, Denison, through its agents, has issued 4,230,186 Shares under the ATM, at an average price of $0.93, for aggregate gross proceeds of $3,914,000. In connection with the March 2021 Offering (described below), Denison terminated the EDA, and ATM issuances pursuant thereto, as the aggregate issuances pursuant to prospectus supplements under the 2020 Prospectus, including the ATM and March 2021 Offering, had neared the 2020 Prospectus limit for aggregate issuance price of securities qualified for issuance by the 2020 Prospectus. See 'Denison's Securities - ATM Program Activity'.
2020 Annual Information Form 14
And in November, Denison announced the successful completion of the independent PEA for the Waterbury Lake property evaluating the potential use of the ISR mining method at the THT deposit. The PEA was completed in accordance with NI 43-101. The THT ISR operation is estimated to produce total mine production of 9.7 million pounds U3O8 (177,664 tonnes at 2.49% U3O8) over an approximate six year mine-life with final processing occurring at Denison's 22.5% owned McClean Lake mill with a base case pre-tax NPV of $177 million (8% discount rate), IRR of 39.1%, and initial capital expenditures of $111.6 million, excluding pre-construction evaluation and development costs. The base-case economic analysis assumes uranium sales are made at UxC's forecasted annual 'Composite Midpoint' spot price from the Q3'2020 Uranium Market Outlook, stated in constant dollars (from ~US$49/lb U3O8 to US$57/lb U3O8). The PEA was prepared on a project (100% ownership) and pre-tax basis as each partner to of the Waterbury Lake Uranium Limited Partnership is subject to different tax and other obligations. The technical report in support of the PEA was filed on December 30, 2020. See 'Mineral Properties - Waterbury'.
In December, Denison announced the completion of a trade-off study assessing the merit of adopting a freeze wall design as part of the ISR mining approach planned for Phoenix. Based on the results of the trade-off study, it was determined that a freeze wall design has the potential to offer significant environmental, operational, and financial advantages compared to the freeze cap (or freeze 'dome') design previously planned for the project and included in the Wheeler PFS. Accordingly, the Company has decided to adapt its plans for the Project to use a freeze wall in future Project design and environmental assessment efforts. See 'Mineral Properties - Wheeler River'.
Also in December, Denison completed a non-brokered private placement of 1,081,959 Shares that qualify as 'flow-through shares' for purposes of the Income Tax Act (Canada), at $0.86 per share, for gross proceeds of approximately $930,000 (the '2020 FT Offering'). The Company will use the proceeds to fund its share of exploration expenditures in 2021.
2021 Recent Developments…
In January, the Company amended and extended its Credit Facility to January 31, 2022.
Also in January, the Company reported the results from its 2020 regional exploration program at Wheeler River, which included the discovery of new high-grade unconformity-hosted uranium mineralization up to 7.66% U3O8. Drill hole WR-741AD2, which was completed along the K West conductive trend on the western side of the Wheeler River property, intersected high-grade uranium mineralization approximately four kilometers north northwest of Phoenix. Similar to Phoenix, uranium mineralization discovered in WR-741AD2 is interpreted to straddle the unconformity contact of the underlying basement rocks and the overlying Athabasca Basin sandstone. In addition to high-grade uranium, the assay results from WR-741AD2 are highlighted by the presence of high-grade nickel.
In February, Denison announced that the company finalized its 2021 plans for the further advancement of the Wheeler River project and additional field testing activities for the de-risking of the application of the ISR mining method at Phoenix. To facilitate these plans, the WRJV has approved a $24.0 million budget for 2021 (100% basis), which is highlighted by the resumption of the EA process, as well as the advancement of engineering studies, metallurgical testing, and field programs to support the future initiation of a formal a FS and the submission of a draft EIS. Denison's net share of the 2021 budget for Wheeler River is $19.4 million, which reflects operator's fees earned by Denison and its 90% ownership interest in the project.
2020 Annual Information Form 15
Also in February, the Company reported the results from the 2020 exploration and expansion drilling program focused on the area proximal to the Phoenix deposit at Wheeler River. As part of this program, 21 drill holes were completed for a total of approximately 8,100 metres - all of which were located outside of the extents of the mineral resources currently defined at Phoenix. The results from the program were highlighted by the intersection of high-grade uranium mineralization in Zone C, where no mineral resource is currently estimated: 5.69% U3O8 over 5.0 metres in WR-328D1, located approximately 22 metres northeast of historic mineralized hole WR-368 (1.59% U3O8 over 2.0 metres); and 8.84% U3O8 over 2.5 metres in WR-767D1, located approximately 35 metres to the northeast of WR-328D1.
And in February, the Company completed a public offering by way of a prospectus supplement to the 2020 Shelf Prospectus of 31,593,950 units of the Company at US$0.91 per unit for gross proceeds of $36,266,000 (US$28,750,000), including the full exercise of the underwriters' over-allotment option, accounting for 4,120,950 units (the 'February2021 Offering'). Each unit consists of one Share and one-half of one transferable common share purchase warrant of the Company. Each full warrant is exercisable to acquire one Share of the Company at an exercise price of US$2.00 for 24 months after issuance. Proceeds of the February 2021 Offering are anticipated to be used to fund evaluation and environmental assessment activities in support of the advancement of the proposed Phoenix ISR uranium mining operation at Wheeler River, as well as for general working capital purposes.
In March, the Company completed a private placement of 5,926,000 Shares that qualify as 'flow-through shares' for purposes of the Income Tax Act (Canada) at a price of $1.35 per share for gross proceeds of approximately $8,000,000 (the '2021 FT Offering'), the proceeds of which are to be used on the Company's exploration activities in 2021 and 2022. The income tax benefits of this issue will be renounced to subscribers with an effective date of December 31, 2021.
Also in March, the Company announced its inclusion in the S&P/TSX Composite Index- the headline index for the Canadian equity market - effective prior to the open of trading on Monday March 22, 2021.
And in March, the Company announced a project finance initiative to acquire physical uranium, intended to enhance its ability, if a future decision is made to advance Wheeler River into construction, to (i) access future project financing with the potential collateralization of the uranium holdings and/or (ii) provide the Company with increased flexibility to negotiate long-term uranium supply arrangements with future customers. To fund the uranium acquisition, the Company completed a public offering by way of a prospectus supplement to the 2020 Shelf Prospectus of 78,430,000 units of the Company at US$1.10 per unit for gross proceeds of US$86,273,000, including the full exercise of the underwriters' over-allotment option, accounting for 10,230,000 units (the 'March2021 Offering'). Each unit consists of one common share and one-half of one transferable common share purchase warrant of the Company. Each full warrant is exercisable to acquire one Share of the Company at an exercise price of US$2.25 for 24 months after issuance. In connection with the March 2021 Offering, the Company agreed to terminate the EDA for its existing ATM, and cease distributions thereunder.
2020 Annual Information Form 16
THE URANIUM INDUSTRY
Nine years after the March 2011 Fukushima Daichii nuclear incident occurred, the uranium market, amongst others, became the focus of unexpected supply disruptions resulting from the COVID-19 pandemic. In the case of the uranium market, demand remained relatively steady as the world responded to the pandemic and nuclear power plants continued to operate largely without disruption, while the supply side of the market experienced significant disruptions from the world's largest and most influential uranium producers. This marked the beginning of a meaningful price recovery through the first part of 2020. The unexpected supply reaction catalyzed by the pandemic was layered on top of a uranium supply/demand picture that had already begun to change over the past couple of years, with demand outstripping supply from primary production and the shortfall being made up by inventories and other secondary supplies. As this dynamic has played out, sentiment regarding a recovery in the uranium price has improved, particularly with the high-profile shutdown and curtailment of many supply sources across the industry, including the world's largest and highest grade uranium mine, Cameco Corporation's ('Cameco') McArthur River Mine in northern Saskatchewan, Canada, which was placed into care and maintenance indefinitely in July 2018.
COVID-19's short term effect on uranium supply has been dramatic, with additional production cuts announced by several of the world's largest uranium producers. In March 2020, Cameco and Orano announced the closure of the lone remaining uranium production centre in Canada - the Cigar Lake Mine and the McClean Lake Mill. In April 2020, the world's largest producer of uranium, National Atomic Company Kazatomprom ('Kazatomprom'), announced that it would reduce operational activities across all of its uranium mines for an expected period of three months. Kazatomprom indicated that production was expected to decrease by up to 4,000 tU (10.4 million pounds U3O8) over this period. Together, these supply shocks resulted in the uranium price quickly rising almost 40%, from a low of US$24.10 in mid-March 2020, to a high of US$34.00 in May 2020.
In July 2020, Cameco announced that it would reopen its Cigar Lake mine in September. This news surprised many market participants and the uranium price slowly fell from above US$32.20 at the time of the announcement, to US$30.65 by the end of August. The spot price remained relatively stable for the remainder of the year, with the market registering the highest ever spot market volumes for a single year. By the end of December, the spot volume transacted reached 92.3 million pounds U3O8, breaking the previous annual spot volume record from 2018 of 88.7 million pounds U3O8.
In August 2020, Kazatomprom announced that it had decided to maintain its 20% reduction in production below the planned levels in its subsoil use contracts through 2022. Kazatomprom also confirmed that it had purchased uranium in the spot market and could continue to do so through the rest of the year. These announcements seemed to help stabilize general market sentiment following the unexpected restart of Cigar Lake.
Based on these events, and other significant COVID-19 related production disruptions, it is clear that large volumes of inventories and other secondary supplies were depleted faster than expected in 2020 - essentially accelerating the supply-demand rebalancing that was put into motion with the shutdown of the McArthur River mine in 2018. This, coupled with the fact that nuclear power plants around the globe have remained online and using uranium, largely without disruption, through this difficult period, is expected to help move the market towards a long-term sustainable price increase sooner than it otherwise would have, absent COVID-19.
2020 Annual Information Form 17
The uranium price demonstrated stability through the end of 2020, holding between US$29.00 and US$30.00. In December 2020, Cameco announced another temporary suspension of production at Cigar Lake as a result of rising COVID-19 cases in Saskatchewan's far north. While the uranium price increased following this decision, the lack of buying activity as the market slowed for the holiday season seemingly flattened the impact of the announcement. Entering 2021, the market will watch closely to see how long Cigar Lake remains shut down and whether buyers are willing to enter the market before an eventual restart is announced.
Several trade issues in the United States have impacted the nuclear fuel market over the past few years, and the resolution of those matters in 2020 has brought growing market stability. In 2018, a petition was filed with the US Department of Commerce ('DOC') to investigate the import of uranium into the US under Section 232 of the 1962 Trade Expansion Act. In July 2019, the US President ultimately concluded that uranium imports do not threaten national security and no trade actions were implemented. In conjunction with this, a further review was ordered of the nuclear supply chain in the US, and the Nuclear Fuels Working Group ('NFWG') was established. The NFWG reported its findings in April 2020, which, among other recommendations, included a plan to budget US$150 million per year, in each of the next 10 years, for uranium and conversion purchases from US producers to stock the nation's strategic reserve. In December 2020, review and discussion around this matter ended when the US Congress passed a Bill that included initial funding of US$75 million to begin building a US uranium reserve. The Bill passed the US House and Senate with bipartisan support, and was signed into law in late December, 2020.
The review of the Agreement Suspending the Antidumping Investigation on Uranium from the Russian Federation (also known as the Russian Suspension Agreement, or 'RSA') also created uncertainty in the uranium market during 2020, as the RSA was due to expire at the end of the year. A draft amendment, however, was announced in September 2020 and finalized in October 2020. The new arrangement extends the agreement until 2040 and aims to reduce US reliance on Russian uranium products over the next 20 years. The deal negotiated between the US DOC and Russian government reduces Russian exports of the enrichment component from the current level of approximately 20% of US enrichment demand to an average of 17% over the 20-year period, and limits Russian uranium concentrates and conversion components contained in the enriched uranium product to an average equivalent of approximately 7% of US enrichment demand. The agreement's conclusion brought significant clarity and stability to many nuclear fuel market participants.
Overall, uranium demand has grown in recent years as new reactors have been started around the world and demand now exceeds the annual levels that existed prior to Japan shutting down all its nuclear units following the 2011 Fukushima Daichii nuclear incident. According to UxC, as of December 2020, there were 437 nuclear reactors operating in 31 countries and generating nearly 389 GWe - together supplying over 10% of the world's electrical requirements. In addition, there are 58 nuclear reactors being constructed in 18 countries, with a number of countries acting as principal drivers of this expansion, including China, India, South Korea, Russia, and the United Arab Emirates ('UAE'). By 2035, UxC LLC ('UxC') forecasts in its Q1 2021 Uranium Market Outlook ('Q1 2021 Outlook'), under its base case, that operating reactors will increase to 468, generating around 456 GWe. Through this period, annual uranium demand is expected to grow from a projected 175 million pounds U3O8 in 2021 to around 213 million pounds U3O8 by 2035. Importantly, uncovered utility uranium requirements in this period, not including typical inventory building, are over 1.35 billion pounds U3O8.
UxC had estimated annual global uranium primary production in 2020 would be approximately 142 million pounds U3O8.
2020 Annual Information Form 18
This changed materially with the additional curtailment of production as a result of COVID-19. Actual production for 2020 is now estimated by UxC to have been only 124 million U3O8 pounds, which has created an even greater shortfall to 2020 estimated global annual demand of 181 million pounds U3O8. Though rebounding a little from 2020, UxC estimates that primary production in 2021 will remain low at 127 million pounds U3O8, as COVID-19 restarts are offset by the planned shutdown of long-standing production sources including Energy Resources of Australia's Ranger mine and Orano's COMINAK project in Niger. With annual demand for 2021 projected by UxC to be 175 million pounds U3O8, the 2021 differential between primary production and annual demand is projected to remain high, at approximately 48 million pounds U3O8.
With primary mine production in 2020 estimated by UxC to have supplied approximately 68% of the year's estimated base case demand, the balance of demand is expected to have been supplied from secondary sources. These sources include the draw-down of commercial inventories, reprocessing of spent fuel, sales by uranium enrichers and inventories held by governments, such as those held by the US Department of Energy, and the Russian government.
The process of inventory drawdowns is indicative of a market that is approaching an inflection point - where the surplus material that has been easy to procure in past years is diminished and end-users of uranium begin to question where long-term uranium supplies will come from and how secure that supply will be over the long lives of their nuclear reactors. There is a growing sense that market participants are beginning to look beyond near-term market conditions in an attempt to understand what the supply environment will look like in the mid-2020s and beyond. With a renewed focus on nuclear energy as a critical element in the 'energy transition' that many nations are looking to in order to battle climate change, it is expected that global utilities will be looking to source future supply from operations that are not only low-cost, reliable, and situated in stable jurisdictions (the typical criteria for a good supplier), but also those which are flexible and environmentally responsible.
Future and growing reliance on nuclear energy is again being considered by policy makers and interest groups around the world. As many industries were shut down around the globe in 2020 under the strain of COVID-19 related problems, nuclear electricity generation worldwide remained steadfast, providing the secure, baseload electricity needed to drive key infrastructure, including hospitals - all the while producing little to no carbon emissions. Building on the growing world view of the reliability and clean nature of nuclear power, there continued to be many positive news stories emerging on the demand side of the nuclear fuel market throughout 2020, including the following:
● The UAE announced that its first nuclear power plant, Barakah unit 1, achieved initial criticality in July 2020. By December, the unit reached 100% power and is reportedly generating 1400 MW of electricity. Once the other units are operational, the four-unit plant will generate around 25% of the UAE's electricity, preventing the release of up to 21 million tonnes of carbon emissions annually.
● China National Nuclear Corp reported, also in July 2020, that Unit 5 at its Tianwan nuclear power plant attained initial criticality. Construction of the unit began in December 2015. Unit 6 at the site began construction in September 2016. Both are expected to attain full commercial operation before the end of 2021.
2020 Annual Information Form 19
● China continues to be a bright spot in the industry having recently reiterated in-country nuclear growth plans. The government indicated that it would build six to eight nuclear reactors each year between 2020 and 2025 in an effort to get back on track with past goals - aiming to have total capacity installed and under construction to be around 200 GW by 2035. At the end of 2020 China has approximately 49 nuclear reactors in operation, generating 51 GW, and 12 under construction. According to China's Nuclear Energy Association, Chinese nuclear reactors produced 366.2 TWh of electricity in 2020, which represents an increase of roughly 5% compared to 2019. Nuclear power's share of electricity in China was 4.9% in 2020. Looking ahead to 2021 China also is anticipated to announce its 14th Five Year Plan in March, which is expected to continue to emphasize its goals for nuclear energy.
● Russia's Rosatom reported in August 2020 that Unit 2 of the Leningrad II plant successfully reached the minimum controlled power level, meaning that a controlled, self-sustaining reaction had begun in the new reactor. Commercial operation is set to begin in 2021.
● In the US, Southern Companies' Georgia Power reached a milestone in the completion of its new reactor when it took delivery of the first nuclear fuel for Vogtle unit 3. The AP1000 reactor is approximately 96% complete, with fuel loading expected in April 2021. That company also added itself to a growing list of US utilities to announce a commitment to a long-term reduction in greenhouse gas emissions to net-zero emissions by 2050; its ability to reach that goal will be enhanced by completion of its new Vogtle Units 3 & 4.
● In Canada, following the recent reconnection of Unit 2 at Ontario Power Generation's ('OPG') Darlington Nuclear Generating Station, OPG announced another major milestone in September when work commenced on the refurbishment of Unit 3 following a brief postponement related to the COVID-19 pandemic.
● OPG also added its name to the list of utilities committing to achieving net-zero carbon emissions - committing to reach that goal by 2040 and committing to help the markets in which they operate achieve net-zero carbon economies by 2050. The company also announced in November that it would begin advancing plans to locate a small modular reactor ('SMR') at its Darlington site in order to support its net-zero goals. This built on an earlier announcement that OPG would leverage its more than 50 years of nuclear experience to advance engineering and design work with three grid-scale SMR developers, GE Hitachi Nuclear Energy, Terrestrial Energy Inc. and X-Energy LLC.
● The Canadian federal government also reinforced its support for nuclear energy and the development of SMRs, as a pillar in its plans for achieving the country's climate change goals. Federal energy minister, Seamus O'Regan, highlighted the importance of nuclear power multiple times in 2020, including as part of a statement while releasing Canada's national SMR Action Plan which calls for the development, demonstration, and deployment of SMRs.
● Positive nuclear news also emerged from Japan late in 2020 as the country's new leader, Prime Minister Yoshihide Suga, pledged that the country will become carbon neutral by 2050. Japan's current energy plan, set in 2018, calls for 22-24% of its energy to come from renewables, 20-22% from nuclear power, and 56% from fossil fuels. Suga, did not provide details on how Japan would reduce carbon emissions to zero, but said it would promote renewable energy and prioritize safety as it seeks a bigger role for nuclear.
● France's President Macron indicated that nuclear will remain a key part of the country's energy mix, highlighting that the nuclear industry will remain the cornerstone of France's strategic autonomy. Though France has previously said it will cut its reliance on nuclear energy from 75% to 50% by 2035, it is also considering building next-generation EPR nuclear reactors.
2020 Annual Information Form 20
Reinforcing the changing global energy landscape, the International Energy Agency ('IEA') released its first Electricity Market Report in December 2020. The report highlighted growth in renewable electricity generation at the expense of conventional sources, such as coal-fired generation, as well as expectations for nuclear power generation to grow by approximately 2.5% in 2021. The IEA, together with the OECD's Nuclear Energy Agency, also showcased the global competitiveness of nuclear energy as the most dispatchable low-carbon technology, with the lowest expected costs, in the report 'Projected Costs of Generating Electricity 2020', which also refers to a decline in costs for new nuclear power plants owing to lessons learned from recent first-of-a-kind new build projects.
Uranium Demand
According to UxC's Q1 2021 Outlook, global nuclear power capacities are projected to increase to 447 reactors in 33 countries in 2021, generating approximately 398 gigawatts of electricity ('GWe') as new plants come on line. By 2035, that is expected to be 468 reactors, generating approximately 456 GWe in 36 countries. According to the WNA, as of March 2021, current nuclear generation equates to approximately 10% of the world's electrical requirements, with twelve countries producing 25% or more of their country's electricity from nuclear.
According to the WNA, there are currently 54 nuclear reactors under construction in 19 countries with the principal drivers of this expansion being China (16 reactors under construction), India (6), South Korea (4), UAE (3), and Turkey (3). In addition, there are another 97 reactors currently planned around the world.
In the Q1 2021 Outlook, UxC estimates base case demand will be 175 million pounds U3O8 in 2021. UxC also estimates that annual uranium demand could grow to 213 million pounds U3O8 under their base case by 2035 and to almost 300 million pounds U3O8 in their high case in the same period.
Primary Uranium Supply
UxC's Q1 2021 Outlook estimates that world uranium production for 2021 is expected to be approximately 127 million pounds U3O8, a slight increase over 2020's estimated production of 124 million pounds U3O8.
In Canada, Cigar Lake has temporarily suspended production as a result of the COVID-19 pandemic. The Q1 2021 Outlook has estimated that production at Cigar Lake will restart in June 2021, and will produce approximately 11 million pounds U3O8 in 2021. Annual production is then estimated to ramp up to 18 million pounds U3O8 by 2023, before ramping down in 2026 through 2031. McArthur River remains closed indefinitely with no immediate plans for future production, and a decision to restart is expected to be dependent on market conditions. Given the shutdowns of both McArthur River and Cigar Lake, during 2021 Canada is expected to be fourth largest producing nation (down from second largest in prior years), with more than 8% of the world's expected 2021 production. Australia and Namibia are both expected to contribute more than 10% of expected 2021 production, and Kazakhstan is expected to continue to be the world's largest producer of uranium in 2021 by a large margin, representing more than 45% of expected production.
UxC estimates in its Q1 2021 Outlook that existing mine production, plus new planned and potential mine production under its base case, will reach a peak of 147 million pounds U3O8 by 2028, before declining back down to 97 million pounds U3O8 by 2035. At its projected height in 2028, production levels are anticipated to include the resumption of mining at McArthur River, with UxC anticipating the mine will ramp up from 4 million pounds U3O8 in 2026 to 18 million pounds U3O8 by 2027.
2020 Annual Information Form 21
While Kazakhstan is seen to maintain relatively consistent supply in future years, it does start to drop off significantly closer to 2035. In order for other projects to move forward and increase production forecasts, UxC believes uranium prices will need to increase appreciably to support higher cost production profiles and the significant capital expenditures that will be required.
Secondary Uranium Supply
In the Q1 2021 Outlook, primary mine production in 2021 is estimated to supply approximately 73% of the year's estimated base case demand, with the balance of demand expected to be supplied from secondary sources. These sources include commercial inventories, reprocessing of spent fuel, sales by uranium enrichers and inventories held by governments, such as the U.S. Department of Energy, and the Russian government. Primary mine production's share of annual demand remains lower than pre-2017 levels, in which primary production made up 85% or more of annual demand.
Secondary supplies remain a complexity of the uranium market. The Q1 2021 Outlook forecasts that 49 million pounds U3O8 will enter the market from secondary supplies in 2021, leaving a surplus of approximately 1 million pounds U3O8, if the base case demand scenario for 2021 is met.
Though excess commercial inventories, which were one of the major sources of secondary supplies during the period from the early 1970s to the early 2000s, were largely consumed in that same period, the planned shutdown of nuclear programs in countries like Germany, and the continued struggles of the Japanese nuclear program to restart following Fukushima have contributed to commercial inventories again becoming a more significant factor. Government inventories also continue to contribute substantially to the secondary supply picture, particularly in the U.S. and Russia. The disposition of these commercial and government inventories may have a market impact in the near to medium term, although, UxC expects their role will diminish over time as these inventories continue to be depleted and the uranium and enrichment markets rebalance themselves.
In general, UxC expects that secondary sources of supply will fall significantly from estimated 2021 levels of 49 million pounds U3O8 to less than 17 million pounds U3O8 per year by 2035.
Uranium Prices
Imbalances between supply and demand of uranium significantly influence uranium spot prices. According to the Q1 2021 Outlook, it is projected that primary production and secondary supply will be sufficient to meet base case demand for U3O8 through the mid 2020's, with significant supply deficits emerging later in the decade, contributing to upward price momentum.
With respect to long-term prices, utility uncovered requirements and long-term demand are significant influencers. Historically, nuclear utilities have purchased uranium primarily through long-term contracts. These contracts usually provide for deliveries beginning two to four years after they are signed with delivery typically extending anywhere from three or four years to ten years or more. In awarding medium and long-term contracts, electric utilities consider the producer's uranium reserves, record of performance and production cost profile, in addition to the commercial terms offered. Prices are established by a number of methods, including base prices adjusted by inflation indices, reference prices (generally spot price indicators, but also long-term reference prices) and annual price negotiations. Contracts may also contain annual volume flexibility, floor prices, ceiling prices and other negotiated provisions. Under these contracts, the actual price mechanisms are usually confidential.
2020 Annual Information Form 22
The long-term uranium demand that actually enters the market is affected in a large part by utilities' uncovered requirements. This is the amount of uranium required by utilities to operate their fleet that is not yet covered by purchase contracts with suppliers. UxC estimates, in the Q1 2021 Outlook, that uncovered demand for 2021 was under 3 million pounds U3O8. Of course, this uncovered demand increases over time and is projected by UxC to increase significantly over the next decade. While more than 53 million pounds U3O8 are projected to remain uncovered in 2025, this number grows to almost 114 million pounds U3O8 in 2030. In 2035, this number grows to 166 million pounds U3O8 of uncovered demand, or roughly 82% of total expected base case demand in that year. In total just over 1.35 billion pounds U3O8 remain uncovered between 2021 and 2035.
At 166 million pounds U3O8, uncovered demand in 2035 is approximately 69 million pounds U3O8 more than total production expected from existing uranium mines for the same year, which UxC estimates at 97 million pounds U3O8. Uncovered demand in 2035 also exceeds the combined supply available from primary production and secondary sources by approximately 52 million pounds U3O8. In order to address the rising portion of demand that is uncovered, utilities will have to return to the market and enter into long-term contracts. From 2006 to 2010, on average, 39 million pounds U3O8 equivalent were purchased on the spot market per year and roughly 200 million pounds U3O8 equivalent were contracted in the long-term market each year. In contrast, in 2020, 93.6 million pounds U3O8 equivalent were purchased on the spot market, and 56.8 million pounds U3O8 equivalent contracted in the long-term market. Considering contract volumes over the past year remain well below annual requirements, and uncovered requirements are increasing out in time, we expect that long-term contracting activity will continue to increase in the future as utilities look to secure future supply in order to fuel the world's growing fleet of nuclear reactors.
The long-term price is published on a monthly basis and increased slightly in 2020, starting the year at US$32.00 per pound U3O8 and ending the year at US$33.00 per pound U3O8. Nuclear utilities procure their remaining uranium requirements through spot and near-term purchases from uranium producers, traders and other suppliers. Historically, spot prices are more volatile than long-term prices. The spot price began 2020 at US$25.00 per pound U3O8, and increased during the year, in part as a result of COVID-19 related production curtailments, to reach a high of $34.00 before retreating slightly to US$30.00 per pound U3O8 at year end.
Competition
The uranium industry is small compared to other commodity or energy industries. Uranium demand is international in scope, but supply is characterized by a relatively small number of companies operating in only a few countries. Primary uranium production is concentrated amongst a limited number of producers and is also geographically concentrated with more than 75% of the world's production in 2021 projected to be coming from only four countries: Kazakhstan, Canada, Australia and Namibia.
Competition is somewhat different amongst exploration & development companies focused on the discovery or development of a uranium deposit. Exploration for uranium is being carried out on various continents, but in recent years development activities by public companies have been generally concentrated in Canada, Africa and Australia. In Canada, exploration has focused on the Athabasca Basin region in northern Saskatchewan. Explorers have been drawn to this area by the high-grade uranium deposits that have produced some of the most successful uranium mining operations in recent history.
2020 Annual Information Form 23
Within the Athabasca Basin region, exploration is generally divided between activity that is occurring in the eastern portion of the Basin and the western portion of the Basin. The eastern portion of the Basin is a district that is defined by rich infrastructure associated with existing uranium mines and uranium processing facilities. Infrastructure includes access to the provincial power grid and a network of provincial all-weather highways. By comparison, in the western portion of the Basin, there are no uranium mines or processing facilities and access to the provincial power grid is not currently available. Several uranium discoveries have been made in the Athabasca Basin region in recent years, and competition for capital can be intense.
MINERAL RESERVES AND MINERAL RESOURCES
Each of David Bronkhorst, P.Eng, Denison's Vice-President Operations, and Andy Yackulic, P.Geo., Denison's Director, Exploration, is a 'Qualified Person' in accordance with the requirements of NI 43-101, and has reviewed and approved all disclosure of scientific or technical information in this AIF.
Summary of Mineral Reserves and Mineral Resources
NI 43-101 requires mining companies to disclose mineral reserve and resource estimates using the subcategories of proven mineral reserves, probable mineral reserves, measured mineral resources, indicated mineral resources and inferred mineral resources.
The following tables show the Company's estimates of mineral reserves and mineral resources as at December 31, 2020. The estimates are reported in the applicable technical reports prepared in accordance with NI 43-101, adjusted for mining activity where applicable. The summary information below on Denison's proven mineral reserve estimates was prepared from the year-end stockpile survey reported by Orano Canada Inc. ('Orano Canada'), the MLJV operator.
For full details, reference should be made to the applicable technical reports for the properties.
See 'Mineral Properties' for more information.
Proven Mineral Reserve Estimates(1,10)
100% Basis
Company Share(9)
Project/Deposit
Tonnes
Grade
% U3O8
Pounds of U3O8
(,000)
Pounds of U3O8
(,000)
McClean - Ore Stockpile
90,000
0.37
716
161
Total Proven Mineral Reserves
90,000
716
161
Probable Mineral Reserve Estimates(1,2,3,4,10)
100% Basis
Company Share(9)
Project/Deposit
Tonnes
Grade
% U3O8
Pounds of U3O8
(,000)
Pounds of U3O8
(,000)
Wheeler River - Phoenix
141,000
19.1
59,700
53,730
Wheeler River - Gryphon
1,257,000
1.8
49,700
44,730
Total Probable Mineral Reserves
1,398,000
109,400
98,460
2020 Annual Information Form 24
Indicated Mineral Resource Estimates(1,5,10)
100% Basis
Company Share(9)
Project/Deposit
Tonnes
Grade
% U3O8
Pounds of U3O8
(,000)
Pounds of U3O8
(,000)
Wheeler River - Phoenix(7)
166,000
19.1
70,200
63,200
Wheeler River - Gryphon(7)
1,643,000
1.7
61,900
55,700
Wheeler River Subtotal
1,809,000
132,100
118,900
McClean - Caribou
47,800
2.6
2,800
600
McClean - Sue D
122,800
1.1
2,800
600
McClean - McClean North
205,800
2.8
12,400
2,800
McClean Subtotal
376,400
18,000
4,000
Midwest - Midwest Main
453,000
4.0
39,900
10,100
Midwest - Midwest A
566,000
0.87
10,800
2,700
Midwest Subtotal
1,019,000
50,700
12,800
Waterbury - THT (formerly J Zone)
291,000
2.0
12,800
8,600
Total Indicated Mineral Resources
3,495,400
213,600
144,300
Inferred Mineral Resource Estimates(1,6,10)
100% Basis
Company Share(9)
Project/Deposit
Tonnes
Grade
% U3O8
Pounds of U3O8
(,000)
Pounds of U3O8
(,000)
Wheeler River - Phoenix
9,000
5.8
1,100
1,000
Wheeler River - Gryphon
73,000
1.2
1,900
1,700
Wheeler River Subtotal
82,000
3,000
2,700
McClean - Sue D
24,200
0.39
200
0
McClean - Sue E(8)
483,400
0.69
7,300
1,600
McClean - McClean North
3,300
0.79
100
0
McClean Subtotal
510,900
7,600
1,600
Midwest - Midwest Main
793,000
0.66
11,500
2,900
Midwest - Midwest A
53,000
5.8
6,700
1,700
Midwest Subtotal
846,000
18,200
4,600
Waterbury - Huskie
268,000
0.96
5,700
3,800
Total Inferred Mineral Resources
1,706,900
34,500
12,700
Notes:
(1)CIM definitions were followed for classification of mineral reserves and mineral resources. Mineral resources are not mineral reserves and do not have demonstrated economic viability.
(2)Mineral reserves for the Phoenix deposit are reported at the mineral resource cut-off grade of 0.8% U3O8. The mineral reserves are based on the block model generated for the May 28, 2014 mineral resource estimate. A mining recovery factor of 85% has been applied to the mineral resource above the cut-off grade.
(3)Mineral reserves for the Gryphon deposit are estimated at a cut-off grade of 0.58% U3O8using a long-term uranium price of US$40/lb, and a US$/CAD$ exchange rate of 0.80. The mineral reserves are based on the block model generated for the January 30, 2018 mineral resource estimate. The cut-off grade is based on an operating cost of $574/tonne, milling recovery of 97%, and a 7.25% fee for Saskatchewan royalties (basic royalty plus resource surcharge).
(4)Mineral reserves are stated at a processing plant feed reference point and include diluting material and mining losses.
(5)The indicated mineral resources were estimated at various cut-off grades. They are:
●Phoenix:0.80% U3O8
●McClean North:0.10% U3O8
●Gryphon:0.20% U3O8
●Midwest Main:0.10% U3O8(0.085% U)
●Caribou:0.10% U3O8
●Midwest A:0.10% U3O8(0.085% U)
●Sue D:0.10% U3O8
●THT (J Zone):0.10% U3O8
2020 Annual Information Form 25
(6) The inferred mineral resources were estimated at various cut-off grades. They are:
●Phoenix:0.80% U3O8
●McClean North:0.10% U3O8
●Gryphon:0.20% U3O8
●Midwest Main:0.10% U3O8(0.085% U)
●Sue D:0.10% U3O8
●Midwest A:0.10% U3O8(0.085% U)
●Sue E:0.10% U3O8
●Huskie:0.10% U3O8
(7)Indicated mineral resources for Phoenix and Gryphon deposits are inclusive of probable mineral reserves.
(8) The operator conducted confirmatory drilling on a portion of the Sue E mineral resources outside the designated pit and late in 2006 submitted a preliminary analysis detailing an inferred mineral resource of approximately 2 million pounds on a 100% basis in this area, as compared to the 7.3 million pounds that Scott Wilson Roscoe Postle Associates Inc. ('Scott Wilson RPA'), now Roscoe Postle Associates Inc., estimated in its February 2006 technical report. Roscoe Postle Associates Inc. has not re-estimated the mineral resource using the new drill information.
(9)As at December 31, 2020, pursuant to the terms of the agreements with its applicable joint venture partners, the Company had a 90.00% interest in the Wheeler River project, a 22.50% interest in the McClean Lake property; a 25.17% interest in the Midwest project; and a 66.90% interest in the Waterbury Lake property.
(10)Numbers may not add due to rounding.
The table below details the changes to the Company's mineral resource estimates during the fiscal year ended December 31, 2020 from those at December 31, 2019.
Change to Denison's Share of Indicated Mineral Resources
(in thousands of pounds U3O8)
Project/Deposit
December 31, 2019
Additions
(Deletions)
December 31, 2020
Waterbury - THT
8,500
100(1)
8,600
Notes:
(1)
The Company increased its interest in the Waterbury Lake project by 0.33% in 2020, in accordance with the terms of the applicable agreements with Denison's partner on the project. The change was not large enough to reflect a change to Denison's share of inferred mineral resources at Huskie, due in part to rounding.
Historical Estimates
On the McClean Lake property, the McClean South trend is located parallel to and approximately 500 metres south of the McClean North trend (see 'Mineral Properties - McClean Lake'). There are two known mineralized pods which were drilled by the original owner of the property, Canadian Oxy, during 1979-1980: the Southwest Pod and the Southeast Pod. Canadian Oxy prepared estimates of tonnages, grades and contained uranium for these deposits as of 1980, which have not been verified by Denison. The results of these estimates are set out below. The Company is not treating this historical estimate as current mineral resources or mineral reserves.
McClean South Historical Estimates(1,2)
100% Basis
Company's Share
Deposit
Tons
(,000)
Grade
(% U3O8)
Pounds of U3O8
(,000)
Pounds of U3O8
(,000)
Southwest Pod
47.6
2.10
2,000
500
Southeast Pod
126.7
0.73
1,900
400
Notes:
(1) The historical estimates do not comply with the requirement of NI 43-101. CIM definitions are not used.
(2) The historical estimates cannot be verified and are not necessarily indicative of mineralization.
2020 Annual Information Form 26
MINERAL PROPERTIES
Denison's Priority Properties:
●Wheeler River
●Waterbury Lake
●McClean Lake
●Midwest
●Other Exploration Properties
Page 30
Page 65
Page 85
Page 91
Page 99
Denison's mineral property interests are located in the Athabasca Basin region of northern Saskatchewan, the majority of which are located in the eastern portion of the Athabasca Basin, which is host to considerable existing infrastructure including uranium mines and mills, and provincial powerlines and highways (see location map, below). As at December 31, 2020, Denison has interests in 32 mineral properties in the Athabasca Basin, comprised of 204 claims covering 268,725 hectares.
Location Map of Denison's Athabasca Basin Mineral Properties
2020 Annual Information Form 27
Athabasca Basin Overview
The Athabasca Basin covers an area of approximately 100,000 square kilometres in northern Saskatchewan and northeastern Alberta. The Athabasca Basin is one of the principal uranium producing districts in the world and is host to the world's highest-grade and some of the world's largest uranium mines and deposits, including the McArthur River mine and Cigar Lake mine located in the eastern Athabasca Basin.
The uranium deposits are classified as unconformity-associated (also unconformity-related and -type) deposits owing to their spatial association with a major unconformable contact between a relatively undeformed Proterozoic sedimentary basin (the Athabasca Basin) and underlying metamorphosed and deformed Archean to Palaeoproerozoic basement rocks.
A broad variety of unconformity-associated deposit shapes, sizes, and compositions have been discovered. Two distinct varieties have been classified; 1) 'egress-style' polymetallic lenses at and above the unconformity, with variable and often highly elevated base metal and rare earth elements ('REE') contents, and 2) 'ingress-style' vein sets within basement rocks, with typically lower base metal and REE contents.
Egress-style deposits can occur in the sandstone, directly above the unconformity (e.g. Cigar Lake, Sue A and B), straddling the unconformity (e.g. Phoenix, Collins Bay B Zone, Midwest Main, Midwest A, McClean North, Key Lake) or perched high above the unconformity (certain zones at McClean Lake, Midwest, Cigar Lake). Ingress-style deposits are located in the basement rocks (Gryphon, Huskie, Eagle Point, Sue C, Sue E, Millennium, Arrow, Triple R), however the Millennium deposit, and to an extent the Gryphon deposit, also contain subordinate mineralization at and above the unconformity. The Shea Creek deposits contain mineralization in the basement, deep in the basement, at the unconformity, and perched in the sandstone. In some deposit areas, there is a plunge to the mineralized pods from sandstone-hosted to basement-hosted within deposit-scale strike lengths (Rabbit Lake-Collins Bay-Eagle Point trend, Sue trend deposits, McClean North).
The Athabasca unconformity-associated deposits are typically related to graphite-bearing structural zones within the metamorphosed and deformed Archean to Palaeoproerozoic basement rocks, which are often termed 'corridors' or 'trends'. Alteration 'halos' or 'envelopes' tend to surround the mineralization, most notably in the overlying sandstone, and provide an enlarged exploration target through the detection of diagnostic alteration clays and geochemical pathfinder elements. Empirical exploration for the deposits typically involves mapping of structural corridors/trends by geophysical methods, dominantly electromagnetics, resistivity or magnetics, followed by drill testing given the buried or blind nature of the deposits below glacial cover or Athabasca sandstone, respectively. Drill core is subject to a variety of sampling and analytical methods to determine possible vectors toward mineralization, and downhole surveying is commonplace to test for elevated radioactivity or reconcile geophysical responses. The significant number of Athabasca uranium discoveries to date has also led to the development of numerous exploration models which are commonly used to facilitate interpretations and prioritize target areas.
Historical uranium production in the basin was initiated in the 1970s and 1980's using conventional open pit mining methods at Rabbit Lake, Cluff Lake and Key Lake. Later in the mine life of each of Cluff Lake and Rabbit Lake, there was a transition to underground mining of other deposits on those properties. In the 1990s another open pit operation at McClean Lake began production.
2020 Annual Information Form 28
The discovery of high-grade deposits such as Midwest, McArthur River and Cigar Lake in the 1980s did not immediately lead to production. The combination of challenging ground conditions (most notably the friable and water-saturated Athabasca sandstone conditions above the mineralization), depth, and the high-grade nature of the deposits, required extensive research and development to design safe extraction methods before production was possible. Production from McArthur was achieved in the early 2000s while Cigar Lake only initiated production in 2014. Production from these mines was only made possible by their unique combination of high grades (average grades > 10% U3O8) and large scale (>300 million lbs U3O8), as well as the development of innovative mining techniques including ground freezing combined with either raise-bore mining or the use of the jet-boring mining system (JBS). The Midwest deposits are smaller in size than McArthur River and Cigar Lake, and remain undeveloped.
In terms of mineral processing, each historic mining operation included a dedicated processing plant: Cluff Lake, Key Lake, Rabbit Lake and McClean Lake operations included on-site processing plants. Due to the rising cost of construction for such facilities and the availability of highways and other infrastructure in Saskatchewan's North, processing of ores has transitioned to toll milling at existing facilities. McArthur River ore production is toll milled at the Key Lake mill, while Cigar Lake production is toll milled at the McClean Lake mill. With the suspension of operations at Rabbit Lake in 2016 and McArthur River in 2018, only the Cigar Lake mine and the McClean Lake mill continued to operate and produce yellowcake in Saskatchewan.
In March 2020, Cameco and Orano Canada announced the temporary closure of the Cigar Lake Mine and the McClean Lake Mill, in connection with the COVID-19 pandemic. Production resumed in September 2020, but in December 2020, Cameco and Orano Canada announced another temporary suspension of production at Cigar Lake as a result of a resurgence of COVID-19 cases in Saskatchewan's far north. As a result, as at the date hereof, there is no active uranium production in the Athabasca Basin.
2020 Annual Information Form 29
Wheeler River
The Wheeler River project is the largest undeveloped uranium project in the infrastructure rich eastern portion of the Athabasca Basin region, in northern Saskatchewan. The project is host to the high-grade Phoenix and Gryphon uranium deposits, discovered by Denison in 2008 and 2014, respectively, and is a joint venture between Denison (90%) and JCU (Canada) Exploration Company Limited (10%). Denison is the operator/manager of the project.
The PFS for the Wheeler River project was completed in 2018, considering the potential economic merit of developing the Phoenix deposit as an ISR operation and the Gryphon deposit as a conventional underground mining operation. Taken together, the project is estimated to have mine production of 109.4 million pounds U3O8 over a 14-year mine life, with a base case pre-tax NPV of $1.31 billion (8% discount rate), IRR of 38.7%, and initial pre-production capital expenditures of $322.5 million. The Phoenix ISR operation is estimated to have a stand-alone base case pre-tax NPV of $930.4 million (8% discount rate), IRR of 43.3%, initial pre-production capital expenditures of $322.5 million, and industry leading average operating costs of US$3.33/lb U3O8. The results of the PFS are described in greater detail below.
A technical report entitled 'Prefeasibility Study Report for the Wheeler River Uranium Project Saskatchewan, Canada' dated October 30, 2018 (the 'Wheeler PFS Report') has been prepared for the project, a copy of which is available on the Company's website. The principal author of the Wheeler PFS Report was Mr. Mark Liskowich, P.Geo. of SRK, who is an independent Qualified Person in accordance with the requirements of NI 43-101.
The Wheeler PFS Report describes the results of the PFS for the Wheeler River project with an effective date of September 24, 2018, based in part upon the mineral resource estimates for the Gryphon deposit effective January 30, 2018 and the Phoenix deposit effective May 28, 2014.
Except as otherwise indicated, the following project description is a summary, supported by the Wheeler PFS Report. We recommend you read the Wheeler PFS Report in its entirety to fully understand the technical aspects of the project. The conclusions, projections and estimates included in this description are subject to the qualifications, assumptions and exclusions set out in the Wheeler PFS Report and in the 'Risk Factors' set forth below; in particular, any advancement or development of the Wheeler River project is subject to attainment of any required approvals, agreements or resources, including capital funding.
Given social, financial and market disruptions related to the onset of the COVID-19 pandemic, Denison suspended certain activities at Wheeler River, including the Environmental Assessment program; the program is on the critical path to achieving the project development schedule outlined in the PFS. On November 9, 2020, Denison announced its decision to restart the EA effective January 2021. However, uncertainty associated with the temporary suspension remains and the Company is not yet able to estimate the impact to the project development schedule outlined in the PFS, and users are cautioned that the estimates provided therein regarding the start of pre-production activities in 2021 and first production in 2024 should not be relied upon.
Property Description, Location and Access
The property is located along the eastern edge of the Athabasca Basin in northern Saskatchewan, Canada and is located approximately 35 km north-northeast of the Key Lake mill and 35 km southwest of the McArthur River uranium mine.
2020 Annual Information Form 30
Access to the property is by road or air from Saskatoon. The property is well located with respect to all-weather roads and the provincial power grid. Vehicle access to the property is by the provincial highway system to the Key Lake mill then by the ore haul road between the Key Lake and McArthur River operations to the eastern part of the property. An older access road, the Fox Lake Road, between Key Lake and McArthur River, provides access to most of the northwestern side of the property. Gravel and sand roads and drill trails provide access by either four-wheel-drive or all-terrain-vehicle to the rest of the property.
The property consists of 19 mineral claims totaling 11,720 hectares, with an aggregate annual requirement of $293,000 in either work or cash to maintain title to the mineral claims. Based on previous work submitted and approved by the province of Saskatchewan, title is secure until 2041.
The Wheeler River project is located within the boundaries of Treaty 10 (entered into between the Government of Canada and the First Nations People of Saskatchewan and Alberta). It is also located within the traditional territory of the English River First Nation and in the homeland of the Métis, each of whom have identified a strong and significant relationship to the land.
Location Map, Showing Regional and Proposed Infrastructure.
2020 Annual Information Form 31
Any uranium produced from the Wheeler River property is subject to uranium mining royalties in Saskatchewan in accordance with Part III of The Crown Mineral Royalty Regulations. See 'Government Regulation - Canadian Royalties.' There is also a 10% Net Profits Interest ('NPI') associated with the property held by the WRJV in proportion to the ownership interests of each WRJV participant. There are no other back-in rights or third-party royalties applicable to this property.
There are no known environmental liabilities associated with the property. Before work can be performed on the property, the appropriate exploration or other permits must be applied for and obtained. If Denison was unable to satisfy its obligations with respect to the regulatory and consultation process and obtain the necessary permits, the Company's plans for exploration or other work on the property could be delayed or halted. See 'Risk Factors' for more information on this and other potential risks that may affect access, title or the right or ability to perform work on the property. For surface exploration and evaluation activities that may occur in 2021, the Company has obtained or applied for all necessary permits. Additional permits and licenses may be required in connection with the Company's project evaluation activities beyond 2021 and will be required (refer to section 20 of the Wheeler PFS Report) prior to commencement of development and production activities.
History
The Wheeler River property was staked on July 6, 1977, due to its proximity to the Key Lake uranium discoveries, and on December 28, 1978, it was vended into an agreement between AGIP Canada Ltd., E&B Explorations Ltd. and Saskatchewan Mining Development Corporation, with each holding a one-third interest. On July 31, 1984, each party divested a 13.3% interest and allowed Denison Mines Limited, a predecessor company to Denison, to earn in to a 40% interest.
In late 2004, Denison entered into an agreement to earn a further 20% interest by expending $7,000,000 within six years. In connection with that, Denison became the project operator (2005 being the first full year of operatorship). In 2007, when the earn-in obligations were completed, the participating and ownership interests were Denison 60%; Cameco 30%, and JCU 10% and they remained that way up to the end of 2016. In January 2017, Denison, Cameco and JCU executed an agreement, pursuant to which the WRJV Parties agreed to allow for a one-time election by Cameco to fund 50% of its ordinary share (30%) of joint venture expenses in 2017 and 2018. The shortfall in Cameco's contribution was funded by Denison, in exchange for a transfer to Denison of a portion of Cameco's interest in the WRJV.
Accordingly, Denison's share of joint venture expenses was 75% in 2017 and 2018, and Cameco and JCU's participating share of joint venture expenses was 15% and 10%, respectively. As a result of that agreement, Denison's interest increased to approximately 66%, with Cameco holding approximately 24% and JCU holding 10%.
Subsequently, Denison and Cameco completed the Cameco Transaction, pursuant to which Denison acquired all of Cameco's minority interest in the WRJV effective October 26, 2018, resulting in WRJV participating and ownership interests being Denison 90% and JCU 10%.
2020 Annual Information Form 32
Exploration and Development History
Period (Year)
Activity
1978-Present
The area was previously explored by AGIP and SMDC (Cameco). Since 1978, several airborne and ground geophysical surveys have defined 152 km of conductor strike length in 14 conductive zones.
1986-1988
AGIP, SMDC, and Cameco drilled a total of 192 drill holes encountering sub-economic uranium mineralization in the M Zone (1986), O Zone (1986), and K Zone (1988). Rare earth element mineralization was also discovered in the MAW Zone (1982).
2004
Denison assumed operatorship in late 2004 and initially focused on exploration drilling on the western side of the quartzite ridge (west side of the property) intersecting sub-economic uranium mineralization.
2008
During a regional exploration campaign, three resistivity targets were drilled leading to the discovery of the Phoenix deposit.
2008-2014
During this period, drilling predominantly focused on delineation of the Phoenix deposit.
2014-2017
Exploration drilling at K North in early 2014 resulted in the discovery of the Gryphon deposit. Delineation drilling of the Gryphon deposit was undertaken throughout this period. A Preliminary Economic Assessment was completed for the Project in early 2016.
2018-PFS
A Pre-Feasibility Study was completed for the Project in late 2018. Exploration drilling undertaken on regional targets.
Post-PFS: 2019
Initial field program was completed within the Phoenix orebody evaluating the ISR mining method.
Post-PFS: 2020
Further field programs were completed within the Phoenix orebody. In addition, exploration drilling along the K West conductive trend in late 2020 resulted in the discovery of new high-grade unconformity hosted uranium mineralization. Additional delineation drilling completed in areas of lower confidence surrounding the defined extents of the current Phoenix resource model.
Geological Setting, Mineralization and Deposit Types
The Wheeler River property is located near the southeastern margin of the Athabasca Basin in the southwest part of the Churchill Structural Province of the Canadian Shield. The Athabasca Basin is a broad, closed, and elliptically shaped cratonic basin with an area of 425 km (east-west) by 225 km (north-south). The bedrock geology of the Athabasca basin area consists of Archean and Paleoproterozoic gneisses unconformably overlain by up to 1,500 m of flat-lying unmetamorphosed sandstones and conglomerates of the mid-Proterozoic Athabasca Group.
The Wheeler River property is located near the transition zone between two prominent litho-structural domains within the Precambrian basement, namely the Mudjatik Domain to the west and the Wollaston Domain to the east. The Mudjatik Domain is characterized by elliptical domes of Archean granitoid orthogenesis separated by keels of metavolcanic and metasedimentary rocks, whereas the Wollaston Domain is characterized by tight to isoclinal, northeasterly trending, doubly plunging folds developed in Paleoproterozoic metasedimentary rocks of the Wollaston Supergroup, which overlie Archean granitoid orthogenesis identical to those of the Mudjatik Domain. The area is cut by a major northeast-striking fault system of Hudsonian Age. The faults occur predominantly in the basement rocks but often extend up into the Athabasca Group due to several periods of post-depositional movement.
2020 Annual Information Form 33
Local geology is comprised of relatively undeformed late Paleoproterozoic to Mesoproterozoic Athabasca Group strata comprised of Manitou Falls Formation sandstones and conglomerates which unconformably overlie the crystalline basement and have a considerable thickness from 170 m over the quartzite ridge to at least 560 m on the western side of the property. Basement rocks beneath the Phoenix and Gryphon deposits are part of the Wollaston Domain and are comprised of metasedimentary and granitoid gneisses. The metasedimentary rocks include graphitic and non-graphitic pelitic and semipelitic gneisses, meta-quartzite, and rare calc-silicate rocks. Pegmatitic segregations and intrusions are common in all units with garnet, cordierite, and sillimanite occurring in the pelitic strata, indicating an upper amphibolite grade of metamorphism. Graphitic pelite and quartzite units appear to play important roles in the genesis of Athabasca Basin unconformity-associated deposits. Thus, the presence of extensive subcrop of both units (18 km of quartzite and 152 line-km of conductors, assumed to be graphitic pelite) greatly enhances the geological potential of the Wheeler River property. The Wheeler River property is partially covered by lakes and muskeg, which overlie a complex succession of glacial deposits up to 130 m in thickness. These include eskers and outwash sand plains, well-developed drumlins, till plains, and glaciofluvial plain deposits. The orientation of the drumlins reflects southwesterly ice flow.
The Phoenix uranium deposit was discovered in 2008 and can be classified as an unconformity-associated deposit of the sandstone-hosted or egress-style variety. The deposit occurs dominantly within sandstone immediately above the sub-Athabasca unconformity approximately 400 metres below surface and comprises three elongate pods of mineralization (Zone A, B, and C) which cover a strike length of 1.1 kilometres. Zone A, the largest of the three pods, is approximately 380 metres in length, up to 80 metres wide, up to 15 metres thick, and consists of an exceptionally high-grade core (62,900 tonnes at 43.2 % U3O8 for 59.9 million pounds U3O8 in estimated Indicated resources) surrounded by a lower grade shell. The deposit occurs along a prominent post-Athabasca basement thrust fault (WS Shear) which occurs footwall to a graphite-rich pelitic gneiss unit and hangingwall to a garnetiferous pelitic gneiss and quartzite unit. Mineralization within the Phoenix deposit is dominated by massive to semi-massive uraninite associated with an alteration assemblage comprising hematite, dravitic tourmaline, illite, and chlorite. Secondary uranium minerals (including uranophane) and sulphides are trace in quantity.
The Gryphon uranium deposit was discovered in 2014 and can be classified as an unconformity-associated deposit of the basement-hosted or ingress-style variety. The deposit occurs within southeasterly dipping crystalline basement rocks below the regional sub-Athabasca Basin unconformity. The deposit is located from 520 to 850 metres below surface, has an overall strike length of 610 metres and dip length of 390 metres, and varies in thickness between two and 70 metres, depending on the number of mineralized lenses present. The mineralized lenses are controlled by reverse fault structures, which are largely conformable to the basement stratigraphy and dominant foliation. The A, B, and C series of lenses are comprised of stacked, parallel lenses which plunge to the northeast along a fault zone (G-Fault) which occurs between hangingwall graphite-rich pelitic gneisses and a more competent pegmatite-dominated footwall. A ubiquitous zone of silicification (Quartz-Pegmatite Assemblage) straddles the G-Fault and the A, B, and C series of lenses occur in the hangingwall of, within, and in the footwall of the Quartz-Pegmatite Assemblage respectively. The D series lenses occur within the pegmatite-dominated footwall along a secondary fault zone (Basal Fault) or within extensional relay faults which link to the G-Fault. The E series lenses occur along the G-Fault, up-dip and along strike to the northeast of the A and B series lenses, within the upper basement or at the sub-Athabasca unconformity.
2020 Annual Information Form 34
Mineralization within the Gryphon deposit lenses is dominated by massive, semi-massive, or fracture-hosted uraninite associated with an alteration assemblage comprising hematite, dravitic tourmaline, illite, chlorite, and kaolinite. Secondary uranium minerals (including uranophane and carnotite) and sulphides are trace in quantity.
Exploration and Drilling
As operator, Denison has conducted numerous geophysical surveys across the property, generating many drill targets over several years. Airborne surveys have included two electromagnetic surveys (totaling 2,005 line kilometres) and one gravity survey (totaling 1,711 line kilometres). Ground surveys have included four electromagenetic surveys (488 line kilometres), 10 resistivity surveys (979 line kilometres), two gravity surveys (2,920 stations) and 45 downhole geophysical surveys. Results to date indicate the property comprises multiple prospective trends that warrant drill testing. These trends are interpreted primarily from magnetic and electromagnetic and/or resistivity data to infer the location of faulted graphitic basement horizons that may have associated uranium mineralization.
Denison has completed 392,552 metres of exploration diamond drilling in 764 holes on the Wheeler River property during the period from 2005 to the end of 2020. The majority of this drilling has been focused on the discovery and delineation of the Phoenix (270 holes totaling 123,377 metres) and Gryphon (214 holes totaling 120,351 metres) deposits.
Discovery and Delineation of the Phoenix Deposit
In the summer of 2008, as a direct result of the 2007 DC resistivity survey along the hanging wall of the quartzite ridge, two drill holes were located 600 metres apart along the same low resistivity trend. This drilling intersected a zone of characteristic sandstone alteration and uranium mineralization linked to unconformity-associated uranium deposits. All drill holes during the summer of 2008 intersected either uranium mineralization or very strong alteration close to mineralization.
Subsequent drilling programs conducted during 2009 and 2010 extended the mineralized zone for a strike length of greater than 900 metres. An initial mineral resource estimate was completed at the end of 2010. Aggressive drilling programs in 2011 and 2012 successfully added additional mineral resources. In 2013, drilling was completed at the Phoenix deposit, but a large portion of the 2013 Wheeler River drilling program was also allocated to exploration of several other target areas on the property. Some additional infill drilling was completed at the Phoenix deposit in early 2014, and this work was successful in extending some high grade mineralization into areas previously modeled as low grade. These results, combined with results from 2013, were the catalyst for the updated mineral resource estimate for the Phoenix deposit effective May 2014.
Discovery and Delineation of the Gryphon Deposit
In March 2014, drill hole WR-556 resulted in discovery of the Gryphon deposit, intersecting uranium mineralization averaging 15.33% U3O8 over 4.0 metres in basement graphitic gneiss, 200 metres below the sub-Athabasca unconformity. The Gryphon deposit occurs on the K-North trend, which exhibits numerous favourable exploration criteria including basement quartzite and graphitic gneisses, basement structures, reverse offsets of the unconformity, weak basement hosted mineralization near the unconformity, and anomalous sandstone geochemistry and alteration.
2020 Annual Information Form 35
Historical holes ZK-04 and ZK-06 drilled in the late 1980s, along the K-North trend, targeted unconformity-related mineralization and intersected favourable sandstone structure and alteration as well as alteration and weak mineralization in the basement approximately 35 metres below the unconformity. Follow-up drilling campaigns attempted to locate unconformity mineralization up dip of the weak basement mineralization. Gryphon deposit discovery drill hole WR-556 was the first to evaluate the down dip projection of these intersections into the basement.
Since the discovery hole at Gryphon, subsequent drilling campaigns in 2014 and 2015 were completed and an initial resource estimate was released in November 2015. Additional mineralization was discovered immediately northeast of Gryphon in 2016, which was subsequently named the 'D Series Lenses'.Continued drilling during 2016 and 2017 was focused on expanding the mineral resources at Gryphon and increasing the level of confidence from an inferred to indicated category and an updated mineral resource estimate for the Gryphon deposit was released in January 2018. Drilling was completed during 2018 (15,621 metres in 23 drill holes), successfully extending the Gryphon deposit to the northeast by approximately 200 metres; however these results have yet to be included in a mineral resource estimate. The Gryphon deposit remains open in numerous areas and the 2018 results confirm potential to continue to expand the Gryphon mineral resource outside of the current extents of the deposit.
Post-PFS: 2019 Regional Exploration Drilling Activities
Denison conducted winter and summer diamond drilling programs at Wheeler River during 2019, totalling 10,573 metres in 20 holes. The programs focused on testing regional exploration target areas (K West, Q South East, K South, O Zone) where the potential exists to identify additional high-grade uranium deposits that could potentially become satellite operations for the planned Phoenix ISR operation. The 2019 winter drilling program was highlighted by WR-756, which encountered weak, unconformity-hosted uranium mineralization along the southern portion of the K West trend, approximately 2 kilometres southwest of the Gryphon deposit. WR-756 intersected 0.03% U3O8 over 1.5 metres, and 1.3% Cu and 0.13% Ni over 4.0 metres, and 0.18% Co over 6.0 metres, located immediately above the sub-Athabasca unconformity.
While no uranium mineralization was encountered at Q South East, K South, or O Zone, drilling in each area identified indicative structure and alteration coincident with weakly anomalous uranium geochemistry. Drilling at Q South East, intersected structured and hydrothermally altered sandstone, unconformity offset of 16 metres and basement stratigraphy identical to the Phoenix deposit. Additional targets exist along strike, particularly to the northeast along the Quartzite Ridge's eastern edge, which is largely untested for 8.8 kilometres.
Drill tests of DCIP resistivity targets at the O Zone confirmed the presence of a major post-Athabasca thrust fault with an unconformity offset of over 60 vertical metres and associated significant sandstone structure and hydrothermal alteration. Additional targets exist over the 3 kilometres of interpreted strike length along the O Zone thrust fault.
At K South, drill hole WR-749 intersected anomalous uranium in both the upper sandstone (average 1.29 parts per million ('ppm') uranium from 15 to 130 metres) and the lower sandstone (average 1.03 ppm uranium from 360 to 435 metres). The lower sandstone was also marked by significant hydrothermal alteration including anomalous clay signatures up to 80 metres above the unconformity. The granite intersected at the unconformity, at 465 metres, indicates the drill hole overshot the optimal target. The highly anomalous sandstone signatures indicate compelling future targets remain to the southeast, and along strike, where graphitic basement rocks and associated structure are interpreted to occur (subcrop) at the unconformity.
2020 Annual Information Form 36
Post-PFS: 2020 Exploration Drilling Activities
During 2020, exploration drilling focused on the Phoenix deposit with the objective of upgrading portions of the mineral resource that lie within the planned ISR freeze containment from Inferred Mineral Resources so that may be incorporated into a future FS. Priority target areas included the 'A/B Gap' (between Zones A and B), Zone B, and Zone C.
Once drilling at Phoenix was completed, the focus of the 2020 drill program shifted towards evaluating regional target areas. Drilling was completed at both K West and M Zone.
Phoenix Zone A and Zone B
Eight diamond drill holes totalling 3,796 metres were completed to test the extents of known mineralization at Zones A and B (See locations in figure below). While several drill holes intersected weak uranium mineralization, the only notable potential extension of existing mineralization was reported in drill hole WR-765D1 in Zone B - which intersected 0.36% U3O8over 3.5 metres (from 401.3 to 404.8 metres;drilled at an azimuth of 332.3° and an inclination of -79.6°), approximately 15 metres east of WR-333 (which previously intersected 14.6% U3O8over 6.0 metres).
Phoenix Deposit - 2020 Exploration Drilling

Phoenix Zone C
Zone C is the southwestern-most known mineralized zone at Phoenix. Prior to the 2020 drilling program, Zone C was defined over a strike length of approximately 250 metres by only five mineralized intersections. As a result of the lack of historical drilling at Zone C, no resource estimate exists for the mineralization previously identified at Zone C.
2020 Annual Information Form 37
The 2020 drilling program at Phoenix was designed to test the continuity and extents of known mineralization at Zone C: 11 drill holes were completed in 2020 for a total of 3,633 metres. Three of these drill holes at Zone C returned uranium mineralization, successfully extending the mineralized zone's strike length by approximately 20 metres to the southwest and delineating a potential high-grade mineralized 'core.' Additional drilling will be required to determine the extent of uranium mineralization at Zone C. Mineralized intersections from 2020 drilling at Zone C are outlined in the table below, and identified in the 'Phoenix Deposit - 2020 Exploration Drilling' figure above.
Phoenix Zone C Mineralized Intersections
Hole-ID
From (m)
To (m)
Length (m)
U3O8(%)
WR-328D11,3,4
376.4
381.4
5.0
5.69
WR-767D11,3,4
382.0
384.5
2.5
8.84
WR-7712,3,4
376.5
377.5
1.0
0.89
Notes:
(1)
Intersection interval is composited above a cut-off grade of 1.0% U3O8;
(2)
Intersection interval is composited above a cut-off grade of 0.1% U3O8;
(3)
WR-328D1 was drilled at an azimuth of 333.7°, inclination of -80.3°; WR-767D1 was drilled at an azimuth of 310.4°, inclination of -79.3°; WR-771 was drilled at an azimuth of 310.0°, inclination of -79.5°; and
(4)
Lengths indicated are the down-hole length and do not represent the true thickness of mineralization. True thickness is estimated to be approximately 98% of stated downhole length.
Regional Exploration
2020 Regional Exploration Drilling Program Target Areas
2020 Annual Information Form 38
K West
The K West fault, which lies within the K West conductive trend, at or near the contact between a graphitic pelite and underlying Archean granite, is the primary exploration target in this area. The K West fault has been drill-defined over a strike length of approximately 15 km, on both the Wheeler River property and on adjacent properties located to the north of Wheeler River, where several zones of high-grade unconformity-hosted mineralization have been identified (including on Denison's 30% owned Mann Lake property). Historical drilling at K-West, which has been interpreted to have intersected the unconformity anywhere from 30 to 100 metres hangingwall of the K West fault, has defined a broad zone of anomalous uranium pathfinder geochemistry, specifically copper, nickel, and cobalt.
A total of 6 drill holes were completed at K-West as part of the 2020 exploration program, including drill hole WR-741AD1, which was designed to test the up-dip projection of the K West fault intersected in 2018 by drill hole WR-741A. WR-741AD1, intersected weak mineralization hosted within a narrow breccia approximately 3 metres below the unconformity, located at the upper contact of the K-West fault. In addition, composite sandstone samples from WR-741AD1 returned highly anomalous copper and nickel concentrations over the lower 310 metres of the sandstone column.
WR-741AD2 was drilled 10 metres to the northwest of WR-741AD1, to test the extents of the mineralization identified below the unconformity. WR-741AD2 intersected high-grade uranium mineralization that is interpreted to straddle the unconformity contact. In addition, low-grade mineralization was encountered straddling the unconformity in WR-775, located approximately 400 m to the south of WR-741AD2.
K West Mineralized Intersections
Hole-ID
From (m)
To (m)
Length (m)
U3O8(%)
WR-741AD11,3
644.8
647.8
3.0
0.42
WR-741AD21,4
640.3
644.3
4.0
2.14
(includes)2
643.3
644.3
1.0
7.66
WR-7751,5
594.4
595.4
1.0
0.30
Notes:
(1)
Intersection interval is composited above a cut-off grade of 0.1% U3O8;
(2)
Intersection interval is composited above a cut-off grade of 1.0% U3O8;
(3)
drilled at an azimuth of 295.7° and an inclination of -71.0°;
(4)
drilled at an azimuth of 294.3° and an inclination of -63.0°;
(5)
drilled at an azimuth of 282.0° and an inclination of -74.0°; and
(6)
lengths indicated are the down-hole length and do not represent the true thickness of mineralization.
2020 Annual Information Form 39
K West - 2020 Drilling
M Zone
Regional exploration drilling was also completed at the M Zone target area during the 2020 Wheeler River exploration program. M Zone is located approximately 5.5 kilometres east of Phoenix and lies roughly 700 metres from the McArthur River - Key Lake haul road. Denison's exploration team conducted a core-relogging program in 2018 and identified several historical drill holes at M Zone that encountered indicative structure, alteration, elevated radioactivity or anomalous pathfinder geochemistry worthy of follow-up.
A total of 4 drill holes were completed at M Zone as part of the 2020 exploration program, including drill hole WR-778, which was designed to test the subcrop of a graphitic fault at the sub-Athabasca unconformity that was previously intersected at depth in DDH ZM-17. WR-778, intersected a wide reverse fault zone in the lower sandstone, highlighted by multiple basement wedges, intense hydrothermal alteration, and a broad interval of weak uranium mineralization.
The presence of basement wedges in WR-778 and an interpreted unconformity elevation offset of 25 metres indicates that the broad zone of weak mineralization is controlled by a large reverse fault. See figures 'Phoenix Deposit - 2020 Exploration Drilling' above and 'M Zone - 2020 Drilling' below, illustrating the location of the 2020 M Zone drilling.
Weak uranium mineralization was returned along the nose of basement wedges within a broad reverse fault zone, as summarized in the table below. Due to extensive core loss, the mineralized intervals are reported as the radiometric equivalent uranium ('eU3O8') derived from a total gamma down-hole probe. Taken together, the results from WR-778 present a model that may be similar to Zone 4 at McArthur River.
2020 Annual Information Form 40
While the mineralization at M Zone is significantly lower grade than McArthur, there are many similarities, and future exploration drilling is expected to test if the area is analogous to Zone 4 at McArthur River.
M Zone Mineralized Intersection
Hole-ID
From (m)
To (m)
Length (m)
eU3O8(%)
WR-7782
397.1
407.3
10.2
0.08
And
411.2
414.2
3.0
0.08
Notes:
(1)
Due to core loss, the interval is reported as radiometric equivalent U3O8(eU3O8) derived from a calibrated total gamma downhole probe;
(2)
Intersection interval is composited above -a cut-off grade of 0.1% eU3O8; drilled at an azimuth of 304° and an inclination of -80.0°; and
(3)
Lengths indicated are the down-hole length and do not represent the true thickness of mineralization.
M Zone - 2020 Drilling
Proposed 2021 Wheeler River Exploration Program
Exploration activities are planned for 2021, with the primary objective to evaluate the potential for unconformity-associated uranium mineralization along several prospective corridors on the Wheeler River project: K West, M Zone, Gryphon South, N Zone, and Quartzite East. The Company believes these areas are either under-explored or are where historical drilling has returned highly anomalous results that have not been adequately followed up.
Testing the extent of the high-grade mineralization intersected in 2020 at K West will be the first objective of the 2021 program, as Denison continues the evaluation of this highly prospective trend. It is anticipated that a minimum of four holes will be drilled at K West in 2021.
2020 Annual Information Form 41
Additional drilling is also currently planned for M Zone, to follow up WR-778, which intersected weak uranium mineralization associated with a broad fault zone containing several basement wedges. It is anticipated that four holes will be drilled at M Zone as part of the 2021 program.
Evaluation Activities
Subsequent to the completion of the PFS in 2018, project development and evaluation activities have pivoted towards initiating and supporting EA and FS processes for Phoenix. Work during 2019 focused on (a) those activities necessary to support and move forward the environmental assessment process (see 'Government Regulation - Environmental Assessments' below), which is currently expected to take 36-48 months to complete from initiation, and (b) those engineering and other studies required to de-risk the Phoenix deposit as an ISR mining operation.
Engineering and other studies completed in 2019 included (i) ISR field programs, including the installation of CSWs at Phoenix, as the first CSWs designed for ISR mining in the Athabasca Basin, and (ii) further ISR metallurgical laboratory testing for uranium recovery (see 'Mineral Processing and Metallurgical Testing, below).
Highlights of the 2020 evaluation program at Wheeler River include field work at the Phoenix deposit, important metallurgical testing for leaching at low temperatures and the separation of iron and radium precipitates from the uranium bearing solution, and a study to evaluate the use of a freeze wall rather than a freeze dome design for the proposed Phoenix ISR project (see 'Mining Evaluation and Development Operations', below). In addition, input criteria for the EA and the installation of additional groundwater monitoring wells around the Phoenix deposit were completed during the year.
Post-PFS - 2019 Field Program
The 2019 field program was designed to assess the permeability of Phoenix, and to collect an extensive database of hydrogeological data to further evaluate the ISR mining conditions present at Phoenix. This data is of critical importance to the advancement of Phoenix as an ISR mining operation - as it is expected to support a detailed assessment of the ISR requirements related to permeability, and be further incorporated into a detailed ISR mine plan as part of the completion of a future FS.
The Company successfully completed the planned ISR field work and safely concluded operations on site at Wheeler River during the fourth quarter of 2019. The field activities associated with the 2019 field program were completed over a period of approximately 23 weeks (starting in June and completed in late November), and required the support of approximately 40 Denison employees and contractor staff.
The objectives of the program were extensive, and the scope of the work completed on site during the program was considerable. The following represent the key components of field work completed as part of the 2019 field program:
Installation of 4 small-diameter pump/injection ('P/I') wells.
Installation of 11 small-diameter observation wells within and outside the Phoenix orebody.
Installation of 2 test wells containing Vibrating Wire Piezometers ('VWPs'), equipped with pressure transducers, at different depth locations.
2020 Annual Information Form 42
Installation of 12 small-diameter regional observation wells, for environmental monitoring and baseline data collection.
Installation of 1 re-charge well, for recharging formation test waters.
Completion of a series of short-duration hydrogeological tests within the small-diameter wells to identify hydraulic connectivity between test wells.
Installation of 2 large-diameter CSWs (CSW1 and CSW2) within the ore zone.
Deployment of a permeability enhancement tool in each CSW to complete an array of lateral drill holes (penetration tunnels) designed to enhance access from each CSW to the existing permeability within the ore zone.
Completion of a further series of short-duration preliminary and long-duration hydrogeological tests, using each of CSW1 and CSW2 to pump water from or inject water into the ore zone.
Completion of extensive permeameter testing in the field, utilizing a portable nitrogen gas probe permeameter adapted for testing whole drill core pieces.
The 2019 field program achieved each of the program's planned objectives, and was highlighted by several key de-risking accomplishments, including the following:
Confirmation of significant hydraulic connectivity within the Phoenix ore zone;
Installation of the Athabasca Basin's first CSWs for ISR;
Confirmation of limited hydraulic connectivity within the underlying basement units, supportive of a lower aquatard;
Demonstration of the effectiveness of permeability enhancements to increase CSW access to existing permeability; and
Confirmation of ability to achieve hydraulic conductivity values consistent with PFS.
Post-PFS - 2020 Field Program
A hydrogeologic model was created for Phoenix, developed based on actual field data collected from the 2019 field program. The modelling, produced by an independent consulting firm, demonstrated a hydrogeologic 'Proof of Concept' for the application of ISR mining method at Phoenix, with respect to potential operational extraction and injection rates.
The ISR field work completed in 2020 was designed with the primary objective of building additional confidence in the results of the independent hydrogeologic 'Proof of Concept' model.
The hydrogeological data collected as part of the 2020 field program is expected to build additional confidence in the Company's understanding of the fluid pathways within Test Area 1 and Test Area 2 of the 2019 field program (see '2020 Hydrogeological Test Area Wells' figure, below), to further validate the Company's hydrogeologic model for Phoenix, and to support the design and permitting of field tests in future years, which are expected to support a future FS.
Key elements of the completed 2020 field program included:
2020 Annual Information Form 43
Hydrogeological Test Work
Based on the positive results from the hydrogeologic model, the Company developed and commenced the 2020 ISR field program to further evaluate and verify the ISR mining conditions present at Phoenix by supplementing the extensive dataset acquired in the 2019 Field Test. 17 pump and injection tests were completed between Test Area 1 and Tests Area 2 at Phoenix Zone A. The data collected is expected to provide additional insight into individual well capacities and the overall hydrogeological network of the deposit areas.
Permeameter Analysis
Over 1,000 additional drill core samples were collected from historic holes, dried, and analyzed for permeability and porosity. Samples were selected to refine the Company's understanding of the mineralized hydrogeologic horizons, including the low permeability basement rocks and the overlying sandstone.
Rock Mechanics
Mineralized core samples were collected and shipped to SNC Lavalin for rock mechanics tests, including tensile strength and uniaxial compressive strength. The samples targeted various previously identified hydrogeologic units, including the Upper Clay Zone, Lower Clay Zone and High-Grade Friable Zone. Results from these tests will be utilized to better define the design of certain permeability enhancement techniques for subsequent field programs.
Groundwater Sampling
Groundwater samples were collected from eight different environmental monitoring wells in the Phoenix deposit area. Sampling occurred at several horizons within each well, including the horizons above, below, and within the Phoenix ore body. Samples have been submitted to the Saskatchewan Research Council ('SRC') for analysis. Once received, data from these samples will be utilized to support the design and permitting of additional field tests expected to be incorporated into a future FS.
Installation of Additional Environmental Monitoring Wells
Five additional monitoring wells were installed in two clusters, located approximately 500 metres northeast of Phoenix and 750 metres southeast of Phoenix (see '2020 Environmental Sampling Wells' figure, below). The additional monitoring wells will allow for the collection of groundwater flow information at locations further away from the Phoenix deposit than had been previously studied, providing additional data for the site groundwater model. This is intended to allow for long-term monitoring and the modelling of ground water impacts, which will be an important element of the effects assessments in an EIS.
Post-PFS - 2021 Field Program Planning
In late 2020, Denison advanced its plans for additional field testing at Phoenix in 2021. The 2021 ISR field program has been designed to (1) further de-risk, evaluate and confirm the hydrogeological and geochemical characteristics of the Phoenix ore body through a series of additional hydrogeological and tracer tests, (2) finalize the production well design pattern and spacing, (3) confirm cost estimates for optimized commercial scale wells, (4) further evaluate and confirm additional permeability enhancement techniques and their relative application and
2020 Annual Information Form 44
(5) ultimately set-up for a subsequent lixiviant test currently contemplated for 2022. The lixiviant test is considered a potential key milestone for the project, intended to confirm technical feasibility while verifying the permeability, leachability and containment parameters needed for the successful application of ISR mining at the Phoenix deposit.
2020 Hydrogeological Test Area Wells, shown on Basement Geology Map
2020 Annual Information Form 45
2020 Environmental Sampling Wells, Shown on Site Orthophoto
Mineral Processing and Metallurgical Testing
A number of metallurgical testing programs have been undertaken at the project, to evaluate the mineral processing potential for both the Gryphon and the Phoenix deposits.
2014-2018
In 2014, preliminary metallurgical test work was initiated to assess the basic metallurgical properties of the deposit ores. In 2017 and 2018, advanced metallurgical testing was completed, to test mill performance at extremes of potential ore feed grades and impurity levels, as well as optimize processing parameters. Results of this testing are incorporated in the Wheeler PFS Report.
In summary, for both the Phoenix and Gryphon deposits, results of the testing indicate that ores are readily amenable to acid base leaching with high uranium extraction rates. Performance in terms of retention time, reagent usage and consumption are all consistent with current industry operating parameters. Test work results were positive, with results generally in line with capacities at existing plants and with yellowcake produced meeting all specifications from ASTM C967-13 'Standard Specifications for Uranium Ore Concentrate'.
2020 Annual Information Form 46
In order to support the evaluation of a contemplated ISR operation for Phoenix, during the PFS process, Denison completed Leach Amenability Studies (Bottle Roll Tests) and column leach tests from 2016 to 2018. Testing included subjecting appropriate ore samples to various pH, ORP and other solution characteristics and monitoring progress of leaching over time. Results of these initial tests demonstrated Phoenix ore responded strongly to acid leach conditions with low impurities removal, extremely low reagent consumption levels and high uranium recovery.
2019-2021
In December 2019, Denison initiated the next phase of ISR metallurgical laboratory testing for uranium recovery at Phoenix, which will utilize the mineralized drill core recovered through the installation of various test wells during the 2019 ISR field program. The metallurgical laboratory test program builds upon the laboratory tests completed for the recovery of uranium as part of the project's PFS and is expected to further increase confidence and reduce risk associated with the application of the ISR mining method. The results are expected to facilitate detailed mine and process plant planning as part of a future FS, and will provide key inputs for the EA process. Significant components of the metallurgical laboratory test program include core leach tests, column leach tests, bench-scale tests and metallurgical modelling.
Metallurgical test work commenced in the fourth quarter of 2019 and has continued to-date:
Core Leach Tests:
Specialized core leach tests involve the testing of intact mineralized core samples, representative of the in-situ conditions at Phoenix, to evaluate uranium recovery for the ISR mining method. Mineralized core samples of between 0.75 metres and 1.5 metres in length were obtained from the 2019 ISR field program. A triple-tube method of core recovery was employed to ensure the core could be recovered with minimal breakage and would be representative of the in-situ Phoenix ore. Core samples were collected to represent the various ore types and grade ranges (~1% to 60% U3O8) at Phoenix.
The specialized laboratory apparatus used for these tests allows for intact core samples (5 centimetres to 25 centimetres in length) to be mounted within a flexible sleeve with a confining pressure applied to the exterior of the sleeve. Lixiviant (in the case of Phoenix, an acid-bearing mining solution) can then be injected into the intact core at one end of the sample without having a way to by-pass the intact core. As a result, the lixiviant travels through the core to the other end of the sample, where a uranium bearing solution is recovered. The tests utilize mining solution (or lixiviant) with acid and oxidant concentrations, and injection pressures, and temperatures similar to those envisaged during commercial ISR operations. Denison considers this type of specialized test of intact competent core samples to be the most representative available laboratory test of the natural leach conditions of the host rock. Accordingly, these tests are expected to provide important detailed metallurgical recovery data to inform the Company's understanding of the potential scope of the start-up, steady state, and closure of ISR wells.
In February 2020, the Company reported on the results from the initial core leach tests. At that time, over 50 days of testing had been completed on a mineralized core sample recovered from drill hole GWR-016. The core sample was recovered from between 405 and 407 metres below surface within the extent of the high-grade core of Phoenix Zone A. Various parameters for lixiviant composition (including both acid and oxidant concentration) have been tested to date. In all cases, the lixiviant is injected into the core continuously and only interrupted periodically if a change in the lixiviant composition is required.
2020 Annual Information Form 47
After the initial test startup, uranium bearing solution recovered from the core sample returned uranium content in the range of 13.5 g/L to 39.8 g/L. The average uranium concentration returned over the last 20 days of testing was 29.8 g/L - which represents a uranium content that is approximately 200% higher than (or three times) the minimum level used for the ISR process plant design in the PFS of 10 g/L.
Several additional core leach tests are currently planned for 2021, involving various cores representative of the differences in grade and permeability within the Phoenix deposit.
Column Leach Tests:
Additional core samples in the same grade ranges (~1% to 60% U3O8) were obtained from the 2019 ISR field program and preserved for metallurgical tests. These samples will be crushed and packed into test columns at the test facility, in order to complete traditional column leach tests utilizing the same mining solutions as the Core Leach Tests. The testing is expected to provide additional data on the recovery of uranium, and any other metals, from the various ore types and grade ranges associated with the Phoenix deposit under the envisaged ISR mining conditions. The purpose of the Column Leach Tests is to correlate data from the specialized Core Leach Tests to the traditional ISR laboratory testing methods used during the PFS. Additionally, the Column Leach Tests are able to generate uranium bearing solutions in larger quantities for further laboratory testing of the process plant flowsheet.
Bench Scale Tests:
Upon completion of the Core Leach Tests and Column Leach Tests, Bench-Scale Tests of each unit operation in the proposed flowsheet is planned. These tests are expected to use the uranium-bearing solution produced from both of the Leach Tests. The data from the Bench-Scale Tests is expected to provide key details for plant design for impurity removal, uranium precipitation, solid liquid separation, reagent usage and water treatment.
Metallurgical Modelling:
Concurrent with these tests, Denison is building a metallurgical simulation model with the basic parameters for mass, energy and water balances. The data from all laboratory tests will be incorporated into a model update once testing is completed.
Iron/Radium Removal from Uranium Bearing Solution ('UBS'):
The operating plan envisioned for the Phoenix deposit results in minimal 'contaminants of concern' remaining on surface at mine closure. The process plant will be designed to remove essentially all contaminants of concern at the front end of the plant with precipitation of Iron and Radium as the first unit operation. Testing to date has indicated that to remove the majority of iron and radium contaminants would result in the capture of approximately 1% of the uranium in the precipitate, and testing of this process and the recovery of such uranium, were undertaken in 2020 and expected to continue in 2021.
2020 Annual Information Form 48
Low Temperature Leach Tests:
The temperature of the Phoenix deposit at 400 m depth is estimated to be 5 to 10 degrees Celsius. Most uranium mills run their leach circuits at 20 to 50 degrees Celsius. Due to this significant temperature difference, 2020 test work was undertaken at lower temperatures to determine the lixiviant concentrations required to counter the lower leaching kinetics experienced at lower temperatures. Conclusions from completed tests indicate that varying the lixiviant composition can compensate for the impact of lower temperature on the rate of leaching.
Sampling, Analysis and Data Verification
See 'Athabasca Exploration: Sampling, Analysis and Data Verification' for details.
Mineral Reserve and Mineral Resource Estimates
RPA, an independent technical consulting firm with relevant experience, was retained by Denison on behalf of the WRJV to prepare and audit the mineral resource estimates for the Gryphon and Phoenix deposits in accordance with CIM Definition Standards (2014) and NI 43-101. The Wheeler PFS Report contains a combined mineral resource estimate for the Wheeler River project, with effective dates for the mineral resource estimates for the Gryphon and Phoenix deposits of January 30, 2018 and May 28, 2014, respectively. See 'Mineral Reserves and Mineral Resources', above, for a summary of the combined mineral resource estimate for the Wheeler River project.
Phoenix Deposit Mineral Resource Estimation Methodology
Geology, structure, and the size and shape of the mineralized zones have been interpreted using data from 243 diamond drill holes which resulted in three-dimensional wireframe models that represent 0.05% U3O8 grade envelopes. The mineralization model generally consists of a higher-grade zone within an envelope of lower grade material, resulting in two main estimation domains - higher grade and lower grade. Additionally, a small zone of structurally controlled basement mineralization was modelled at the north end of the deposit.
Based on 196 dry bulk density determinations, Denison developed a formula relating bulk density to uranium grade which was used to assign a density value to each assay. Bulk density values were used to weight grades during the resource estimation process and to convert volume to tonnage.
Uranium grade times density ('GxD') values and density ('D') values were interpolated into blocks in each domain using an inverse distance squared ('ID2') algorithm. Hard domain boundaries were employed such that drill hole grades from any given domain could not influence block grades in any other domain. Very high-grade composites were not capped but grades greater than a designated threshold level for each domain were subject to restricted search ellipse dimensions in order to reduce their influence. Block grade was derived from the interpolated GxD value divided by the interpolated D value for each block. Block tonnage was based on volume times the interpolated D value.
The mineral resources estimated for the Phoenix deposit were classified as indicated or inferred based on drill hole spacing and apparent continuity of mineralization. The block models were validated by comparison of domain wireframe volumes with block volumes, visual comparison of composite grades with block grades, comparison of block grades with composite grades used to interpolate grades, and comparison with estimation by a different method.
2020 Annual Information Form 49
Gryphon Deposit Mineral Resource Estimation Methodology
The three-dimensional mineralized wireframes were created by Denison utilizing Gemcom software following detailed interpretation of the deposit geology and structure. The wireframes were defined using a threshold of 0.05% U3O8 and minimum thickness of two metres. One higher grade domain was defined within the A1 lenses and three higher grade domains were defined in the D1 lenses based on a threshold of 4.0% U3O8. The wireframes and drilling database were sent to RPA for grade modelling following QAQC which included ensuring the wireframes were 'snapped' to the drill hole mineralized intervals.
Based on 279 dry bulk density determinations, a polynomial formula was determined relating bulk density to uranium grade which was used to assign a density value to each assay. Bulk density values were used to weight grades during the resource estimation process and to convert volume to tonnage. Uranium GxD values and D values were interpolated into blocks measuring 5 metres by 1 metre by 2 metres using an ID2 algorithm since variograms were not considered good enough to derive kriging parameters. Hard domain boundaries were employed at the wireframe edges, so that blocks within a given wireframe were only informed by grade data from that wireframe. For the A1 high-grade domain, assays were capped at 30% U3O8 with a search restriction applied to composite grades over 20% and for the D1 high-grade domains, assays were capped at 20% U3O8 with no search restriction. For the A1-A4, B3-B7, C4-C5 and D2-D4 low-grade domains, assays were capped at 10% U3O8. For the C1 low-grade domain, assays were capped at 20% U3O8 with a search restriction applied to composite grades over 10%. For the B1, B2, E1 and E2 low-grade domains, assays were capped at 15% U3O8 with search restrictions applied to composite grades over 10% U3O8 for the B1 domain and 5.0% U3O8 for the E2 domain. For the D1 low-grade domain, assays were capped at 5% U3O8. Block grade was derived from the interpolated GxD value divided by the interpolated D value for each block. Block tonnage was based on volume times the interpolated D value.
The mineral resources estimated for the Gryphon deposit were classified according to the drill hole spacing and the apparent continuity of mineralization, as either indicated mineral resources (generally, drill hole spacing of 25 x 25 metres) or inferred mineral resources (generally, drill hole spacing of 50 x 50 metres). The block models were validated by comparison of domain wireframe volumes with block volumes, visual comparison of composite grades with block grades, comparison of block grades with composite grades used to interpolate grades, and comparison with estimation by a different method.
Phoenix and Gryphon Deposit Reserve Calculations
The mineral reserve for the Phoenix and Gryphon deposits are summarized in the following table. For Phoenix, the ISR process has been designed to a level appropriate for a PFS and mineral reserve estimation, with application of appropriate modifying factors including geological, mining, hydrogeological, metallurgical and cut-off grades. The Gryphon mine design has been completed to a level appropriate for a PFS and the mineral reserve estimation, with application of appropriate modifying factors including geological, mining recovery and dilution and cut-off grades. The estimated mineral reserves are based on previously estimated indicated mineral resources, which are converted to probable reserves.
2020 Annual Information Form 50
Mineral Reserve Estimate - Wheeler River Project - September 1, 2018
Deposit
Category
Tonnes
Grade(% U3O8)
Million lbs U3O8(100% Basis)
Phoenix
Probable
141,000
19.1
59.7
Gryphon
Probable
1,257,000
1.8
49.7
Total
1,398,000
3.5
109.4
Notes:
1. CIM definitions (2014) were followed for classification of mineral reserves.
2. Mineral reserves for the Phoenix deposit are reported at the mineral resource cut-off grade of 0.8% U3O8 and are based on the block model generated for the May 28, 2014 mineral resource estimate. Mining recovery factor of 85% has been applied to the mineral resource above the cut-off grade.
3. Mineral reserves for the Gryphon deposit are estimated at a cut-off grade of 0.58% U3O8 using a long-term uranium price of US$40/lb, and a US$/CAD$ exchange rate of 0.80. The mineral reserves are based on the block model generated for the January 30, 2018 mineral resource estimate. The cut-off grade is based on an operating cost of $574/tonne, milling recovery of 97%, and a 7.25% fee for Saskatchewan royalties (basic royalty plus resource surcharge).
4. Mineral reserves are stated at a processing plant feed reference point and include diluting material and mining losses.
5. Numbers may not add due to rounding.
Mining Evaluation and Development Operations
Phoenix
ISR mining has become the industry's leading low-cost uranium production method globally - following on from initial use in the 1960s to extensive use at present in Kazakhstan (the world's largest and lowest cost producer of uranium), the United States, China, Russia, and Australia, amongst others. ISR mining is amenable to uranium deposits in certain sedimentary formations and is well known in the industry for comparatively minimal surface impact, high production flexibility, and low operating and capital costs. In 1998, ISR mining represented roughly 13% of global uranium production, increasing rapidly to the point where it was estimated to account for over 50% of global uranium production as at the date of the Wheeler PFS. There has been continuous development and improvement of ISR mining techniques in past years, particularly in the two decades since the International Atomic Energy Agency ('IAEA') published the Manual of Acid In-Situ Leach Uranium Mining Technology (IAEA-TECDOC-1239).
ISR mining involves recovery of uranium by pumping a mining solution (also referred to as a 'lixiviant') through an appropriately permeable orebody. The method eliminates the need to physically remove ore and waste from the subsurface - thus eliminating the related surface disturbance and tailings normally related to underground or open pit operations. The mining solution dissolves the uranium as it travels through the ore zone - effectively reversing the natural process that originally deposited the uranium. The mining solution is injected into the ore zone through a series of cased drill holes called injection wells and pumped back to surface via a similar series of recovery wells. The collective of the various injection and recovery wells is referred to as a wellfield. Once on surface, the uranium bearing solution is sent to a surface processing plant for the chemical separation of the uranium. Following the uranium removal, the mining solution is reconditioned (often referred to as the barren mining solution) and returned back to the wellfield for further production.
ISR wellfields are designed to effectively target delineated mineralization and achieve the operation's desired production level. At present, the Company expects the drilling of individual wells will be carried out utilizing either air rotary or mud rotary methods.
2020 Annual Information Form 51
The wellfield at Phoenix has been designed using a standard hexagonal pattern with 10m spacing between wells.
Containment of the solution is a requirement in ISR operations to ensure recovery of the uranium and to minimize regional groundwater infiltration into the ore zone and associated dilution of the mining solution. In typical ISR operations, this is normally achieved through natural clay or other impermeable geological layers.
At Phoenix, the basement rock below the orebody achieves this purpose but the sandstone formation which hosts and surrounds the ore zone is not impermeable. As a result, in order to maintain containment, it is proposed that the entire orebody will be isolated by use of an artificial freeze wall (see below for more information). Circulation of a low temperature brine solution in the holes will remove heat from the ground, freezing the natural groundwater, and establishing an impermeable frozen wall encapsulating the deposit.
Benefits of ISR operations generally include:
Established safety practices and procedures to ensure health and safety of workers.
Minimal environmental impacts, including low noise, dust, and air emissions, low water consumption levels, minimal surface disturbance, and full rehabilitation of the area.
Ability to scale production up or down to meet market demands.
Insensitivity to ore grades (i.e. lixiviants will dissolve the uranium at any grades).
Low initial capital costs and short timeframe to production.
Low operating costs.
The Company's evaluation of the ISR mining method at Phoenix, as detailed in the PFS, has identified several significant environmental and permitting advantages, particularly when compared to the impacts associated with conventional uranium mining in Canada. The PFS's plan for the proposed ISR mining operation is expected to produce no tailings, generate very small volumes of waste rock, and has the potential for low volumes or possibly no treated water discharge to surface water bodies, as well as the potential to use the existing power grid to operate on a near zero carbon emissions basis.
The planned use of the freeze wall, to encapsulate the ore zone and contain the mining solution used in the ISR operation, has the potential to streamline the mining process, minimize interaction with the environment, and facilitate controlled reclamation of the site at decommissioning.
Taken together, ISR mining at Phoenix has the potential to be one of the most environmentally friendly uranium mining and processing operations in the world.
Phoenix Freeze Wall
In December 2020, Denison announced the results of a trade-off study completed post-PFS, assessing the merit of adopting a freeze wall design as part of the ISR mining approach planned for Phoenix. Based on the results of the trade-off study, a freeze wall design has the potential to offer significant environmental, operational, and financial advantages compared to the freeze cap (or freeze 'dome') design previously planned for the project and included in the project's PFS.
2020 Annual Information Form 52
Accordingly, the Company has decided to adapt its plans for the Project to use a freeze wall in future Project design and environmental assessment efforts. The trade-off study highlights the potentially significant benefits anticipated from a freeze wall design:
Enhanced environmental design:
The freeze wall design provides full hydraulic containment of the ISR wellfield by establishing a physical perimeter around the mining area, which will extend from the basement rock underlying Phoenix to surface - enhancing environmental protection in the area of the ISR mining operation, thereby minimizing potential environmental impacts during the life of the operation, while still establishing a defined area for decommissioning and reclamation;
Lower technical complexity and operational risks:
A freeze wall is expected to be installed using existing and proven vertical or angled diamond drilling methods, rather than the directional / horizontal drilling approach proposed in the PFS to establish a freeze cap. The use of conventional diamond drilling methods is expected to substantially decrease the technical complexity associated with project construction. Similarly, the adaptation of previous plans (described in the PFS), to remove the cap design is expected to significantly reduce operational risks by eliminating the potential intersection of freeze holes during the installation of future ISR wells as the ISR wells will no longer have to pierce a freeze cap to access the mining horizon;
Expected reduction in initial capital costs, with phased mining approach:
The PFS freeze cap design contemplated the use of a small number of large horizontal freeze holes to encapsulate the entire Phoenix deposit at depth prior to first production. In contrast, the freeze wall design, which consists of vertical / angled freeze holes, provides the flexibility for a phased mining approach that requires a relatively limited initial freeze wall installation to commence mining, with additional ground freezing occurring throughout the life of the mine in sequential phases. This is likely to reduce the project's upfront capital requirements and initial ground freezing time.
Strengthened project sustainability:
The predominant drilling method used in the freeze wall design is conventional diamond drilling. This existing and proven method is widely employed and established in northern Saskatchewan. Accordingly, it is anticipated that Denison will be able to leverage the existing skilled work force in the region to increase business and employment opportunities for residents of Saskatchewan's north.
2020 Annual Information Form 53
The trade-off study provides for mining to occur over 5 phases, as outlined in the tables below. This approach is expected to match the overall mine production schedule of the PFS.
Freeze Wall Phased Mining Approach
Phase 1
Phase 2
Phase 3
Phase 4
Phase 5
Total
Reserves (% of total)*
36%
26%
14%
15%
9%
100%
Expected Life (months)
43
31
17
19
11
121
*Note: These amounts are estimates and projections only and do not include Phoenix Zone B2 reserves of 133,000 lbs U3O8, representing 0.2% of the total reserves for Phoenix outlined in the PFS. This expected change is driven by the estimated costs and other assumptions set forth in the PFS plus the estimated incremental cost of an expansion of the freeze wall, rendering mining in this area uneconomic. The aggregate reserves, and many of the assumptions and qualifications related thereto, as well as the mine plan associated with the declared reserves are set forth in the Wheeler River PFS.
Freeze Wall Holes Drilled Per Phase
Phase 1
Phase 2
Phase 3
Phase 4
Phase 5
Total
Expected (# of holes)
57
41
54
52
118
322
Expected Meterage
24,500
17,600
23,200
22,400
50,700
138,400
The currently forecasted freeze wall construction requirements for Phase 1 include 57 vertical freeze holes with 24,500 metres of diamond drilling. For comparison, the PFS model for the freeze cap included 30 horizontal freeze holes installed during construction for an overall drilling meterage of 32,700 m, using more expensive horizontal drilling methods. With the freeze wall design, subsequent mining phase areas would be established prior to completion of mining in the previous phase area to provide uninterrupted mineproduction.
The freeze wall phased approach is anticipated to minimize initial capital and construction timeline requirements for the Project by spreading out the freeze wall construction over the life of mine. Only the Phase 1 freeze wall is required during initial construction to achieve first mine production. A reduced initial freeze wall also has a reduced initial freeze plant capacity requirement. As the freeze plant is modular in design, the freezing capacity can also be deferred over the life of mine. The projected lower initial capital requirements associated with the phased freeze wall approach are expected to have positive impacts on the economics of the Project.
2020 Annual Information Form 54
Proposed Phoenix Wellfield and Freeze Wall Containment Configuration
2020 Annual Information Form 55
Gryphon
The extraction strategy for Gryphon, as described in the PFS, has not changed from the approach described in the Company's preliminary economic assessment released in March 2016. The planned mining method for Gryphon is conventional longhole stoping with backfill. Longhole stoping is a widely used conventional mining method applied in both the Canadian uranium industry as well as in the broader mining industry for the extraction of base metals, gold, and other commodities.
According to the planned approach, access to the Gryphon deposit will be established through two shafts. The primary shaft will provide for movement of personnel and supplies, ore/waste hoisting, and fresh air to the underground operations. The second shaft will be solely for exhaust air and secondary egress. Both shafts will be excavated through blind boring methods. Blind bored shafts have been selected for vertical access in favour of typical full-face shaft sinking with cover grouting or freeze curtain protection. Blind bored shafts offer more competitive costs and construction schedules, and a reduced risk profile while sinking through saturated ground conditions. A composite steel/concrete liner will be installed over the full length of the shaft and grouted into basement rock.
In the underground operation, initial underground development will focus on establishment of permanent infrastructure and flow through ventilation between the main shaft and the exhaust shaft. Most of the permanent infrastructure will be located on the 500 m level, the level of the main shaft station. Following this, development priorities will be to establish access to the E series lense (E Zone), which provides early opportunity for ore production and waste rock storage (in mined out stopes). As mining is initiated in the E Zone, ramp development will continue to provide access to the remainder of the ore zones.
The PFS also assumes that the ore will be hoisted to surface and transported to the McClean Lake mill for processing. A two-year ramp-up to full production is planned, with the full production rate set at 9 million pounds U3O8 per year. Processing at the McClean Lake mill will require the negotiation and execution of a toll milling agreement, which is not currently established, and will also require regulatory approvals, which have not been obtained.
After careful consideration of the risks and opportunities associated with concurrent permitting and advancement of project engineering activities, the Company decided to submit a Project Description and initiate the Environmental Assessment process in early 2019 to support the advancement of the Phoenix ISR operation, and to bring the Gryphon operation forward at a later date (still in line with the PFS plan of Gryphon first production by 2030).
Processing and Recovery
Phoenix
The uranium bearing solution from the Phoenix wellfield will be directed to a self-contained processing facility located adjacent to the wellfield. The processing plant is expected to house most of the process equipment in a 46,500 square foot pre-fabricated metal building.
The proposed processing plant for the Phoenix ISR process will have four major circuits: impurities removal, yellowcake precipitation, dewatering/drying, and packaging. The processing plant will also have filtration systems, bulk chemical storage, process solution storage tanks, and a control room.
2020 Annual Information Form 56
As described above, Denison is currently conducting additional leaching tests at the Saskatchewan Research Council laboratories in Saskatoon. The future results from these tests are expected to form the basis for the Processing Plant designs planned to be incorporated into a future FS. Testing is expected to include all unit operations currently included in the flow-sheet from the PFS, as summarized in the figure below.
Phoenix ISR Processing Plant Design
Broadly, the ISR processing plant design at Phoenix involves the beneficiation of the uranium bearing solution recovered from the wellfields and pumped to the processing plant, as described below:
Impurities removal - Uranium liberated from underground in the Phoenix deposit will be routed to an iron/radium removal circuit, where the pH of the solution will be adjusted to allow the precipitation of iron hydroxide and other metals. Once the iron hydroxide has precipitated out of the solution, the solution will be routed to the primary yellowcake precipitation circuit.
Yellowcake precipitation - The solution will be pH adjusted to optimal levels for uranium precipitation with sodium hydroxide, then yellowcake product will be precipitated with hydrogen peroxide, using sodium hydroxide (or other suitable high pH solution) to maintain optimal pH. Following uranium precipitation into yellowcake slurry, the barren mining solution will be reconstituted to the proper acid level prior to being pumped back to the wellfield for reinjection.
2020 Annual Information Form 57
Yellowcake dewatering/drying - The precipitated yellowcake slurry will be transferred to a filter press, where excess liquid will be removed. Following a fresh water wash step that will further clean the yellowcake product, the resulting yellowcake will be transferred to the dryer, which will further reduce the moisture content, yielding the final dried, free-flowing product.
Packaging - Refined yellowcake will be packaged in 55-gallon drums.
Taken together, the processing plant is expected to achieve 98.5% recovery of uranium from the uranium bearing solution. The simplified processing plant design, together with the use of the freeze cap, creates a closed loop system with the prospect of achieving zero discharge of effluent to the environment. The different types of chemical reagents will be stored, used, and managed to ensure worker and environmental safety, in accordance with standards developed by regulatory agencies and vendors.
Gryphon
The PFS plan assumes that Gryphon ore will be transported to the McClean Lake mill for processing.
The results of the metallurgical test work program completed for the PFS indicate that the Gryphon deposit is amenable to recovery utilizing the existing McClean Lake mill flowsheet. Moreover, the deposit is amenable to processing under similar conditions to those currently used in the McClean Lake mill. The mill is currently processing material from the Cigar Lake mine; however, it has additional licenced processing capacity to a total annual production of up to 24 million pounds U3O8. Overall process recovery based on metallurgical test work conducted to date has been estimated at 98.4% for Gryphon ore.
Should Denison proceed with processing the Gryphon deposit at the McClean Lake mill, such processing will require certain modifications to the McClean Lake mill. These modifications include expansion of the leaching circuit, the addition of a filtration system to complement the Counter Current Decantation (CCD) circuit capacity, the installation of an additional tailings thickener, and expansion of the acid plant. Various other upgrades will also be required throughout the mill to permit production at the full 24 million pounds per year U3O8 licenced capacity, as described in greater detail in the PFS.
Infrastructure, Permitting and Compliance Activities
As a remote northern greenfield site, the Wheeler River project would require substantial infrastructure to support operations. The site is located approximately 5 kilometres from a provincial highway and powerline. Tie-ins from that infrastructure into site would be required.
Additional surface infrastructure required to be located at the sites would include:
5 km access road from provincial highway 914 to site;
5 km power distribution line from provincial power grid into site; and
1,600 m airstrip.
In accordance with the plan, production from the Gryphon site will be trucked to the existing McClean Lake mill to the northeast, via existing Provincial Highway 914, including 51 km of new road required between the McArthur River mine and the Cigar Lake mine.
2020 Annual Information Form 58
The large scale infrastructure described above and the existing regional infrastructure in the proximity to the Wheeler River project is illustrated in the figure below.
Wheeler River Regional Infrastructure
The figure below reflects the conceptual plan for the Phoenix operation's surface facilities, showing the relative scale and nominal footprint of site infrastructure, including (all estimated sizes are approximate):
Area allocation over the defined deposit for an ISR wellfield (90 m x 800 m);
ISR processing plant (90 m x 48 m);
Operations centre (61 m x 41 m), including men's and women's dry facilities, 3-bay maintenance shop, welding bay, warehouse, emergency response vehicle storage, mine rescue and emergency response office, laboratory, nurse's station, training room, offices (administration, maintenance, and supply chain), meeting rooms, lunch room, and radiation monitoring room;
150-person camp with kitchen and laundry facilities;
Personal-vehicle parking;
Main electrical substation (50 m x 50 m);
North and south gatehouses;
Outdoor and covered storage (15 m x 30 m);
Wash bay and scanning facility;
2020 Annual Information Form 59
30 m long, 80 tonne weigh scale;
Potable water treatment facility;
Fuel storage and dispensing facility (gas and diesel);
Fire water tank and pumphouse;
Two bullet propane tank farm;
Sewage treatment facility;
Incinerator;
Backfill plant with storage facility;
Outdoor fenced hazardous storage area (30 m x 30 m);
Fenced landfill area (90 m x 90 m);
Water discharge station;
Special waste storage (46 m x 46 m, 3,200 cubic metre capacity); and
Clean waste rock storage (60 m x 60 m, 7,100 cubic metre capacity).
Phoenix Site Conceptual Layout
Taken together, the Phoenix operation has the potential to be one of the most environmentally friendly uranium mining projects in the world. Per the plan in the PFS:
The planned ISR approach produces no tailings.
The closed loop system of the processing plant has the potential to eliminate any major sources of treated water to be discharged to the environment. Due to evaporation and moisture content of the yellowcake product, the processing plant may require small volumes of make-up water.
2020 Annual Information Form 60
Minimal volumes of surface run-off will be captured, treated, and used as make-up water in the processing plant, re-injected underground or processed in the water treatment plant.
Low to near zero carbon emissions due to the lack of heavy equipment and provision of power from the provincial power grid.
Small volumes of waste products from the iron precipitation circuits will be temporarily stored on surface and disposed of in the underground stopes at Gryphon or other suitable long term storage facility.
At Gryphon, the most significant environmental concern associated with the project will be the management of treated mine effluent. Investigations into environmentally acceptable discharge locations has identified suitable sites nearby that will minimize any impacts from treated effluent discharge. Other waste products, such as potentially acid generating waste rock or low-grade waste products, will be used underground as backfill on a priority basis where possible. Otherwise, such materials will be stored in approved facilities designed for safe closure and decommissioning. Future studies will evaluate the potential for 100% underground storage to eliminate the need for surface facilities.
Denison believes all potential environmental impacts associated with the planned Phoenix or Gryphon operations can be successfully mitigated through the implementation of industry best practices.
The project will require completion of Federal and Provincial environmental impact assessments. In June 2019, the CNSC and the Saskatchewan Ministry of Environment accepted the Project Description submitted by Denison for the ISR uranium mine and processing plant proposed for Phoenix at the Wheeler River Project. This acceptance initiated the EA process of assessments for construction, operation and closure of the Phoenix deposit at Wheeler River for Phoenix in accordance with the requirements of both the Canadian Environmental Assessment Act, 2012 and the Saskatchewan Environmental Assessment Act. It is estimated the assessments will require approximately 36 to 48 months to complete following these submissions. In late December 2019, Denison received a Record of Decision from the CNSC, on the scope of the factors to be taken into account for the Wheeler River EA, which indicates that the EA will follow the CNSC's generic guidelines.
See 'Government Regulation - Environmental Assessments' for more information.
Denison recognizes the importance of early engagement and has been developing relationships with key interested parties since 2016. Amongst Denison's guiding principles is the outmost respect for Indigenous communities, Indigenous Rights, and traditional knowledge. Denison wishes to share the land and to work in partnership to return meaningful benefits from the Wheeler River project to potentially impacted Rights holders, communities, and/or groups. Denison understands the importance of protecting the area in which it is working, including the land, the water, the animals, the air and the history. Denison welcomes input from all interested parties through the regulatory engagement and consultation process and interested parties are invited to contact Denison directly to express any comments (positive or negative) or recommendations regarding its activities so the input can be incorporated into project plans, designs, and decisions.
To support its engagement and consultation activities, Denison has developed practices to (1) ensure that employment opportunities are established for residents from the communities of interest; (2) procure goods and services from suppliers from the communities of interest and/or Indigenous-owned suppliers, to support continued exploration and evaluation activities; (3) support important community-led activities related to wellness and/or the preservation of traditional knowledge;
2020 Annual Information Form 61
and (4) solicit input through engagement and consultation activities into aspects of project designs (for example, selection of mining methods, access road routing, and selection of preferred treated water discharge locations).
Capital and Operating Costs
Capital and operating cost estimates were developed to support the PFS of the Gryphon and Phoenix deposits. The estimates address the initial capital, sustaining capital and operating costs required to engineer, procure, construct, commission, start-up and operate the mines, ISR precipitation plant and related infrastructure at the Wheeler River site and upgrades at the McClean Lake mill based on the preliminary project plans projected in the PFS.
Estimates were completed to 'Association for the Advancement of Cost Engineering' class four level with an accuracy of -15% to -30% on the low side and +20% to +50% on the high side.
The Wheeler River project total capital cost is estimated at approximately $1.13 billion, comprised of $322.5 million of initial pre-production capital for the Phoenix operation and $623.1 million of initial pre-production capital for the Gryphon operation as outlined in the following table.
Capital Cost Summary
Wheeler River Capital Cost (1,000's)
Area
Initial
Sustaining
Total
Phoenix
$ 322,539
$ 103,411
$ 425,950
Gryphon
$ 623,120
$ 82,743
$ 705,863
Sub Total
$ 945,659
$ 186,154
$ 1,131,813
The capital costs for the ISR mining of the Phoenix deposit are categorized as follows:
Phoenix Capital Cost Summary
Phoenix Capital Cost Details (1,000's)
Direct Capital Costs
Initial
Sustaining
Total
Wellfield
$ 63,674
$ 35,402
$ 99,076
ISR Precipitation Plant
$ 50,935
$ 4,606
$ 55,541
Water Treatment Plant
$ 1,268
$ 18,676
$ 19,944
Surface Facilities
$ 22,325
$ 49
$ 22,374
Utilities
$ 6,538
$ 803
$ 7,341
Electrical
$ 18,834
$ -
$ 18,834
Civil & Earthworks
$ 44,309
$ 1,331
$ 45,640
Offsite Infrastructure
$ 7,950
$ -
$ 7,950
Decommissioning
$ -
$ 27,454
$ 27,454
Total Direct Costs
$ 215,834
$ 88,321
$ 304,155
Indirect Costs
$ 28,288
$ 5,669
$ 33,957
Other (Owner's) Costs
$ 14,227
$ -
$ 14,227
Contingency Costs
$ 64,190
$ 9,421
$ 73,611
Total Costs
$ 322,539
$ 103,411
$ 425,950

2020 Annual Information Form 62
The capital costs for the underground mining of the Gryphon deposit are shown in the following table.

Gryphon Capital Cost Summary
Gryphon Capital Cost Details (1,000's)
Direct Capital Costs
Initial
Sustaining
Total
Shafts
$ 131,522
$ -
$ 131,522
Surface Facilities
$ 46,932
$ 6,074
$ 53,006
Underground
$ 49,518
$ 68,842
$ 118,360
Utilities
$ 3,946
$ 263
$ 4,209
Electrical
$ 3,613
$ -
$ 3,613
Civil & Earthworks
$ 11,791
$ 483
$ 12,274
McClean Mill Upgrades
$ 49,920
$ -
$ 49,920
Offsite Infrastructure
$ 32,392
$ -
$ 32,392
Decommissioning
$ -
$ 1,575
$ 1,575
Total Direct Costs
$ 329,634
$ 77,237
$ 406,871
Indirect Costs
$ 142,015
$ 5,112
$ 147,127
Other (Owner's) Costs
$ 28,143
$ -
$ 28,143
Contingency Costs
$ 123,328
$ 394
$ 123,722
Total Costs
$ 623,120
$ 82,743
$ 705,863
Operating costs are estimated for the 14-year mine production period from July 1, 2024 through to March 31, 2037. Phoenix mine production is scheduled from July 1, 2024 to June 30, 2034 and Gryphon mine production is scheduled from September 1, 2030 to March 31, 2037. The table below presents a summary of the Wheeler River prefeasibility level operating cost estimates.
Wheeler River Operating Cost Summary
Cost Area
Phoenix
Gryphon
Total Cost
$000's
$/lb U₃O₈
$000's
$/lb U₃O₈
$000's
Mining
$ 44,020
$ 0.75
$ 266,202
$ 5.46
$ 310,222
Milling
$ 115,577
$ 1.97
$ 412,621
$ 8.45
$ 528,198
Transport to Convertor
$ 12,341
$ 0.21
$ 10,252
$ 0.21
$ 22,593
Site Support / Administration
$ 82,264
$ 1.40
$ 53,346
$ 1.09
$ 135,610
Total
$ 254,202
$ 4.33
$ 742,421
$ 15.21
$ 996,623
Total US$
$ 3.33
$ 11.70
U308Sales - lbs in 000's
58,767
48,817
The project economics have been analyzed on a pre-tax basis (100% basis) and a Denison specific post-tax basis (90% basis, based on Denison's current ownership interest and reflected as a pro-forma analysist in the PFS). Inputs into both pre-tax and post-tax models include:
Discount rate of 8%.
Estimated metallurgical process uranium recoveries of 98.5% and 98.2% for Phoenix and Gryphon mill feeds, respectively.
Project capital and operating cost assumptions, as further described in the PFS.
Project schedule assumptions from 2019 to 2043, as further described in the PFS.
Mine production assumptions, as further described in the PFS.
2020 Annual Information Form 63
Uranium pricing scenarios, as follows:
o
Base case: (a) Phoenix - based on UxC's Q3-2018 Uranium Market Report Composite Midpoint spot price projection, in constant (uninflated) 2018 dollars, ranging from US$29.48 to US$45.14 per pound U3O8 during the Phoenix mine production period; and (b) Gryphon - based on a fixed price of US$50.00 per pound U3O8 during the Gryphon mine production period. US$ amounts translated to CAD using an exchange rate of 1.30 CAD/US$.
o
High case: a fixed price of US$65.00 per pound U3O8 for both the Phoenix and Gryphon production.
Saskatchewan revenue-based royalties and surcharges applicable to uranium revenue, as follows: a) a basic royalty of 5.0% of uranium revenue; b) a resource credit of 0.75% of uranium revenue (which partially offsets the basic royalty); and c) a resource surcharge of 3.0% of the value of uranium revenue. For the purposes of these calculations, revenue has been computed as gross uranium revenue less transportation costs to the convertor.
No inflation or escalation of revenue or costs have been incorporated.
The Wheeler River project pre-tax indicative economic results are illustrated below.
Pre-tax Economic Results (100% basis)
Pre-Tax Results
NPV 8%
IRR
Payback
Base Case
$1,308 million
38.7%
~ 24 Months
High Case
$2,587 million
67.4%
~ 11 Months
(1)
NPV and IRR are calculated to the start of pre-production activities for the Phoenix operation in 2021.
(2)
Payback period is stated as number of months to pay back from start of uranium production.
A post-tax Denison-specific economic assessment includes similar inputs as the pre-tax assessment with the following modifications:
Denison's share of project development costs is included in the project's capital costs along with their impact on Denison's estimated tax pools.
The impact of the Saskatchewan Profit Royalty as estimated for Denison is included.
Denison's expected provincial and federal income taxes payable are included.
Denison's recovery of toll milling fees paid to the MLJV (22.5% owned by Denison) by the WRJV for the toll milling of Gryphon ores are incorporated.
The Wheeler River project post-tax Denison-specific (90% basis) indicative economic results are further detailed in the PFS, and summarized as follows:
Post-tax Economic Results to Denison (90% basis)
Post-Tax Results
NPV 8%
IRR
Payback
Base Case
$755.9 million
32.7%
~26 months
High Case
$1,483.8 million
55.7%
~12 months
(1)NPV and IRR are calculated to the start of pre-production activities for the Phoenix operation in 2021;
(2)
Payback period is stated as number of months to pay back from start of uranium production

2020 Annual Information Form 64
Waterbury Lake
The Waterbury Lake Uranium Limited Partnership ('WLULP') is held by Denison (66.89%) and Korea Waterbury Uranium Limited Partnership ('KWULP') (33.09%) as limited partners and Waterbury Lake Uranium Corporation ('WLUC') (0.02%), as general partner, with Denison and KWULP holding limited partnership interests of 66.90% and 33.10%, respectively. Denison holds a 60% interest in WLUC, and in aggregate, holds a 66.90% interest in the WLULP through its limited partner and general partner ownership interests. Denison is operator of the project.
This project description is based on the project's technical report entitled 'Preliminary Economic Assessment for the Tthe Heldeth Túé (J Zone) Deposit, Waterbury Lake Property, Northern Saskatchewan, Canada' effective October 30, 2020 (the 'Waterbury PEA'). The main author was Mr. Gordon Graham, P.Eng of EngComp, who is an independent Qualified Person in accordance with NI 43-101. A copy of the Waterbury PEA is available on the Company's website.
The conclusions, projections and estimates included in this description are subject to the qualifications, assumptions and exclusions set out in the Waterbury PEA. We recommend you read the technical report in its entirety to fully understand the project.
Property Description, Location and Access
The Waterbury Lake property is located within the eastern part of the Athabasca Basin in Northern Saskatchewan, which is within Treaty 10, in Nuhenéné / Athabasca Denesųłiné territory, and in Métis Northern Region 1 within the Métis Homeland.
The Waterbury Lake project, as of December 31, 2020, is comprised of thirteen (13) mineral dispositions, covering 40,256 ha. The THT and Huskie Zone deposits are located within the property near its eastern edge. All dispositions have sufficient approved assessment credits to maintain the ground in good standing until at least 2033.
The project dispositions are approximately 750 km by air north of Saskatoon and about 420 km by road north of the town of La Ronge. Points North Landing, a privately-owned service centre with accommodations and an airfield, is located near the eastern edge of the property. Several uranium deposits are located nearby including the Roughrider, McClean Lake, Midwest Main, and Midwest A deposits.
Any uranium produced from the Waterbury Lake property is subject to uranium mining royalties in Saskatchewan in accordance with Part III of The Crown Mineral Royalty Regulations. See 'Government Regulation - Canadian Royalties'. Denison has a 2% net smelter return royalty on the portion of the project that it does not own. There are no other contractual royalties on the property.
There are no known environmental liabilities associated with the Waterbury Lake property, and there are no other significant factors and risks that may affect access, title, or the right or ability to perform work on the property.
2020 Annual Information Form 65
Location of the THT (formerly J Zone) and Huskie Deposits on the Waterbury Lake project
2020 Annual Information Form 66
History
Uranium exploration activities have been conducted over various portions of the Waterbury Lake mineral claims over the past 50 years. The current Waterbury Lake mineral claims were originally staked by Strathmore Minerals Corp. in 2004. Strathmore subsequently spun out its Canadian assets to Fission in 2007. On January 30, 2008, KWULP and Fission entered into an earn-in agreement for the Waterbury Lake property, pursuant to which Fission granted KWULP the exclusive rights to earn up to a 50% interest in the Waterbury Lake property by funding $14,000,000 of expenditures on or before January 30, 2011. Additionally, Fission retained an overriding royalty interest in the property of 2% of net smelter returns. On April 29, 2010, KWULP had fully funded its $14 million of expenditures and consequently earned a 50% interest in the property. Fission and KWULP subsequently formed the WLULP in December 2010 with each party owning an equal interest. In April 2011, Fission exercised a back-in option right and increased its interest in the WLULP to 60%.
Effective April 26, 2013, Denison acquired Fission and all of Fission's rights and entitlements to the Waterbury Lake property, including the 2% net smelter returns royalty. Denison became manager of WLULP and operator of Waterbury Lake. KWULP has not funded spending programs of the WLULP since January 2014 and, as a result, Denison has increased its interest in the WLULP (now 66.90%) while KWULP has diluted.
The Waterbury Lake uranium project currently contains two deposits: the THT deposit and the Huskie deposit.
The THT uranium deposit was discovered during the winter 2010 drill program. The second drill hole of the campaign, WAT10-063A, was an angled hole drilled from a peninsula extending into McMahon Lake. It intersected 10.5 metres of uranium mineralization grading 1.91% U3O8, including 1.0 metre grading 13.87% U3O8 as well as an additional four meters grading at 0.16% U3O8. Subsequent drilling led Fission to focus in on a significant mineralized trend immediately adjacent to the southeastern boundary of disposition S-107370. The maiden mineral resource estimate for the THT was issued by Fission in 2011.
Denison first discovered mineralization at the Huskie zone in summer 2017 with the intersection 9.10% U3O8 over 3.7 metres, including 16.78% U3O8 over 2 metres, from 306.5 to 310.2 metres depth in drill hole WAT17-466A. Further drilling in 2017 and 2018 resulted in a maiden mineral resource estimate in December 2018.
Geological Setting, Mineralization and Deposit Types
The Waterbury Lake property is located near the southeastern margin of the Athabasca Basin in the southwest part of the Churchill Structural Province of the Canadian Shield. The Athabasca Basin is a broad, closed, and elliptically shaped, cratonic basin with an area of 425 km east-west by 225 km north-south. The bedrock geology of the area consists of Archean and Paleoproterozoic gneisses unconformably overlain by flat-lying, unmetamorphosed sandstones and conglomerates of the mid-Proterozoic Athabasca Group.
The Waterbury Lake property is located near the transition zone between two prominent litho-structural domains within the Precambrian basement, the Mudjatik Domain to the west and the Wollaston Domain to the east. The Mudjatik Domain is characterized by elliptical domes of Archean granitoid orthogenesis separated by keels of metavolcanic and metasedimentary rocks, whereas the Wollaston Domain is characterized by tight to isoclinal, northeasterly trending, doubly plunging folds developed in Paleoproterozoic metasedimentary rocks of the Wollaston Supergroup, which overlie Archean granitoid orthogenesis identical to those of the Mudjatik Domain.
2020 Annual Information Form 67
The area is cut by a major northeast-striking fault system of Hudsonian Age. The faults occur predominantly in the basement rocks but often extend up into the Athabasca Group due to several periods of post-depositional movement.
The basement beneath the Waterbury Lake project is comprised of approximately northeast-trending corridors of metasediments wrapping around orthogneissic domes and locally in the Discovery Bay trend an east-west trending corridor of metasediments bounded to the north and south by thick zones of orthogneiss that, based on interpretation of aeromagnetic images, may represent two large dome structures. As discussed in the Waterbury Report, the metasediments and the orthogneiss domes are interpreted to be Paleoproterozoic and Archean in age, respectively.
The THT deposit is hosted within an east-west trending faulted package of variably graphitic and pyritic metasediments bounded by orthogneiss to both the north and south. The pelitic metasedimentary assemblage, which ranges in thickness from 90 to 120 metres and is moderately steep dipping to the north includes, from north to south, a roughly 50 metre thick pelitic gneiss underlain by 20 metre thick graphitic pelitic gneiss, underlain by a 10 to 15 metre thick quartz-feldspar wedge underlain by 20 metre thick graphitic pelitic gneiss, underlain by a 15 to 25 metre thick pelitic gneiss, then back into a footwall orthogneiss. There are discontinuous offsets at the unconformity that range from a few metres to as much as ten metres.
It is currently defined by 268 drill holes intersecting uranium mineralization over a combined east-west strike length of up to 700 metres and a maximum north-south lateral width of 70 metres. The deposit trends roughly east-west (80°) in line with the metasedimentary corridor and cataclastic graphitic fault zone. A 45 metre east-west intermittently mineralized zone occurs in the target area formerly known as Highland roughly separating the THT deposit into two segments referred to as the eastern and western lenses which are defined over east-west strike lengths of 260 and 318 metres, respectively. A thin zone of unconformity uranium mineralization occurs to the north of intermittently mineralized zone which is interpreted to represent a mineralized block that has been displaced northwards by faulting and is referred to as the mid lens.
Mineralization thickness varies widely throughout the THT deposit and can range from tens of centimetres to over 19.5 metres in vertical thickness. In cross section, THT mineralization is roughly trough shaped with a relatively thick central zone that corresponds with the interpreted location of the cataclasite and rapidly tapers out to the north and south. Locally, a particularly high-grade (upwards of 40% U3O8) but often thin lens of mineralization is present along the southern boundary of the metasedimentary corridor, as seen in holes WAT10-066, WAT10-071, WAT10-091, and WAT10-103. Ten-metre step out drill holes to the south from these high-grade holes have failed to intersect any mineralization, demonstrating the extremely discreet nature of mineralization.
Uranium mineralization is generally found within several metres of the unconformity at depth ranges of 195 to 230m below surface at the THT. Mineralization occurs in three distinct settings: (1) entirely hosted within the Athabasca sediments, (2) entirely within the metasedimentary gneisses or (3) straddling the boundary between them. A semi-continuous, thin zone of uranium mineralization has been intersected in occasional southern THT drill holes well below the main mineralized zone, separated by several meters of barren metasedimentary gneiss. This mineralized zone is informally termed the South-Side Lens and can host grades up to 3.70% U3O8, as seen in drill hole WAT11-142.
2020 Annual Information Form 68
The Huskie deposit is entirely hosted within competent basement rocks below the sub-Athabasca unconformity primarily within a faulted, graphite-bearing pelitic gneiss ('graphitic gneiss') which forms part of an east-west striking, northerly dipping package of metasedimentary rocks flanked to the north and south by granitic gneisses. The Athabasca Group sandstones that unconformably overlie the basement rocks are approximately 200 metres thick.
The deposit comprises three stacked, parallel lenses (Huskie 1, Huskie 2 and Huskie 3), which are conformable to the dominant foliation and fault planes within the east-west striking graphitic gneiss unit. The drilling to date suggests the grade, thickness, and number of lenses present is controlled by the presence of northeast striking faults which cross-cut the graphitic gneiss unit. The northeast striking faults identified at the Huskie deposit are interpreted to be part of the regional Midwest structure. The deposit occurs over a strike length of approximately 210 metres, dip length of approximately 215 metres and has an overall true thickness of approximately 30 metres (individual lenses vary in true thickness of between 1 metre and 7 metres). The deposit occurs at vertical depths ranging between 240 and 445 metres below surface and 40 to 245 metres below the sub-Athabasca unconformity. The high-grade mineralization within the lenses is comprised of massive to semi-massive uraninite (pitchblende) and subordinate bright yellow secondary uranium minerals occurring along fault or fracture planes, or as replacement along foliation planes. Disseminations of lower grade mineralization occur within highly altered rocks proximal to fault planes. The mineralization is intimately associated with hematite, which both occur central to a broad and pervasive alteration envelope of white clays, chlorite and silicification.
Exploration
With the exception of drilling, and related work, exploration on the Waterbury Lake property has mostly been in the form of geophysical surveys. Airborne magnetic surveys have been flown property wide and have been used to identify significant basement structures and to help map basement rock types. Airborne and ground based EM surveys have also been carried out across the property in order to define conductive, likely graphitic basement structures that may be associated with uranium mineralization. Additionally, ground based induced polarization (DC-IP) and gravity surveys have aimed to identify zones of low resistivity and negative gravity anomalies resulting from quartz dissolution and clay alteration.
A DCIP resistivity survey comprising 28.8 kilometres (16 lines) was completed during October 2018. The survey was designed to map the possible extension of the Midwest structure on to the Waterbury Lake property and to define possible drill targets for future testing.
No significant geological mapping has been conducted on the Waterbury Lake property to date as the property is predominantly covered by a thick layer of Quaternary sediments resulting in poor outcrop exposure; however, several reconnaissance scale surface geochemical surveys have been undertaken on the Waterbury Lake property.
Drilling
The THT deposit is extremely well defined by 268 drill holes intersecting uranium mineralization over a combined east-west strike length of up to 700 metres and a maximum north-south lateral width of 70 metres. The mineralization thickness varies from tens of centimetres to 19.5 metres and the mineralization is found within several metres of the unconformity at depths of 195 to 230 metres. The THT deposit has been drilled, on average, at 10 metre by 25 metre spacings across the deposit and in some cases a more dense drill spacing has been applied. The genesis and structural complexity of the deposit are well understood. There are no outlying elements of the deposit requiring further drill testing.
2020 Annual Information Form 69
Most recently, the 2019 drilling program commenced in January and was concluded in March. Activities focused on drill testing priority target areas associated with the regional Midwest Structure, which is interpreted to be located along the eastern portion of the Waterbury Lake property. Target areas tested included the GB Zone (3,385 metres; 9 drill holes), Oban South (1,127 metres; 3 drill holes), GB Northeast (323 metres; 1 drill hole) and the Midwest Extension (900 metres; 2 drill holes), with highlight results described below:
GB Zone - Nine drill holes were completed to follow-up on basement-hosted mineralization discovered during the summer 2018 drilling program. The winter 2019 drill holes were oriented steeply to the northeast on an approximate 100 x 100 metre spacing to test the faulted graphitic basement sequence which dips steeply to the southwest. Basement-hosted mineralization was intersected in drill hole WAT19-480, highlighted by 0.15% U3O8 over 6.0 metres, including 0.26% U3O8 over 3.0 metres. Additional basement-hosted mineralized intercepts were obtained approximately 100 metres to the southeast of WAT19-480 in drill hole WAT19-486 highlighted by 0.25% U3O8 over 2.0 metres and 0.22% U3O8 over 1.5 metres.
Oban South - The target area at Oban South comprises the interpreted intersection of the east-west trending Oban South graphitic conductor and the north-northeast trending regional Midwest structure. Three drill holes were completed as an initial test of the geological concept. The drilling successfully identified a faulted graphitic unit within the basement, which was hydrothermally altered, and a broad zone of desilicification within the lower sandstone, which included 10 ppm uranium and over 100 ppm boron within the basal 12.5 metres of sandstone immediately overlying the unconformity.
GB Northeast - A single reconnaissance drill hole was completed to test a coincident airborne electromagnetic conductor and magnetic low approximately 2.5 kilometres to the northeast of the GB Zone. The drill hole intersected moderately to locally strong sandstone alteration and an altered and faulted graphitic pelite unit immediately below the unconformity. The drill hole was highlighted by a discrete spike in basement radioactivity of 1,520 counts per second ('cps'), measured with an RS-125 gamma hand-held spectrometer, within the faulted graphitic pelite unit accompanied by elevated uranium (up to 200 ppm over 0.5 metres) and pathfinder geochemistry.
Sampling, Analysis and Data Verification
For THT, drill core was split once geological logging, sample mark up and photographing were completed. All drill core samples were marked out and split at the splitting shack by employees, put into 5-gallon sample pails and sealed and transported to Points North, Saskatchewan only prior to shipment. The samples were then transported directly to the Saskatchewan Research Council Geoanalytical laboratories (the 'SRC Lab') in Saskatoon, Saskatchewan by Marsh Expediting. All geochemical, assay and bulk density samples were split using a manual core splitter over the intervals noted in the sample booklet. Half of the core was placed in a plastic sample bag with the sample tag and taped closed with fibre tape. The other half of the core was returned to the core box in its original orientation for future reference. All drill core samples were evenly and symmetrically split in half in order to try and obtain the most representative sample possible. Mineralized core samples which occur in drill runs with less than 80% core recovery are flagged for review prior to the resource estimation process.
Recovery through the mineralized zone is generally good and assay samples are assumed to adequately represent in situ uranium content. The SRC Lab offers an ISO/IEC 17025:2005 accredited method for the determination of U3O8 weight % in geological samples. Rock samples are crushed to 60 % at -2 mm and a 100-200g sub sample is split out using a riffler. The sub sample is further crushed to 90% at -106 microns using a standard puck and ring grinding mill.
2020 Annual Information Form 70
An aliquot of pulp is digested in a concentrated mixture of HNO3:HCl in a hot water bath for an hour before being diluted by deionized water. Samples are then analyzed by a Perkin Elmer ICP-OES instrument (models DV4300 or DV5300).
Drill core samples collected for bulk density measurements were first weighed as they are received and then submerged in deionized water and re-weighed. The samples are then dried until a constant weight is obtained. The sample is then coated with an impermeable layer of wax and weighed again while submersed in deionized water. Weights are entered into a database and the bulk density of the core waxed and un-waxed (immersion method) is calculated and recorded. Not all density samples had both density measurements recorded. Water temperature at the time of weighing is also recorded and used in the bulk density calculation. The detection limit for bulk density measurements by this method is 0.01 g/cm3.
Prior to the summer 2010 drill program, the only QAQC procedures implemented on drill core samples from the project were those performed internally by the SRC Lab. The in-house SRC Lab QAQC procedures involve inserting one to two quality control samples of known value with each new batch of 40 geochemical samples. All of the reference materials used by the SRC Lab on the Waterbury project are certified and provided by CANMET Mining and Mineral Services. The SRC Lab internal QAQC program continued through the 2013 drill program. Starting in the summer of 2010 and continuing into the 2013 drill program (discontinued after DDH WAT13-350), an internal QAQC program was designed by Fission to independently provide confidence in the core sample geochemical results provided by the SRC Lab. The internal QAQC sampling program determines analytical precision through the insertion of sample duplicates, accuracy through the insertion of materials of 'known' composition (reference material) and checks for contamination by insertion of blanks. Blanks, reference standards and duplicates were inserted into the sample sequence including field duplicates (quarter core every 1 in 20 samples), prep and pulp duplicates (inserted by the SRC Lab every 1 in 20 samples) and blank samples (1 sample for every mineralized drill hole). Beginning in 2012 certified, internal reference standards were used in all holes drilled at Waterbury Lake, replacing the re-analysed low, medium and high grade reference samples. The results of the QAQC programs indicate there are no issues with the drill core assay data. The data verification programs undertaken on the data collected from the Project support the geological interpretations, and the analytical and database quality, and therefore the data can support mineral resource estimation.
With respect to its work on the Huskie deposit, Denison has developed and documented several QA/QC procedures and protocols for all exploration projects which include the following components: (a) Determination of precision - achieved by regular insertion of duplicates for each stage of the process where a sample is taken or split; (b) Determination of accuracy - achieved by regular insertion of standards or materials of known composition; and (c) Checks for contamination - achieved by insertion of blanks.
The SRC laboratory has a quality assurance program dedicated to active evaluation and continual improvement in the internal quality management system. The laboratory is accredited by the Standards Council of Canada as an ISO/IEC 17025 Laboratory for Mineral Analysis Testing and is also accredited ISO/IEC 17025:2005 for the analysis of U3O8. The laboratory is licensed by the CNSC for possession, transfer, import, export, use, and storage of designated nuclear substances by CNSC Licence Number 01784-1-09.3. As such, the laboratory is closely monitored and inspected by the CNSC for compliance.
2020 Annual Information Form 71
All analyses are conducted by SRC, which has specialized in the field of uranium research and analysis for over 30 years. SRC is an independent laboratory, and no associate, employee, officer, or director of Denison is, or ever has been, involved in any aspect of sample preparation or analysis on samples from the THT or Huskie deposits.
The SRC uses a laboratory management system ('LMS') for quality assurance. The LMS operates in accordance with ISO/IEC 17025:2005 (CAN-P-4E) 'General Requirements for the Competence of Mineral Testing and Calibration Laboratories' and is also compliant to CAN-P-1579 'Guidelines for Mineral Analysis Testing Laboratories'. The laboratory continues to participate in proficiency testing programs organized by CANMET (CCRMP/PTP-MAL).
Mineral Processing and Metallurgical Testing
A preliminary assessment of the mineralogical and leaching characteristics of a representative selection of drill core samples from the THT deposit was undertaken between July and December 2011 by Mineral Services Canada.
The study was based on a suite of 48 samples of mineralized material collected from thirty-two drill holes (2010 and 2011 programs). These were chosen to provide good spatial representation of the THT mineralization as well as representing a wide range of uranium content. The samples were derived from the half split core remaining after the initial geochemical / assay sampling process. All samples were submitted to the SRC Lab for comprehensive mineralogical analysis and preparation of thin sections for petrographic analysis. The results of mineralogical work were used, in conjunction with spatial considerations, to define suitable composite samples for preliminary leaching test work undertaken by the SRC Mining and Minerals Division.
Mineralogical analysis, utilizing XRD, quantitative mineralogical analysis (Q-Min), petrography and SEM-EDS analysis, determined that the most abundant uranium-bearing minerals in the THT deposit are uraninite and/or pitchblende, and coffinite. The gangue mineralogy is essentially comprised of various amounts of quartz, phyllosilicates (illite-sericite, chlorite, biotite, kaolinite) and (Fe, Ti)-oxides (hematite, goethite and anatase). Feldspars also occur in most samples and carbonates as well as a variety of sulphides are locally present. Ni-arsenides are recognized throughout the samples as well. The results of the mineralogical analyses identified five groupings of samples with ore mineralogies typically dominated by either uranium oxide or uranium silicate phases.
Preliminary acid leaching tests were undertaken by SRC Mining and Minerals Division on composite samples prepared from the sample set. Only the leaching time and rate of acid addition were considered in the tests while the other parameters (e.g. solid percentage in the slurry, temperature, pressure and agitation conditions) remained fixed. A total of five composite samples were defined based on spatial location. Acid leaching (H2SO4) was performed on each of the composite samples for 12 hours under atmospheric pressure and at a temperature of 55-65°C. Agitation was used to create adequate turbulence. Sodium Chlorate was used as the oxidant. The tests were undertaken on the assay lab rejects from XRD analyses that were ground to 90% passing 106 microns. The percentage of solids in the slurry was set at 50%. The only variables were the acid addition and leaching residence time. Two different H2SO4 dosages were used to create an initial leaching environment with 25 mSc/cm and 55 mSc/cm, respectively. Each composite sample was split into two subsamples labelled A and B. The A sample was used to test high acid addition with high initial conductivity and the B sample was used to test low acid addition with low initial conductivity. The preliminary acid leaching tests showed that maximum extraction rates of 97.6 % to 98.5 % U3O8 can be obtained (depending on the acid addition) within 4 to 8 hours of leaching time, and that the leaching efficiency was variably affected by acid addition and leaching time.
2020 Annual Information Form 72
Additional test work was undertaken in 2020. Leaching tests to determine key ISR data such as optimum reagent addition rates at lower leaching temperatures (10 to 20 degrees Celsius) and expected Uranium Bearing Solution (UBS) head grade were conducted and the outcomes were used to drive reagent quantities.
A new composite THT east pod metallurgical testing sample was generated from 33 individual assay reject samples stored at the Saskatchewan Research Council (SRC) facilities in Saskatoon. The individual samples, distributed through the deposit, allowed preparation of a deposit representative sample. The composite sample assayed 2.72% U3O8. Acid leaching tests at 10 deg C, using hydrogen peroxide (H2O2) oxidant, with varying sulphuric acid (H2SO4) concentrations (100, 80, 60 and 40 g/L) showed that extraction rates of 90% U3O8 can be obtained within 2 hours of leaching time, and that the leaching efficiency was affected by acid addition.
Mineral Resource Estimates
Tthe Heldeth Túé Deposit
The Mineral Resources for the Waterbury Lake Project comprise the THT and the Huskie deposits. The Mineral Resource Statement presented herein represents the Mineral Resource evaluation prepared for the Waterbury Lake Project in accordance with NI 43-101.
The THT deposit is estimated to contain an indicated mineral resource, using a base case cut-off grade of 0.10% U3O8,totaling 12,810,000 lbs based on 291,000 tonnes at an average grade of 2.00% U3O8 (100% basis).
For the 2013 mineral resource estimate, a 3D wireframe model was constructed based generally on a cut-off grade of 0.03 to 0.05 % U3O8 which involved visually interpreting mineralized zones from cross sections using histograms of U3O8. 3D rings of mineralized intersections were created on each cross section and these were tied together to create a continuous wireframe solid model in Gemcom GEMS 6.5 software. The modeling exercise provided broad controls on the size and shape of the mineralized volume. Inverse distance squared interpolation restricted to a mineralized domain was used to estimate tonnes, density and U3O8 grades as well as gold, arsenic, cobalt, copper, molybdenum and nickel grades into the block model.
A range of resources at various U3O8 cut-off grades (COG) has been estimated for THT. The current indicated resource is stated using a grade cut-off of 0.10% U3O8.
Two passes were used to interpolate all of the blocks in the wireframe, but 99% of the blocks were filled by the first pass. The size of the search ellipse, in the X, Y, and Z direction, used to interpolate grade into the resource blocks is based on 3D semi-variography analysis (completed in GEMS) of mineralized points within the resource model. For the first pass, the search ellipse was set at 25 x 15 x 15 metres in the X, Y, Z direction respectively. For the second pass, the search ellipse was set at 50 x 30 x 30 metres in the X, Y, Z direction respectively. The Principal azimuth is oriented at 75º, the Principal dip is oriented at 0° and the Intermediate azimuth is oriented at 0°.
Huskie Deposit
The Huskie Deposit is currently estimated to contain an inferred mineral resource, using a base case cut-of-grade of 0.10% U3O8, totaling 5,687,000 lbs U3O8 based on 268,000 tonnes at an average grade of 0.96% U3O8 (100% basis). The Huskie Deposit resource estimate was prepared by Denison and independently audited and verified to confirm that the mineral resources were estimated in accordance with the widely accepted CIM Estimation of Mineral Resource and Mineral Reserve Best Practices Guidelines.
2020 Annual Information Form 73
The mineral resources may be affected by further infill and exploration drilling that may result in increases or decreases in subsequent mineral resource estimates. The mineral resources may also be affected by subsequent assessments of mining, environmental, processing, permitting, taxation, socio-economic, and other factors.
For the 2018 mineral resource estimate, GEOVIA GEMS™ software (version 6.8) was used to build three-dimensional mineralized wireframes for the Huskie 1, Huskie 2 and Huskie 3 lenses based on lithological and structural data from core logs and geochemical assay (or radiometric probe) data collected from 28 holes totaling 12,273 metres completed by Denison. A lower cut-off of 0.05% U3O8 and a minimum thickness of 1 metre was selected for the mineralized wireframe model.
The mineral resource model was constrained by the mineralization wireframes. The assay database (% U3O8 or % eU3O8) used for resource modelling consists of 201 assays from the 10 mineralized boreholes, contained within the three mineralized lenses. The 0.5 metre interval assays were composited to 1.0 metre lengths. Capping was considered, with only assay data from Huskie 2 being capped for % U3O8. Density values were assigned to the database based on a regression between U3O8 and density data pairs using the relationship determined for Denison's Gryphon deposit, which is also hosted within comparable basement rocks. The validity of the Gryphon grade:density regression for the Huskie deposit was confirmed by plotting 12 bulk dry density samples collected by the technical report authors from the Huskie deposit. Variograms were modelled to determine appropriate search radii for grade estimation.
An accumulation-like approach was used, wherein 'U3O8*density' and 'density' were estimated into a three-dimensional block model, constrained by wireframes in two passes using ID2. A %U3O8 grade was then calculated into each block by dividing the estimated U3O8*density by the estimated density. A block size of 10 by 5 by 5 metres was selected. Search radii were based primarily on visual observations and variogram analyses. The estimation of U3O8*density and density were based on two estimation passes. The block model was validated using nearest neighbour estimation and by visual inspection of the block grades relative to composites and swath plots comparing the ID2 and nearest neighbour model. All blocks were classified as Inferred.
No pre-feasibility or feasibility studies have been completed to allow conversion of the mineral resources to mineral reserves. Consequently, no mineral reserves exist for the Waterbury Lake property at the present time.
Mining Operations
The THT deposit is proposed to be mined using the ISR method. The indicated Mineral Resource estimated for the Waterbury PEA mine plan includes the THT East pod only and is estimated at 9.7 million pounds of U3O8 with an average grade of 2.49% over 178,000 tonnes.
A small percentage of the THT East pod resource has not been included in the mine plan due to sterilization by freeze methods. Due to the geometry of the deposit and the nature of freeze technology applied to the deposit to allow for sufficient containment of mining fluid, the extreme western and easternmost portions of the deposit have not been considered in the Potentially Recoverable Resource. The collective resource attributed to sterilization is 206,180 lbs, representing 1.7% of the THT East pod.
2020 Annual Information Form 74
Additionally, an 85% mining recovery factor was applied to the projected resource available for mining to account for sweep efficiencies and metallurgical recovery envisioned and deemed appropriate for the nature of the THT deposit. The mining recovery factor is a product of the metallurgical recovery and sweep efficiencies based on knowledge gained during the project development of the Phoenix deposit utilizing the ISR method. The sweep efficiency is defined as the percentage of mineralized rock in contact with the lixiviant as it circulates between the injection wells and surrounding recovery wells. The metallurgical recovery is determined by the amount and rate at which the uranium dissolves from the rock when in contact with the lixiviant.
Tthe Heldeth Túé East Pod Projected Mine Production (0% Grade cut-off (1))
Deposit Category
Classification
Percentage
Tonnes
Pounds U3O8 (100% Basis)
Grade
(% U3O8)
Tthe Heldeth Túé East Pod: In-Situ Resource
Indicated
100%
211,997
11,633,762
2.49%
Sterilized Resource
Indicated
100%
(2,980)
(206,180)
-
Tthe Heldeth Túé East Pod: Mineable Resource
Indicated
100%
209,017
11,427,582
-
Mining Recovery Factor
85%
Projected Mine Production
177,664
9,713,445
2.49%
(1)Projected Mine Production presented at a 0% grade cut off to reflect nonselective ISR mining method.
The foregoing is based upon estimated indicated mineral resources. Mineral resources that are not mineral reserves do not have demonstrated economic viability.
A key hydrologic property that affects ISR mining is the permeability (hydraulic conductivity) of the ore zone and, just as importantly, the hydraulic communication (interconnectedness of the permeability/porosity) across the ore zone. The ability to transmit fluids through the ore body via well injection and recovery is fundamental to the efficacy of ISR mining.
Denison has performed permeameter testing of exploratory boring cores that were recovered from the ore zone and overlying and underlying strata at the site. The permeameter testing was conducted utilizing a portable nitrogen gas probe permeameter adapted for testing drill core pieces. Permeameter testing measures the matrix permeability of the core sample. Permeameter testing was performed by applying an epoxy ring at the sample location and sealing the permeameter probe against the ring to ensure a tight seal. Pressure is measured upstream of the probe tip at a sampling interval of two seconds, and the pressure decay of the nitrogen gas injection is measured to determine permeability in the drillcore at the sample location. In general, the gas pressure pulse applied to the drillcore is approximately 30 to 50 psi, and test durations are less than 20 minutes per test. This methodology was applied extensively at the Phoenix project, with testing conducted on core at approximate 10 centimeter intervals, resulting in a total of over 1,200 measurements.
Permeameter test results were reported for 150 core sample measurements in the THT East pod. Of the 150 measurements, 25 were from core collected within the mineralized zone, 43 were from the overlying Athabasca Sandstones, with the remainder from the underlying metasedimentary basement. The samples were further grouped into lithologic units.
The median hydraulic conductivity value for all of the mineralized samples for the THT is 1.1E-10 m/s with a range of 1.0E-13 to1.7E-07 m/s. The matrix permeability test work conducted for the Phoenix deposit at Wheeler River and outlined in Denison's press release dated February 24, 2020 shows hydraulic conductivity values ranging from 1.5 x 10-13 to 5.0 x 10-6 m/s for the Phoenix Deposit:
2020 Annual Information Form 75
the permeameter testing results from cores collected from borings at the Phoenix project correlates reasonably well to the hydraulic conductivity values published from the pumping and injection tests conducted at Phoenix. The data from Phoenix suggest that permeameter data can provide a reasonable initial estimate of hydraulic conductivity.
Given the positive correlation between bulk hydraulic conductivity testing and permeameter testing of core samples in estimating hydraulic conductivity at the Phoenix deposit at Wheeler River, it is reasonable to assume a similar correlation for the THT deposit based on a comparable geologic setting. The recently conducted permeameter testing from the THT deposit should provide a reasonable initial estimate of hydraulic conductivity, although, the degraded state of the core most likely biased the tested samples toward lower permeabilities. Based on the currently available data, the hydraulic conductivity estimated from the THT permeameter testing appears to be notably lower than what was estimated for the Phoenix Project.
Several factors should be considered in the evaluation of permeability and its potential impacts to ISR mining applied to the THT deposit. First, as previously indicated, the samples suitable for conducting the permeameter testing are biased toward the more dense and intact (and likely lower permeability) core material. Second, the inter-well spacing (distance between wells within a well pattern) planned for the project will be less than what is proposed for the Wheeler River project at the Phoenix deposit, which will reduce the residence time for lixiviant to move from injection well to extraction well. Third, application of permeability enhancement methods will be utilized to increase the near well-bore permeability within the mineralized zone.
In conventional ISR operations, containment of the mining solution is typically achieved by natural impermeable bounding layers in the geological strata and/or by creating a natural drawdown (via pumping) of the water table towards the ore zone. At the THT deposit, there is a natural impermeable layer below the deposit, in the form of a competent package of basement rocks, but the deposit is otherwise hydraulically connected to the vast regional groundwater system in the overlying sandstone formation that defines the Athabasca Basin.
In order to maintain containment, the entire deposit will be isolated by use of an artificial and impermeable freeze wall that will surround the deposit. The freeze wall will be established by drilling a series of cased holes from surface and along the perimeter of the deposit, and keyed into the basement rock. The freeze wall will be comprised of 92 holes planned at a 7 metre spacing at the target depth of 200 metres and extend 30 metres below the unconformity elevation. The freeze wall is planned to be drilled entirely from land on the peninsula on McMahon Lake which extends to the eastern portion of THT. Freeze holes will be angled out to surround the mining zone with the minimum drilling angle limited to 45º to reduce technical risk of drilling and installing the freeze holes. Circulation of a low temperature brine solution in the holes will remove heat from the ground, freezing the natural groundwater, and establishing an impermeable frozen wall around the deposit.
The wellfield design included in the Waterbury PEA uses 184 wells at 7 metre spacing arranged in a 5-spot pattern, with four injection wells around one recovery well. The wells will be drilled from surface within the freeze wall and angled out to penetrate the mineralized zone at depth with a roughly 7 metre spacing.
Eight monitoring wells will be installed outside of the freeze wall to detect and remediate any excursion of lixiviant from the mining zone.
2020 Annual Information Form 76
Summary THT ISR Wellfield Wells
Number of Wells
Drill Metres
Recovery Wells
66
20,637
Injection Wells
118
36,896
Monitoring Wells
8
1,750
Total
192
59,283
Proposed THT Wellfield and Freeze wall configuration
2020 Annual Information Form 77
Processing and Recovery Operations
Final mineral processing of the UBS expected to be recovered from the THT deposit is assumed to occur at the nearby McClean Lake mill. The mill is owned by the MLJV of which Orano Canada holds a 77.5% interest, and Denison Mines Inc. (a wholly-owned subsidiary of Denison) holds a 22.5%interest. The mill is currently processing material from the Cigar Lake mine under a toll milling agreement (up to 18 million lbs U3O8per year); however, it has approximately 6 million lbs U3O8per year in additional licenced processing capacity, with a total licensed capacity of up to 24 million lbs U3O8per year.The Waterbury PEA assumes a recovery rate of 98.5% from the processing of UBS from the THT deposit at the McClean Lake mill.
It is assumed that the UBS will be transported to McClean Lake in trucks utilizing specifically designed tanks for transportation. The trucks would return with necessary lixiviant to complete ISR mining at THT. The McClean Lake Mill is assumed to have all necessary infrastructure to process the UBS and provide the lixiviant except for the facilities to provide surge storage of UBS and lixiviant at both the THT site and at McClean Lake.
The limited metallurgical testing of the THT deposit and a review of the Roughrider PEA indicates that a UBS head grade of 7 g/l may be possible through enhanced permeability techniques commercially available. The metallurgical tests completed during the Waterbury PEA indicate that approximately 27,000 tonnes of sulphuric acid will be required to leach the approximate 10 million lbs of U3O8located within the THT East pod. Approximately 9,000 tonnes of hydrogen peroxide will be required. Lixiviant concentrations of 35 g/L hydrogen peroxide and 100 g/L of sulphuric acid have been estimated from metallurgical leach tests. Currently available data from metallurgical leach tests indicate no iron needs be added to the lixiviant.
Processing THT at the McClean Lake mill would require minor mill modifications. THT UBS, trucked to the mill, would be stored in a tank or pond, providing surge capacity for both the mine and mill. From the UBS storage it would be pumped into the mill leach circuit. The McClean mill may find it advantageous to mix the UBS into their leaching process to take advantage of the low pH, reducing acid addition rates for their other feed streams. Following CCD solution clarification, the solution would be processed as per the current mill flowsheet.
Toll milling agreement terms have not been assessed as part of this study. UBS from the THT deposit at a production rate 2.1 million lbs of U3O8/yr will make up a small portion of the entire McClean Lake mill feed (estimated in the range of 10 to 15%). Final drummed 'yellowcake' will be a blend of the entire feed stream through McClean. The THT deposit is a relatively clean ore feed source in comparison to either Cigar Lake or the Midwest deposits both of which have contaminates of concern, that could result in penalties at the refinery. The scope of this study has not considered what other ores will be co-milled with the THT UBS, and therefore the final product make-up cannot be determined.
Infrastructure, Permitting and Compliance Activities
The THT site infrastructure has been modelled after the Wheeler River Phoenix infrastructure scaled appropriately for the requirements of the THT project.
Main land access to the site is from Saskatchewan Highway 905, via a road developed by Rio Tinto for their Roughrider exploration requirements. A road extension of 1.5 km will be required to access the ISR wellfield. Additionally, the existing road has been assumed to be upgraded from highway 905 to facilitate trucking of UBS and lixiviant.
2020 Annual Information Form 78
Due to the initial capital costs required to install a standalone processing plant at THT, processing of the THT deposit is expected to occur at the McClean Lake mill with the UBS being transported via trucks from the THT site to McClean Lake on the existing provincial road (45 kilometre one way). The trucks would complete the return trip to THT loaded with lixiviant.
Electrical power has been chosen for the PEA to be fed from a substation located approximately 13 km from the THT Site. Power has been assumed to be brought to site at 25 kV. A tradeoff study was completed as part of this study to compare line power to power generated at site, the conclusion of which favored line power. Additional work studying transmission and distribution options is required should further studies be completed.
The planned surface infrastructure at the THT site includes:
ISR wellfield and header houses
Freeze plant
Special and clean waste pads
UBS and lixiviant transportation pump stations for loading and unloading transport trucks
UBS storage pond
Lixiviant solution storage pond
Contaminated landfill
Operations center, complete with potable water, fire suppression and septic
2020 Annual Information Form 79
Electrical distribution
Wash bay, warehouse and shop
Propane and fuel storage tanks
Operational waste water management pond
The planned infrastructure at McClean Lake includes:
UBS storage pond
Lixiviant Storage pond
Lixiviant transportation truck loading station
2020 Annual Information Form 80
At this stage, no environmental fatal flaws have been identified for the project. Through project design and implementation of various best management practices, project effects on the environment are expected to be avoided or minimized while meeting all applicable environmental guidelines and regulations. Given the proximity of the project to a surface waterbody it is likely that the most significant public concern will be the potential impacts to the lake, and it will be imperative for Denison to demonstrate how the groundwater and surface water environments will remain protected. The project will require completion of a provincial environmental assessment and federal licensing which includes the review of the environmental assessment to support a licensing decision. The approval process is anticipated to take 24 months following the submission of the draft licensing and environmental impact assessment documents.
Denison recognizes the importance of early identification of Interested Parties, and in particular, Indigenous and non-Indigenous Communities of Interest who may have an interest in the THT project based on historical and / or contemporary land use activities, known and asserted traditional territories, and / or historical precedent with the uranium industry in the eastern Athabasca Basin region. As noted above, also of importance consideration is the strong interest most Interested Parties hold with respect to the protection of water, further underscoring the need for a proper and complete engagement strategy. As part of this process, Denison has identified a number of potential Communities of Interest for the THT project and can begin the process of suitable and appropriate engagement for the stage of the development of the THT project. This will assist Denison to determine the number and scale of Impact Benefit Agreements, which are often an important element as part of advancing a resource extraction project through the regulatory process in Canada.
Capital and Operating
The capital costs for the THT project were estimated relying on available data from the Wheeler River PFS and the 2016 NI 43-101 Cigar lake Operation Technical Report, as well as based on quotes and first principles estimates. The initial capital investment is estimated at $111.6 million, sustaining capital at $24.8 million and decommissioning costs at $25.2 million. The initial CAPEX includes a 30% contingency and excludes $20.1 million of project evaluation costs that must be incurred prior to construction. These costs should be considered when assessing the merit of advancing the project to a development decision in the future. The THT capital costs are outlined as follows:
THT Capital Costs ($ million)(1)
Initial
Sustaining
Total
Wellfield
49.6
24.4
74.0
Milling (McClean Lake modifications)
1.1
-
1.1
Surface facilities
2.1
-
2.1
Utilities
0.7
-
0.7
Electrical
5.0
-
5.0
Civil & earthworks
5.8
0.4
6.2
Offsite infrastructure
7.5
-
7.5
Decommissioning
-
19.4
19.4
Construction Indirect
14.0
-
14.0
Subtotal
85.8
44.2
130.0
Contingency
25.8
5.8
31.6
Total Capital Costs (100%)
111.6
50.0
161.6
(1)
Initial capital costs exclude $20.1 million of estimated pre-construction project evaluation and development costs.
2020 Annual Information Form 81
The operating costs for the THT project were estimated relying on available data from the Wheeler River PFS as well as historical milling cost from the MLJV for Toll Milling fees estimates, as well as first principal estimates. The total operating costs are estimated at $155.7 million ($16.27 per lb of produced U3O8).
The THT ISR operation is estimated to produce total mine production of 9.7 million pounds U3O8 over an approximate six year mine-life with final processing occurring at Denison's 22.5% owned McClean Lake mill. The Waterbury PEA includes an indicative timeline with pre-production activities beginning in 2025, and with first production estimated in 2028.
THT Operating Cost per Pound U3O8
CAD$
US$
Mining / Wellfield
5.73
4.31
Milling / Processing
8.07
6.07
Transport to converter
0.53
0.40
Site support and administration
1.94
1.46
Total Operating Costs per pound U3O8
$16.27
$12.23
Each WLULP partner reports its share of the operations in its own tax return. As each partner has a unique tax profile, the THT project has been evaluated using two different cash flow model approaches:
Pre-Tax Basis - A pre-tax discounted cash flow model which shows the economics of the project on a 100% basis. This case includes the Saskatchewan uranium Resource Surcharge (3.0%) and the Saskatchewan Basic Royalty (4.25% with Resource Credit) and excludes tax specific items related to Canadian Federal and Provincial income taxes and Saskatchewan profit-based royalties, each of which will vary depending on each partner's unique facts and circumstances; and
Post-Tax Basis - A post-tax discounted cash flow model, specific to Denison which shows the economics of the project based on Denison's ownership interest in the project. This case includes the Saskatchewan uranium Resource Surcharge (3.0%) and the Saskatchewan Basic Royalty (4.25% with Resource Credit) as well as tax specific items related to Canadian Federal and Provincial income taxes and Saskatchewan profit-based royalties and other non-tax related items which are unique and applicable to Denison's economic interest in the THT project.
The calendar years referred to in the economic model developed for the Project are indicative only, and should not be understood as reflecting the Company's plans for advancing the project. Any advancement of the Project, or the timing thereof, is subject to various factors, some of which may be outside of the Company's control. The Company has advised that it will provide additional applicable guidance on its intentions to advance the Project in its public disclosure, as appropriate.
Inputs and assumptions to both the pre-tax and post-tax cash flow models include:
An estimated 3-year pre-production period from July 2025 to June 2028;
Life of mine production of 177,664 tonnes at an average grade of 2.49% U3O8 containing 9,713,445 lbs of U3O8;
2020 Annual Information Form 82
A project mine production period of approximately 6 years from July 2028 to March 2033, with production beginning in mid-2028, reaching current planned capacity of 2.1 million lbs of U3O8 in 2029, operating at that rate for four years and declining to 0.3 million lbs of U3O8 in 2033, the final year;
Estimated metallurgical process uranium recoveries of 98.5%;
A base case uranium pricing scenario, provided by Denison, and based on UxC's Q3-2020 Uranium Market Outlook Report Composite Midpoint spot price projection, in constant / uninflated dollars, ranging from US$49.43 to US$57.07 per pound U3O8 during the THT mine production period, translated to CAD using an exchange rate of 1.33 CAD/USD;
Project capital costs of $161,608,000 (100% basis). This amount excludes $20,127,000 of pre-construction project evaluation and development capital costs (100% basis);
Project operating costs of $155,693,000 (100% basis);
No inflation or escalation of revenue or costs has been incorporated. Costs are expressed in 2020 Canadian dollars;
Adjustments for financing (via debt or equity) and any associated carrying charges thereon (interest, other financing charges) are not included;
Adjustments for working capital (timing adjustments in cash receipts re uranium sales and / or CAPEX, OPEX payments) are not included; and
The THT economic model does not include any intellectual property charges that may be borne by the project in the future from the use of Wheeler River ISR related proprietary information.
The pre-tax base case cash flow model is based on the inputs noted above and the following additional notes:
The evaluation of the project is on a 100% ownership basis;
No toll milling revenue or production credits applicable to MLJV participants is included;
No Saskatchewan Profit Royalty is included;
No provincial / federal tax calculations are included; and
Net Present Value ('NPV') calculations assume a discount rate of 8% (see Section 22.5.1 of PEA for additional information) and are measured from the start of the pre-production period (assumed July 2025).
The THT project economic results are quite sensitive to the price of uranium. To illustrate the impact on the project from lower and higher uranium price assumptions than those in the pre-tax base case, the PEA considers an additional two pricing scenarios: (1) the Low Case, which uses an estimated fixed uranium selling price of US$35.00/lb U3O8 for all production; and (2) a High Case, which uses an estimated fixed uranium selling price of US$65.00/lb U3O8 for all production.
A summary of the economic results of the pre-tax low, base and high case scenarios are illustrated in the table below.
2020 Annual Information Form 83
Pre-tax Economic Results (100% basis) Summary - Low, Base and High Case
Low Case
Base Case
High Case
Uranium price assumption
US$35 per lb U3O8
UxC spot price(3)
US$65 per lb U3O8
Pre-tax NPV8%(1)
$38,260,000
$177,295,000
$264,932,000
Pre-tax IRR(1)
17.4%
39.1%
50.0%
Pre-tax payback period(2)
~33 months
~22 months
~18 months
(1)
NPV and IRR are calculated to the start of pre-production activities for the THT project.
(2)
Payback period is stated as number of months to pay-back from the start of January 2028.
(3)
Spot price forecast is based on 'Composite Midpoint' scenario from UxC's Q3'2020 Uranium Market Outlook ('UMO') for the years 2028 to 2033 and is stated in constant (not-inflated) dollars.
The post-tax base case cash flow model is specific to Denison's ownership interest in Waterbury Lake and Denison's specific facts and circumstances as it relates to: a) tax pools it has available to it to reduce taxable income for Saskatchewan Profit Royalties as well as Canadian Federal and Provincial income taxes, and b) benefits that accrue to it from its interest in the MLJV.
Denison, through Denison Waterbury Corp, currently has a 66.90% ownership interest in the WLULP. The post-tax base case cash flow model is based on the inputs noted above, Denison's current ownership interest in the WLULP and the following additional items:
Adjustments for Denison's share of pre-construction project evaluation and development capital costs including contingency, and the associated impact on Denison's estimated tax pools;
The economic benefits associated with DMI's 22.5% share of the MLJV as it relates to THT toll milling at McClean;
The impact of the Saskatchewan Profit Royalty applicable on uranium production; and
Denison's expected Federal and Provincial income taxes payable (refer to section 22.6.1 of the Waterbury PEA for additional information).
Discounting for NPV calculations remains at 8% (refer to Section 22.5.1 of Waterbury PEA for additional information), and the impact of estimated net smelter royalties of $3.8 million owing to Denison on KWULP's share of THT production has not been included (refer to Section 4.5 of Waterbury PEA for additional information).
A summary of the economic results of the post-tax low, base and high case scenarios are illustrated in the table below.
Post tax Economic Results Summary, Low, Base and High Case
Low Case
Base Case
High Case
Uranium price assumption
US$35 per lb U3O8
UxC spot price(3)
US$65 per lb U3O8
Post-tax NPV8%(1)
$13,564,000
$72,470,000
$109,038,000
Post-tax IRR(1)
13.5%
30.4%
38.9%
Post-tax payback period(2)
~34 months
~23 months
~19 months
(1)
NPV and IRR are calculated to the start of pre-production activities for the THT project.
(2)
Payback period is stated as number of months to pay-back from the start of January 2028.
(3)
Spot price forecast is based on 'Composite Midpoint' scenario from UxC's Q3'2020 Uranium Market Outlook ('UMO') for the years 2028 to 2033 and is stated in constant (not-inflated) dollars.
The PEA is a preliminary analysis of the potential viability of the project's mineral resources, and should not be considered the same as a Pre-Feasibility or Feasibility Study, as various factors are preliminary in nature. There is no certainty that the results from the PEA will be realized. Mineral resources are not mineral reserves and do not have demonstrated economic viability.
2020 Annual Information Form 84
McClean Lake
The McClean Lake projects are owned by Denison (22.5%) and Orano Canada (77.5%). Orano Canada is the operator/manager of the projects.
Except as otherwise noted below, the project descriptions are based on the Company's technical reports: (A) the 'Technical Report on the Denison Mines Inc. Uranium Properties, Saskatchewan, Canada' dated November 21, 2005, as revised February 16, 2006 (the 'McClean Technical Report'), (B) the 'Technical Report on the Sue D Uranium Deposit Mineral Resource Estimate, Saskatchewan, Canada' dated March 31, 2006 (the 'Sue D Report'), and (C) the 'Technical Report on the Mineral Resource Estimate for the McClean North Uranium Deposits, Saskatchewan' dated January 31, 2007 (the 'McClean North Technical Report'), copies of which are available on the Company's profile on the SEDAR website at www.sedar.com. Scott Wilson RPA (now Roscoe Postle Associates Inc.) was engaged to prepare and deliver the McClean Technical Report (authored by Richard E. Routledge, M.Sc., P.Geo.), the Sue D Report and the McClean North Technical Report (each authored by Richard E. Routledge, M.Sc., P.Geo. and James W. Hendry, P.Eng.). Each author was an independent Qualified Persons for the purposes of NI 43-101. By letter dated October 20, 2009, Orano Canada received from Scott Wilson RPA subsequent corrections to the resource estimate in the McClean North Technical Report, which revisions have been incorporated herein as applicable.
The conclusions, projections and estimates included in this description are subject to the qualifications, assumptions and exclusions set out in the technical reports. We recommend you read the technical reports in their entirety to fully understand the projects.
Property Description, Location and Access
The McClean Lake property is located within the eastern part of the Athabasca Basin in northern Saskatchewan, approximately 26 kilometres west of the Rabbit Lake mine and approximately 750 kilometres north of Saskatoon. Access to the McClean Lake site is by both road and air. Goods are transported to the site by truck over an all-weather road connecting with the provincial highway system. Air transportation is provided through the Points North airstrip about 25 kilometres from the project site.
The mineral property consists of four (4) mineral leases covering an area of 1,147 hectares and 13 mineral claims covering an area of 3,111 hectares. The right to mine the McClean Lake deposits was acquired under these mineral leases, as renewed from time to time. Mineral leases are for terms of 10 years with the right to renew for successive 10-year periods provided that the leaseholders are not in default of the terms of the lease. A mineral claim grants the holder the right to explore for minerals within the claim lands and the right to apply for a mineral lease. The current mineral leases have terms that expire between November 2025 and August 2026 and title to the mineral claims is secure until at least 2041. It is expected that the leases will be renewed in the normal course, as required, to enable all the McClean Lake deposits to be fully exploited.
The right to use and occupy the lands at McClean Lake has been granted in a surface lease agreement with the province of Saskatchewan. The McClean surface lease was entered into in 2002, has a term until 2035 (33 years) and covers a land area of approximately 3,677 hectares.
The uranium produced from the McClean Lake deposits is subject to uranium mining royalties in Saskatchewan in accordance with Part III of The Crown Mineral Royalty Regulations. See 'Government Regulation - Canadian Royalties.' In addition, a royalty of 2% of the spot market price on all U3O8 produced from the Sue E deposit is payable to the previous owner of a portion of the deposit.
2020 Annual Information Form 85
History
Several operators and related joint ventures have managed the McClean Lake project from 1968 to present. Their involvement has resulted in the discovery of several uranium deposits including McClean North, McClean South, JEB, Sue trend (A,B,C,D,E) and Caribou. Exploration activities over the project have involved extensive geophysical surveys, both airborne and ground, in addition to exploration/delineation diamond drilling.
Uranium production from the McClean Lake deposits at the onsite McClean mill facility to date (current to 2020) is approximately 50 million pounds U3O8. The ore feed for production is almost entirely sourced from mining activities of the Sue (A, B, C, and E) and JEB deposits.
1968 - 1974 (Gulf Minerals Canada Ltd.)
From 1968 to 1974, the entire area was held under permit (Permit #8) by Gulf Minerals Canada Ltd. During this period, Gulf flew an airborne radiometric survey over the area and conducted reconnaissance and ground level surveys.
1974 - 1985 (Canadian Occidental Petroleum Ltd.)
In 1974 Gulf reduced their land holding and allowed Permit #8 to lapse. Canadian Occidental Petroleum Ltd. ('CanOxy') acquired the ground and flew a reconnaissance survey over the area in July of that same year and preceded to stake a 260 square kilometre area called then the Wolly property (now divided into the McClean Lake and Wolly properties). CanOxy operated the project from 1974 to 1985 at first without partners, then in 1977, in partnership with Inco Ltd.
Initial exploration consisted of geochemical and ground radiometric prospecting with follow up drilling. Several geophysical methods were also used, but correlation with geochemical and radiometric anomalies was generally poor. In 1977, airborne magnetic and EM surveys were flown over the property. The results indicated conductive trends and helped to better define the regional basement structure and lithology. The first significant discovery came in 1978, when the Tent Lake zone was found along a major conductive trend. Following this discovery, the emphasis was on geophysical rather than geochemical or radiometric targets. From 1979 to 1985, several major discoveries were made based mainly on geophysics and improved geological interpretations. This included the McClean North deposit in 1979, the McClean South deposit in 1980, the Candy Lake zone in 1981 and the JEB deposit in 1982. During this period, CanOxy completed 781 drill holes for 118,540 metres of drilling; most of them concentrated in the area now known as the McClean Lake property.
1985 - 1993 (Minatco / Denison Mines / OURD)
In January 1985, Minatco entered into a joint venture agreement with CanOxy and Inco to become the operator of the project. Geophysical and drilling programs were conducted throughout the project area to follow up existing mineralized areas, and explore new zones. In 1987, an additional zone (Pod 5) was found in McClean North. Several very significant discoveries were also made the following year, in 1988: two new mineralized zones, Sue A and B were found in the Sue area, which would lead to the discovery of the highly productive Sue trend; mineralization was indicated on the McClean South conductor, west of the McClean Southwest pod; and additional mineralization was found in McClean North.
2020 Annual Information Form 86
Additional work in the Sue area over the next few years, led to the Sue C deposit in 1989, the Sue D deposit in 1990 and the Sue E deposit in 1991. From 1985 to 1993, Minatco completed 1,160 drill holes for a total of 171,090 metres of drilling on the Wolly and McClean Lake projects, most of them concentrated again in the area now known as the McClean Lake property. In 1990, the CanOxy-Inco JV sold out to Minatco.
In 1993, Denison Mines Ltd. exchanged with Minatco a 70% interest in the Midwest Lake project for a 22.5% interest in the McClean Lake project. OURD (Canada) Co., Ltd. ('OURD') obtained a 7.5% interest. Orano Canada (formerly Cogema Resources Inc.) also acquired the uranium assets of TOTAL (Minatco in Canada) and became the operator of the McClean Lake Project.
In 1993, the joint venture planned to proceed with mine development. The McClean Lake property was created, and defined as a portion of the Wolly property outlined by a surface lease (containing the JEB, Sue and McClean deposits).
2020 (Orano Canada / Denison)
In 2020, OURD sold its 7.5% interest in the MLJV to Orano Canada.
Geological Setting, Mineralization and Deposit Types
The McClean Lake uranium deposits lie near the eastern margin of the Athabasca Basin in the Churchill Structural Province of the Canadian Shield. The bedrock geology of the area consists of Precambrian gneisses unconformably overlain by flat lying, unmetamorphosed sandstones and conglomerates of the Athabasca Group. The Precambrian basement complex is composed of an overlying Aphebian aged supracrustal metasedimentary unit infolded into the older Archean gneisses. The younger Helikian aged, Athabasca sandstone was deposited onto this basement complex. The basement surface is marked by a paleoweathered zone with lateritic characteristics referred to as regolith.
The McClean Lake uranium deposits which include the Sue deposits (A to E), McClean deposits (North and South), Caribou deposit and JEB deposit are unconformity-related deposits of the unconformity-hosted variety.
Exploration and Drilling
Exploration activities including ground geophysics and diamond drilling were conducted by Orano Canada from 1994 to present. The majority of exploration has been focused on areas of known mineralization at McClean North/South, Sue Trend, JEB and the Tent Seal Trend. Other target areas on the property which have also been subject to ground geophysics and drilling include Candy Lake, Bena, Vulture and Moffat Lake. In 2002 the discovery of Caribou, the high- grade unconformity related uranium deposit was made approximately 2 kilometres northwest of the Sue C open pit. No other significant discoveries have been made since 2002. During the period 1994 to 2019 Orano Canada completed 98,498 metres of drilling in 505 holes, with no significant exploration conducted on the property in 2020.
Orano Canada's proposed 2021 exploration program consists of 10 to 12 hole drills for approximately 3,200 metres, which is designed to extend the mineralization around the McClean South 8W and 8E pods as well as test for mineralization in the surrounding area.
Sampling, Analysis and Data Verification
The following description applies to all exploration on the McClean Lake property.
2020 Annual Information Form 87
Following the completion of a drill hole, the hole is radiometrically logged using a downhole slim-line gamma probe. The gamma-log results provide an immediate equivalent uranium value (eU%) for the hole, which, except in high grade zones, is reasonably accurate. The gamma-log results, however, have not been used for the purposes of estimating mineral reserves or resources unless core loss is significant. Sample intervals are generally 50 centimetres long, except where higher or lower grade mineralization boundaries fall within the interval. In that case, two 25 centimetre samples are collected. Flank samples of 1.0 metre are always collected where mineralization is located. A background geochemistry sample is collected every 10 metres down the hole.
All sampled core is split in half, one half retained and the other sent to an independent laboratory. Lost core is not an issue at the McClean project as core recovery has been good. Control samples are routinely assayed with each batch of core samples analyzed.
The mineralization in the various McClean deposits is highly variable in both mineralogy and uranium content. The principal minerals identified in the deposits are pitchblende, uraninite and niccolite. As a result of the highly variable uranium content, a variable density formula was developed for the McClean deposits. This formula was modified over the years to account for the fact that it originally tended to underestimate U3O8 content where the U3O8 values were associated with high values of nickel and arsenic.
No opinion can be given regarding security of samples in the mid to late 1970s and the late 1980s other than to indicate that subsequent geological work and all metallurgical and geotechnical work have confirmed the results. All procedures reviewed follow generally accepted industry practice. A good demonstration of the reliability is that JEB and the Sue deposits (B and C) have been mined out and more uranium has been recovered into stockpiles than had been estimated from surface drilling.
Mineral Reserve and Mineral Resource Estimates
Estimation procedures have evolved over the years. At the time of the feasibility study in 1990, polygonal methods were used for the JEB, the Sue A, the Sue B, the Sue C deposits and for the McClean zones. Prior to the start of mining at the JEB deposit, the mineral reserves were re-evaluated using computerized methods whereby block models were constructed and geostatistical methods were implemented. Much more recently, these mineral resource estimates have been further refined using Whittle pit optimization software. Appropriate tests and audits of the databases on all the McClean deposits have been carried out by past qualified Denison personnel. In the case of JEB, Sue C and Sue B, the amount of U3O8 recovered into stockpiles was higher than that estimated from surface drilling.
The Company received the McClean Technical Report from Scott Wilson RPA (now Roscoe Postle Associates Inc.) on its mineral reserves and mineral resources at certain of the deposits (Sue A, B, E and McClean North and Caribou) at McClean Lake. See 'Mineral Reserves and Mineral Resources', above, for a summary of the mineral resource and mineral reserve estimates remaining, after adjusting for mining activity, as applicable.
In preparing the McClean Technical Report, Scott Wilson RPA reviewed previous estimates of mineral reserves and mineral resources at the applicable properties, and examined and analyzed data supporting the previous estimates, as well as other available data regarding the properties, including extensive information from Orano Canada.
2020 Annual Information Form 88
For the Sue E deposit, Scott Wilson RPA constructed a block model using indicator kriging to both map out and geologically constrain mineralized areas. A block that had at least one nearby composite within 10 metres of its centre, and that had composites from at least two different drill holes in its search neighbourhood was classified as part of the indicated mineral resource. The indicated mineral resource was evaluated by Scott Wilson RPA in 2005 using Whittle economic evaluation software showing that the Sue E pit economics were robust and mineral reserves were estimated. Mining was completed at the Sue E pit during 2008 recovering about 91% of the probable mineral reserves estimated. Scott Wilson RPA classified approximately 7.3 million of the pounds outside the current pit as inferred mineral resources. Confirmatory drilling in 2006 by the operator has indicated that this may be reduced to 2.0 million pounds, but mineral resources have not been re-estimated.
The mineral resource estimate for the Caribou deposit is based on a block model for which grade was interpolated using ordinary kriging. Since there were no plans for the mining of this deposit at the date of the McClean Technical Report, the economic potential was not evaluated and mineral reserves were not estimated.
With respect to the Sue D deposit, the Company received the Sue D Report in 2006, authored by Scott Wilson RPA. Scott Wilson RPA carried out an independent mineral resource estimate for Sue D by conventional 3-D computer block modeling. A minimum vertical mining width of two metres was employed with a 0.1% U3O8 cut-off.
Due to the significant increase in the price of uranium from 2004 to 2006, Denison engaged Scott Wilson RPA to re-evaluate the uranium resources in the McClean North trend that are amenable to other methods of mining. The original McClean Technical Report had only evaluated mineral resources and mineral reserves of the high grade portions under the assumption that they would be mined using a blind shaft mining method. The Company received the McClean North Technical Report on the mineral reserves and resources at the McClean North uranium project in 2007.
The re-evaluation of McClean North was carried out by conventional 3-D computer block modeling. Wire frames were constructed for each of pods 1, 2 and 5. The estimate included internal dilution, but not external dilution, and was carried out at a 0.1% U3O8 cut-off. This mineral resource estimate is based entirely on diamond drill information. Block cell dimensions were selected at 8 metre model grid east west x 5 metre model grid north south and a 2 metre bench height or approximately 180 tonnes/block. Scott Wilson RPA constructed a mineral resource wireframe based on kriging, and constructed a special waste wireframe, that generally surrounds the mineral resource wireframe, using similar kriging parameters but with larger search distances. Subsequent to this report, the Company and Scott Wilson RPA reviewed the block model and estimation procedures in October 2009 and made a slight revision to the mineral resource estimate for the McClean North deposit.
Mining Operations
McClean Lake consists of nine known ore deposits: JEB; Sue A, B, C, D and E; McClean North; McClean South; and Caribou. In 1995, the development of the McClean Lake project began. Mill construction commenced in 1995 and ore processing activities reached commercial production in November 1999. Mining operations also commenced, and the following deposits have been mined out to date: JEB (1996 to 1997), Sue C (1997 to 2002), Sue A (2005 to 2006), Sue E (2005 to 2008) and Sue B (2007 to 2008). Various test mining programs from 2006 to date have also been conducted at McClean North.
At December 2020, the remaining ore reserves consist of a limited quantity of stockpiled ore from historical Sue B open pit mining operations and test mining activities at McClean North.
2020 Annual Information Form 89
Approximately 87,454 tonnes of Sue B ore at a grade of 0.35% U3O8 and 2,226 tonnes of McClean Lake North ore (mined via SABRE, as defined below), at an average grade of 0.68% U3O8, are stockpiled on surface as at the end of 2020. Other than continued test mining activities for SABRE, no additional mining operations are planned at this time.
Low-grade special waste from the mining of the JEB, Sue C, Sue A, Sue E and Sue B deposits has been disposed of in the mined-out Sue C pit. In the future, Cigar Lake special waste is also expected to be disposed of in the Sue C Pit. By agreement between the CLJV and the MLJV, costs to update the Sue Water Treatment Plan and costs to dewater the Sue C pit for Cigar Lake special waste will be shared 50/50 between the CLJV and MLJV.
SABRE
The MLJV is currently assessing the Surface Access Borehole Resource Extraction ('SABRE') mining method technology for extraction of the McClean North deposits. The SABRE technology is experimental and a feasibility study has not yet been completed. Previous field tests of the SABRE technology have produced a small amount of ore, some of which has been processed into U3O8 and some of which remain in the ore stockpile at December 2020. See 'Denison's Operations - SABRE Mining Program' below for more information on SABRE.
Processing and Recovery Operations
Processing of the McClean Lake ore stockpiles is anticipated to occur prior to the end of life of the McClean Lake mill. Historical processing of the McClean Lake orebodies through 2000 to 2010 has demonstrated strong performance, with recoveries above 97%. The MLJV anticipates processing of the remaining stockpiles to have similar performance results.
Development and Production
In 2012, Orano Canada (then AREVA) initiated an internal study evaluating the feasibility of mining the McClean North, Caribou and Sue D deposits via conventional underground methods. The internal study was completed in April 2014; however, no formal technical report has been prepared by Denison in accordance with NI 43-101 and a production decision has been deferred indefinitely due to the low uranium price environment.
As part of the continuing development of the SABRE mining tool in 2021, a small test mining program at McClean North is expected to occur with the potential to generate some ore for future processing. See 'Denison Operations-SABRE Mining Program' for more information on the SABRE development program and potential processing activity for 2021.
Infrastructure, Permitting and Compliance Activities
The McClean Lake uranium mill, one of the world's largest uranium processing facilities, is contracted to process ore from the Cigar Lake mine under the Cigar Lake toll milling arrangement between the MLJV and the CLJV. The site has been in operation since the late 1990's and consists of the mill, a tailings management facility, administration offices and building, camp facilities, back-up power supply, water treatment plants and a host of other minor facilities. The site is connected to the provincial power grid and provincial highways. Points North Landing Airport provides transportation to and from site for personnel on a daily basis.
As a uranium site, the CNSC permits the operations. On July 1, 2017 the McClean site received a 10 year license for operations until June 30, 2027. See 'Denison's Operations - McClean Lake Mill License' for more details.
2020 Annual Information Form 90
Midwest
The Midwest project is owned by Denison (25.17%) and Orano Canada (74.83%) pursuant to the Midwest Joint Venture Agreement. Orano Canada is the operator of the project.
Except as otherwise noted below, this project description is based on the project's technical report entitled 'Technical Report with an Updated Mineral Resource Estimate for the Midwest Property, Northern Saskatchewan, Canada' dated March 26, 2018 (the 'Midwest Technical Report'), a copy of which is available on the Company's profile on the SEDAR website at www.sedar.com. The Midwest Technical Report was authored by Dale Verran, MSc, P.Geo, Pr.Sci.Nat., formerly of the Company, Chad Sorba, P.Geo, of the Company, G. David Keller, PGeo, formerly of SRK, and Oy Leuangthong, PEng, of SRK. G. David Keller and Oy Leuangthong were independent qualified persons for the purposes of NI 43-101.
The conclusions, projections and estimates included in this description are subject to the qualifications, assumptions and exclusions set out in the technical report. We recommend you read the technical report in its entirety to fully understand the project.
Property Description, Location and Access
The Midwest property is located within the eastern part of the Athabasca Basin in northern Saskatchewan. The northern portion of the property is located on South McMahon Lake, about one kilometre from the Points North Landing airstrip and about 25 kilometres west by existing roads from the McClean Lake mill on the McClean Lake property. The site is approximately 750 km by air north of Saskatoon and about 420 km by road north of the town of La Ronge.
Access to the Midwest property is by both road and air. Goods are transported to the site by truck over an all-weather road connecting with the provincial highway system. Air transportation is provided through the Points North airstrip.
The property consists of three (3) contiguous mineral leases, covering 1,426 hectares and contains both the Midwest Main and Midwest A deposits. The mineral lease containing the Midwest Main deposit (ML 5115) is 556 hectares in size. Each of the mineral leases is at an annual assessment rate of $75.00 per hectare and has sufficient approved assessment credits to maintain the ground in good standing until 2041. There is no current production from these mineral leases. Leases must be renewed every 10 years as part of an administrative process.
Since the completion of the underground test mine at the Midwest Main deposit in 1988 and 1989, the site has been under an environmental monitoring and site security surveillance program. At present, there is an inactive water treatment plant, two water storage ponds and a core storage area on the site, as well as a dam in the Mink Arm of South McMahon Lake. All of the facilities used in the test mine program and all of the existing surface facilities are located on lands owned by the province of Saskatchewan. The right to use and occupy the lands was granted in a surface lease agreement with the province of Saskatchewan. The original surface lease agreement of 1988 was replaced by a new agreement in 2002. This new surface lease is valid for a period of 33 years. Obligations under the surface lease agreement primarily relate to annual reporting regarding the status of the environment, the land development and progress made on northern employment and business development. The Midwest surface lease covers an area of approximately 646 hectares.
2020 Annual Information Form 91
Location of the Midwest Main and Midwest A deposits on the Midwest project
Any uranium produced from the Midwest deposits is subject to uranium mining royalties in Saskatchewan in accordance with Part III of The Crown Mineral Royalty Regulations. See 'Government Regulation - Canadian Royalties.' A portion of Denison's interest in the Midwest project (i.e. 5.5% of the project reducing to 3.44% after payout) is subject to a sliding-scale, gross overriding royalty ranging from 2% to 4% payable to two previous owners of a portion of the Midwest project.
2020 Annual Information Form 92
There are no known significant factors or risks that may affect access, title, the right, or ability of Orano Canada to perform work at/on the Midwest property.
History
Initial exploration work in the vicinity of the two Midwest deposits began in 1966. Canada Wide Mines Ltd., a subsidiary of Esso Resources Canada Ltd., was operator of the project from 1968 to 1982. From 1968 to 1975, exploration was carried out on an exploration permit which included the area covered by the current mineral leases. Most of the work was concentrated on the area near South McMahon Lake where uranium mineralized boulders were found. In 1974, the exploration permit was changed to mineral leases.
During the winter season of 1977, one of the holes drilled through the unconformity encountered mineralization. In January 1978, the Midwest Main deposit was intersected by the first drill holes. During 1978 through 1980, a further 439 holes were drilled (for a total of about 650) to delineate the deposit and to explore the surrounding area of the mineral leases.
In 1987, Denison acquired a 45% interest in the Midwest project and became the operator. An underground test mine program was completed in 1989 which confirmed the results of the surface drilling program and identified a high grade historical mineral reserve containing 35.7 million pounds of U3O8 at an average diluted grade of 4.5% U3O8, considered to be mineable by underground methods. This is a historical estimate, not being treated as current mineral reserves. During this time, Denison also performed an EM-37survey and geotechnical drilling on the Midwest Main deposit. Exploration drilling was conducted to the east (1988) and along the conductive trend to the north of Midwest Main deposit (1989).
In 1993, the respective owners of McClean Lake and Midwest combined their interests to make two complementary projects with one mill at McClean Lake. In order to accomplish this, a portion of Denison's interest in Midwest was exchanged for an interest in McClean Lake. This transaction, together with several related ownership changes, resulted in Denison's ownership interest in Midwest being reduced to 19.5% and Minatco, Orano Canada's predecessor in title, becoming the operator.
In 1999, Denison increased its interest in Midwest by 5.50% through the exercise of first refusal rights. With the uncertainty of the timing and costs of the Midwest development and the desire to eliminate the obligation to pay advance and future royalties on production from Midwest, Denison decreased its interest in Midwest from 25% to 19.96% effective March 31, 2001. Orano Canada, the operator/manager of Midwest, also reduced its interest from 70.5% to 54.84% for the same reason.
At the end of 2004, in order to take advantage of rapidly increasing uranium prices, Denison again increased its interest at Midwest, along with its joint venture partners, by buying the 20.70% interest in Midwest then held by Redstone Resources Inc. This purchase permitted Denison to acquire a further 5.21% interest in Midwest, bringing its interest to 25.17%. Orano Canada's interest increased to 69.16% and OURD's interest increased to 5.67%.
In 2020, OURD sold its interest in Midwest to Orano Canada.
Geological Setting, Mineralization and Deposit Types
The Midwest deposits are classified as 'unconformity-type' uranium deposits and occur approximately 200 metres below surface straddling the unconformable contact between overlying Athabasca Group sandstones and the underlying Paleoproterozoic and Archean basement rocks belonging to the Wollaston-Mudjatik Transition Zone.
2020 Annual Information Form 93
The north-northeast Midwest structural trend that controls the Midwest Main and Midwest A uranium deposits follows a steeply-dipping, graphitic pelitic gneiss, basement unit that is bounded by granitic gneisses or granite to both the east and west. The sub-Athabasca unconformity surface is relatively flat on a regional scale, however there is a slight uplift along the north-northeast Midwest trend and a generally higher elevation to the east. Fault zones in the basement are often characterized by brecciation and strong hydrothermal alteration with clay mineral development. These fault zones generally extend into the overlying Athabasca Group sandstone.
The Midwest Main deposit is lens to cigar shaped, 600 metres long, 10 to over 100 metres wide, with thicknesses ranging from 5 metres to 10 metres. The deposit consists of a near-massive, high-grade mineralized core that straddles the unconformity approximately 210 metres below surface. The high-grade core is surrounded by lower-grade, more dispersed, fracture-controlled mineralization in both sandstone and, in minor amounts, in basement rocks. The high-grade mineralization forms a roughly flat-lying lensoid concentration, with a root extending down into the basement rocks along a steeply-dipping fault.
The Midwest A deposit is approximately 450 metres long, 10 to 60 metres wide, ranges up to 70 metres in thickness and occurs between 150 and 235 metres below surface. Mineralization straddles the unconformity contact with minor amounts hosted within basement structures immediately below the unconformity. Thicker zones of mineralization above the unconformity are concentrated in conglomerate units at the base of the Athabasca sandstone. Similar to Midwest Main, a high-grade core of mineralization is surrounded by a lower-grade, more dispersed, fracture-controlled envelope.
Exploration and Drilling
Under Orano Canada's operatorship, exploration activities resumed in 2004. Exploration drilling was initiated some three kilometres to the northeast of the Midwest deposit to test ground around a historic hole MW-338 that had returned an isolated intercept of 3.8 metres at 6.9% U3O8. Between 2005 and 2009, a further 50,831 metres of drilling was completed in 191 drill holes on the property, which discovered and delineated the Midwest A deposit and identified and evaluated several other mineralized areas, including the Josie Zone, lying between the Midwest and the Midwest A deposits. 76 of these holes (20,794.9 metres) have intersected the mineralization associated with the Midwest A deposit. Additional geophysical programs were also conducted.
The Midwest Main deposit was intensively drilled in the late 1970's and 1980s. Drill holes defining the Midwest deposit include 615 drill holes, of which 362 are mineralized. By type, these include exploration, shallow reconnaissance (<100 metres), and geotechnical drill holes. Between 2004 and 2017, only 11 drill holes have been completed on the Midwest Main deposit area under Orano Canada's operatorship. Four inclined geotechnical holes were drilled in 2004 and four shallow geotechnical drill holes were completed in 2006. Three additional exploration drill holes were carried out within the deposit outlines in 2006 (MW-677, MW-678, and MW-685).
No exploration work was conducted at Midwest during the period 2010 to 2017, 2019 or 2020. The winter 2018 drill program comprised 4,709 metres in 12 completed diamond drill holes. Drilling was conducted on the Points North conductor (6 drill holes, 2,269 metres) to test exploration targets, and at Midwest Main (6 drill holes, 2,440 metres) to collect additional information from the unconformity-hosted mineralized zone and to test underlying basement targets. The drilling validated mineralization at the Midwest Main deposit (based on preliminary radiometric equivalent uranium results), but did not intersect any high-grade mineralization on the Points North conductor, or below the Midwest Main deposit within the basement.
2020 Annual Information Form 94
Orano Canada's proposed 2021 exploration activities for Midwest include electromagnetic surveying and an exploration drill program of approximately 8 to 11 holes for approximately 3,400 metres.
Sampling, Analysis and Data Verification
During 2017, Orano Canada undertook a comprehensive review of the databases for both the Midwest Main and Midwest A deposits ahead of an updated mineral resource estimate. Concerns were identified at both deposits that needed to be addressed to increase both the confidence and the accuracy of the final estimate.
Given the historic nature of the data at Midwest Main a limited amount of data was readily available digitally: downhole gamma probe ('probe') data existed only as paper logs making it previously unavailable to be used, no comprehensive 3D geological model was available, perched mineralization was not fully modeled, and further data QAQC was needed. Midwest A has a much more modern data set; however, no dry bulk density measurements were available, the latest drilling from September 2007 to December 2009 was not taken into account in the previous estimate, and the High Grade Zone was assigned an average uranium grade rather than performing grade modelling. Additionally, both deposits required new probe to chemical uranium assay grade ('grade') correlations for the calculation of equivalent uranium (eU), combination of probe and grade data based on core recovery and probing/drilling parameters to be available for estimation, updated lithology and structural models (geological models), and an updated block model.
Work began with verifying the grade data against assay certificates and a historical nine track database from ESSO. Some discrepancies were noted in the sample locations as well as some of the grades due to typographical errors. When compared to the original drill logs and the probe logs, these were able to be rectified.
The Midwest deposits often have core loss associated with the mineralization, due to the high amount of clay alteration and quartz dissolution which makes core recovery while drilling difficult. This results in gaps in the grade dataset that are typically addressed by using probe radiometric equivalent uranium (eU) data. Digital probe data was available for Midwest A, however for Midwest Main most of probe data was never digitized and remained only available on paper logs. The paper logs for 218 holes were digitized and added to the Midwest data set. This was followed up by ensuring the probe data was depth corrected (depth matched with grade data), as well as the creation of new probe to grade correlations for both deposits.
Midwest Main had a robust density to grade correlation; however, Midwest A did not have any dry bulk density measurements taken. The only density data at Midwest A was in the form of specific gravity measurements which do not take into account porosity and therefore tend to overestimate the density. Due to the high density of uranium, density is a vital reference for the expected tonnage of high-grade uranium deposits, which has a direct effect on the amount of uranium estimated. Given this uncertainty at Midwest A, previous resource estimations were forced to use a very conservative grade to density regression formula to avoid overestimation of resources. During a 2017 site visit, 25 dry bulk density measurements were taken from the remaining Midwest A drill core and sent for dry bulk density and geochemical analyses. A new grade to density regression formula was established showing an increase to the correlation by approximately 10%.
2020 Annual Information Form 95

Various chemical assay methods have been employed at the Midwest Project prior to Orano Canada assuming operatorship in 2004. The methods described herein pertain to the program from 2004 onwards. Drill core with anomalous total gamma radioactivity (>200 counts per second utilizing a SPP2 or SPPc scintillometer) was sampled over 0.5 metre intervals. Sampling is undertaken on site by splitting the core in half, with one half submitted for analysis and the other half retained in the core box for future reference. Uranium chemical assays are performed by the SRC Lab located in Saskatoon. Sample preparation involves crushing and pulverizing core samples to 90% passing -106 microns. Splits of the resultant pulps are initially submitted for multi-element ICP-MS analysis following partial (HNO3:HCl) and total (HF:HNO3:HClO4) digestions. Samples with ≥ 1,000 ppm U (partial digest) are re-assayed for U3O8 using an ISO/IEC 17025:2005 accredited method for the determination of U3O8 weight %. Pulp splits are digested using aqua-regia and the solution analyzed for U3O8 weight % using ICP-OES.
For composite exploration samples, collected over 20 metre (upper sandstone) or 10 metre intervals (lower sandstone and basement), major and trace elements are determined using ICP-MS or ICP-OES after partial and total digestions. Boron values are obtained through NaO2/NaCO3 fusion followed by ICP-OES. In addition to internal checks by the SRC Lab, Orano Canada has rigorous QAQC procedures including the insertion of standard reference materials, blanks and field duplicates.
For mineral resource estimation purposes, wherever core recovery was less than 75%, the eU values derived from a calibrated downhole gamma probe are substituted for chemical assays where possible. Core recovery at Midwest Main is typically good with poorer recovery observed at Midwest A. For the Midwest A and Midwest Main updated mineral resource estimates reported herein, 64% and 16% of the assay intervals relied on eU grades, respectively.
Orano Canada has performed detailed QAQC and data verification, where possible, of all datasets, which in Denison's opinion are in accordance with industry best practice. Denison has performed additional QAQC and data verification of the drilling database including review of the QAQC methods and results, verification of assay certificates against the database assay table, review of downhole probe and eU calculation procedures, standard database validation checks and two site visits to the Midwest project in early 2018. Denison has reviewed Orano Canada's procedures and protocols and considers them to be reasonable and acceptable for mineral resource estimation.
Mineral Processing and Metallurgical Testing
Several programs of metallurgical testing have been carried out on Midwest Main mineralization. The two main studies were by Melis Engineering in 1990 and by SEPA (Service d'Études, de Procédés et Analyses, engineering department of the Orano Group in France) in 1998. Both studies show that good metallurgical recovery of uranium can be achieved. The current McClean mill milling process differs from what was planned by Melis as a separate facility was planned in the study. The leaching tests done by SEPA on the Midwest Main mineralization samples showed that 99.5% of uranium could be extracted using these conditions:
● Leach time 24 hours
● Acid addition 120 kg/tonne
● Free acid at end of test 25 g/l
● Oxidation, 02 at 2 bar pressure
● Redox 470 m.v.
2020 Annual Information Form 96
The current process for Cigar Lake ore being processed at the McClean mill requires an eight hour leaching time which is substantially less than what is proposed as optimal for Midwest Main ore (24 hours). As the mill has recently undergone upgrades, it is expected these leaching times will be reviewed.
The test work has demonstrated that a metallurgical recovery for uranium of 98% from Midwest Main mineralization can be obtained.
The Midwest Main deposit has a relatively high amount of arsenic (5-10% overall), which could affect the water quality discharge from the mill if not properly precipitated into the tailings. The SEPA study proposed using ferric sulphate to precipitate the arsenic in the tailings. Currently the mill is addressing moderate arsenic levels in the Cigar Lake ore feeds using barium chloride and ferric sulphate to precipitate it from solution.
Test work was conducted by Denison in 1992 at Lakefield Research to determine if the recovery of nickel and cobalt was feasible along with the extraction of uranium (Lakefield Research, 1992). Test work indicated that a precipitate with good grades of nickel and cobalt could be produced from a raffinate solution after the arsenic and radium are precipitated. It is estimated that an overall process recovery of 54% for both nickel and cobalt could be achieved.
The McClean mill has seen many upgrades and changes since the 1992 and 1998 studies were conducted. Review of the studies and additional metallurgical testing will likely need to be conducted prior to assessing the feasibility of mining of Midwest Main.
There has been no mineral processing or metallurgical test work completed on the Midwest A deposit.
Mineral Resource Estimates
The Company retained SRK to independently review and audit an updated mineral resource estimate for the Midwest project completed by Orano Canada in November 2017. The review and audit was done in accordance with CIM Definition Standards (2014) and NI 43-101. The Company received a memorandum from SRK dated March 9, 2018, which was incorporated into the Midwest Technical Report. See 'Mineral Reserves and Mineral Resources', above, for a summary of the mineral resource estimate for the Midwest project.
In November 2017, Orano Canada provided Denison with a comprehensive project database consisting of drill hole data, mineralized wireframes and block models for both the Midwest Main and Midwest A deposits. The Midwest database was sent to SRK to conduct review and audit of the updated mineral resource estimate completed by Orano Canada. For the audited mineral resource estimate, SRK used data collected from several drilling campaigns completed between 1977 and 2009, including a total of 156 drill holes for Midwest A and 305 drill holes for Midwest Main. The audited mineral resource estimate includes expanded Low Grade and High Grade zones for Midwest A and three primary mineralized zones at Midwest Main, namely Unconformity, Perched and Basement zones. A summary of the audited estimation methodology and for Midwest A and Midwest Main are described below.
The Midwest A block model consists of two main mineralized domains, Low Grade and High Grade zones constructed using a 0.05% U cut-off with minimum thickness of two metres and 10.0% U cut-off with minimum thickness of one metre, respectively. A perched zone was identified, but was not considered for resource estimation. The Midwest A deposit consists of data from 113 boreholes of which 69 boreholes intersect the mineralization itself.
2020 Annual Information Form 97
Grades are comprised of 64% eU data, derived from a calibrated downhole gamma probe, and 36% chemical assay data. Sample data were composited to one metre length. An accumulation-like approach was used, wherein GxD (where grade is in percent uranium) and density were estimated into a three-dimensional block model, constrained by wireframes in two passes using ordinary kriging. The grade was then calculated into each block by dividing the estimated GxD by the estimated density. A block size of 5 by 5 by 2 metres was selected. Search radii were based on variogram analyses with a relatively flat ellipsoid used aligned roughly to the unconformity surface.
Grade capping was not performed, however, the treatment of high grades was considered during estimation by limiting the influence of GxD composites greater than 20 and density composites greater than 3, to a neighbourhood of 7.5 cubic metres within the low-grade zone. Classification is based on drillhole spacing, with blocks classified as Indicated only found in the sandstone and upper basement portion of the Low Grade zone with drillhole space of 30 metres or less. The lower basement and all other sandstone blocks are classified as inferred mineral resources.
The Midwest Main block model considered three main mineralized domains: one Unconformity, 19 Perched and a one Basement zone constructed using a 0.05% U cut-off with minimum thickness of two metres. The Midwest Main deposit consists of data from 305 boreholes that intersected the mineralization, with new downhole gamma probe eU data for unsampled locations or in areas of poor core recovery (less than 75% core recovery). Grades are comprised of 16% eU data, derived from a calibrated downhole gamma probe, and 84% chemical assay data.Sample data were composited to one metre length.
Similar to Midwest A, two attributes, density and GxD, were calculated into each block using ordinary kriging, and the uranium grade was then calculated by dividing the estimated GxD by the estimated density. A block size of 5 by 5 by 2 metres was selected. Search radii were based on variogram analyses with a relatively flat ellipsoid used aligned roughly to the unconformity surface. Capping was not performed, however, higher grade composites were limited to a 5-cubic-metre neighbourhood of influence. This was applied to all zones, with high grade thresholds varying by zone. Classification is based on estimation passes, with blocks classified as Indicated only in the Unconformity zone and in regions of tight borehole spacing up to a nominal spacing of 17.5 metres. All other blocks are classified as inferred mineral resources.
Development and Production
In early 2007, Orano Canada completed an internal study evaluating the feasibility of mining the Midwest Main deposit via open pit mining methods and processing the resulting ore at the McClean Lake mill. In November 2007, the Midwest Joint Venture partners made a formal production decision to proceed with the development of the Midwest Main deposit. Subsequently, in November 2008, the Midwest Joint Venture partners announced that the development of the Midwest Main project would be delayed for an indefinite period due to delays and uncertainties associated with the regulatory approval process, increasing capital and operating cost estimates and the depressed state of the uranium market at the time. At this time, no development or production work is planned.
Despite this decision, the Midwest Joint Venture partners advanced the environmental assessment process and, after several years of work, the final version of the Midwest Project Environmental Impact Statement ('EIS') was submitted to provincial and federal governments in September 2011. A Comprehensive Study Report was drafted by the CNSC and circulated for federal, provincial and aboriginal review, and in September 2012, the Midwest EIS was approved.
2020 Annual Information Form 98
Other Properties, Athabasca Basin, Saskatchewan
Denison's other Athabasca projects range in exploration maturity and present numerous exploration opportunities. Denison continuously reviews its significant land package with a view to generate new exploration targets or other value for the Company.
During the winter of 2020, geophysical surveys were carried out at Murphy Lake, Moon Lake, Moon Lake North and Moon Lake South.
Results from the 2020 programs at Denison's highest priority non-material properties are discussed below. For Sampling, Analysis and Data Verification Procedures with respect thereto, see 'Athabasca Exploration: Sampling, Analysis and Data Verification'.
Moon Lake
The Moon Lake project is a joint venture between Denison (60.10%) and Uranium One Inc. (39.9%). Denison acts as operator on behalf of the JV. The property consists of two contiguous claims totalling 4,309 hectares. Five holes have been drilled on the property to date, testing interpreted northeast-trending conductors associated with magnetic lows in the central portion of the property. Each of these holes intersected granitic gneiss or granite immediately below the unconformity, with no significant structure/hydrothermal alteration. The Moon Lake project has not been explored since Denison completed a two-hole drilling program in 2013.
In 2020, a stepwise moving loop EM (SWML) survey, designed to identify potential conductive stratigraphy underlying the claims' western boundary, was completed on the Moon Lake project. In total, 7.20 line-kilometres of loop line preparation work and 55.20 line-kilometres of step loop transient electromagnetic survey coverage were completed. The results of the survey clearly identify the edges of a strong conductive response associated with the conductive corridor that hosts Cameco's Millennium deposit, located approximately 800 metres to the west of the Moon Lake project boundary. The strength of that conductive response fades to the east as it crosses onto the Moon Lake project lands.
Moon Lake North
The Moon Lake North project is wholly-owned and operated by Denison. The property comprises ten contiguous mineral claims totalling 1,068 hectares. Although exploration work has been conducted on and around the current project lands since the late 1960's, no drilling has been completed on the Moon Lake North project lands to date.
The 2020 Moon Lake North geophysics program was completed as part of the combined 2020 Moon Lake South/North Geophysics program and designed to examine the northeastern extension of the CR-3 conductor, which hosts mineralization to the southwest on the Moon Lake South project and on the Crawford Lake project. A total of 25.2 kilometres of stepwise moving loop electromagnetic survey on one survey line was completed on Moon Lake North.
The 2020 survey successfully identified anomalous conductivity. The results suggest that the CR-3 conductor potentially extends further into the Moon Lake North project grounds than what was previously interpreted. A drill program to test this interpretation is currently planned for 2021.
Moon Lake South
The Moon Lake South Property is 75%-owned, and operated, by Denison, with the remaining 25% owned by Canalaska Uranium Ltd.
2020 Annual Information Form 99
The property consists of one claim for 2,716 hectares. The 2020 Moon Lake South geophysics program was completed as part of the combined 2020 Moon Lake South/North Geophysics program. The 2020 survey identified some high-priority anomalies, for which a 2021 drill program is currently planned to test these results.
Murphy Lake
The Murphy Lake project is wholly-owned and operated by Denison, and consists of 8 mineral claims totalling 8,686 hectares. The project is divided into two non-contiguous claim blocks: the north block and the south block. The north block is of particular interest as it borders ISO Energy's Laroque East property, which hosts the Hurricane zone.
During winter 2020, Denison carried out a ground geophysics program on the north block of the Murphy Lake property to further refine and resolve an east-west conductive trend which was identified in 2013. Two discrete conductive trends were identified over a combined strike length of approximately 9 kilometres, interpreted to represent graphitic basement structures. There has been no drilling done in the immediate survey area to date, and, as such, these conductive trends present high-priority targets for future drill programs.
Ford Lake
The Ford Lake project is wholly-owned and operated by Denison, and consists of 9,649 hectares in five dispositions. The project is located approximately 40 kilometres southwest of the high-grade Phoenix deposit. The current project lands were established by Denison in 2004, although exploration on the property has only been carried out sporadically since the 1970's. The bulk of the historic exploration work was completed on claims S-107133 and S-107134, where a complex, multiple conductor trend has been tested by approximately 60 holes, several of which intersected sub-economic mineralization.
A step-wise moving-loop EM survey is planned for 2021, with the intention to identify, for future drill programs, any conductive basement lithologies or structural zones for exploration that were not resolved by historical surveys.
South Dufferin
The South Dufferin project is wholly-owned and operated by Denison and consists of 9 mineral claims totalling 12,283 hectares. The project lands are located just outside the Athabasca Basin's southern margin, along the Virgin River Shear Zone, which hosts Cameco's high-grade, unconformity-hosted Centennial deposit.
In August of 2020, Denison conducted a soil sampling program, of approximately 3,000 samples collected and analyzed. Four areas of interest containing anomalous concentrations of uranium pathfinder elements were identified from the soil survey results, and additional testing may be undertaken to try and develop future drilling targets.
2020 Annual Information Form 100
Other Denison Athabasca Projects
Denison's other Athabasca projects range in exploration maturity and present numerous exploration opportunities. Denison continuously reviews its significant land package with a view to generating new exploration targets or creating spin-out opportunities. The table below provides a list of Denison's Athabasca projects as at December 31, 2020.
Projects
Denison
Ownership
JV Partner
# Claims
Hectares
Bachman Lake
100%
5
11,419
Bell Lake
100%
3
7,767
Brown Lake
100%
3
1,755
Candle Lake
45.08%
Uranium One Inc.; JCU
1
2,595
Crawford Lake
100%
5
11,800
Darby
60.10%
Uranium One Inc.
9
15,392
Epp Lake
100%
2
865
Ford Lake
100%
5
9,649
Hatchet Lake
70.15%
Eros Resources Corp.
9
10,212
Hook-Carter
80%
ALX Resources Corp.
8
24,691
Johnston Lake
100%
6
17,265
Lynx Lake
60.10%
Uranium One Inc.
1
1,274
Mann Lake
30%
Cameco; Orano Canada
2
3,407
Marten
100%
2
5,008
Moon Lake
60.10%
Uranium One Inc.
2
4,309
Moon Lake North
100%
10
1,068
Moon Lake South
75%
CanAlaska Uranium Ltd.
1
2,716
Murphy Lake
100%
8
8,686
Packrat
100%
1
1,621
Park Creek
49%
Cameco
8
7,798
Russell Lake
37.82%
Cameco; Mr. W.P. Boyko
1
355
South Dufferin
100%
9
12,283
Torwalt Lake
100%
1
812
Turkey Lake
100%
1
3,789
Waterfound
12.32%
Orano Canada; JCU
25
11,670
Waterfound North
60.10%
Uranium One Inc.
4
4,124
Wolly
21.89%
Orano Canada; JCU
17
23,700
Wolverine
100%
3
5,036
2020 Annual Information Form 101
ATHABASCA EXPLORATION: SAMPLING, ANALYSIS AND DATA VERIFICATION
Unless otherwise specifically disclosed herein, the following describes the procedures and protocols for all Athabasca exploration programs operated by Denison in reference to drill hole surveying, downhole radiometric surveying, core logging, core sampling, sample preparation methods, analytical procedures, Quality Assurance and Quality Control ('QAQC') and data verification. For Sampling, Analysis and Data Verification procedures employed by other operators, past or present, on projects in which Denison holds an ownership interest, refer to those project sections within the AIF, specifically for McClean Lake, Midwest and Waterbury Lake.
Drill Hole Surveying
Drill collars are typically sited and surveyed in the field using a Differential Global Positioning System ('DGPS') to determine accurate coordinates and elevation. The drill rig azimuth and dip are aligned using a field compass (set to the appropriate magnetic declination) or a rig alignment tool. The trajectory of all drill holes is determined with a Reflex survey instrument in single point mode, which measures the dip and azimuth of the drill hole. Measurements are collected at approximately 50 metre intervals down the hole.
Downhole Radiometric Probe Surveying
When possible, all drill holes are surveyed immediately after drilling with a downhole radiometric probe to measure natural gamma radiation. Each survey consists of either a HPL2375 single sodium iodide (NaI) scintillation crystal tool or a 2GHF-1000 triple gamma (one sodium iodide crystal and two ZP1320 high flux Geiger-Mueller (GM) tubes) tool attached to a MX-Series winch with a MGX data recorder connected to a portable computer.
Downhole logging measurements are completed within the drill rods for both down and up survey runs using MSLog software provided by Mt Sopris. Logging speeds are maintained at approximately 10 metres/minute. Individual data recordings are stored separately for each run on a portable laptop computer.
Total count measurements from each survey are converted to radiometric equivalent grade U3O8 % ('eU3O8') values using conversion coefficients derived from calibration facilities at the SRC test pits located in Saskatoon, Saskatchewan. The calibration facilities allow for regular checks on both probes and probing equipment and to monitor or identify maintenance issues before field operations begin. The site consists of four mineralized holes, with isolated uranium concentrations of 1.4, 1.6, 1.6 and 0.21 metres wide with U grades varying from 0.063, 0.29, 1.25 and 4.07%, respectively. Individual probes are calibrated using the NaI crystal measurements a minimum of two times per year, normally before and after the winter and summer field seasons. Survey results are also corrected for attenuation of signal in water and for the thickness of steel pipe in the hole. GM tubes are checked for drift at the site; however, calibration factors for these probes were derived separately using direct comparisons of total count values with assay core results as high as 80% U3O8. The 'in-situ' nature of this calibration procedure allows for a wider spectrum of predicted results than using the SRC calibration facilities.
The Company typically reports eU3O8, derived from a calibrated downhole total gamma probe, as preliminary during its exploration programs and subsequently reports definitive assay grades following sampling and chemical analysis of the mineralized drill core.
2020 Annual Information Form 102
Core Logging
Denison employs suitably qualified persons to log all drill core in detail at dedicated, custom-built core logging facilities proximal to drilling operations. Routine logs completed for each drill hole include lithology, sandstone texture, paleoweathering, mineralization, alteration, structure (interval and point), geotechnical and gamma (handheld scintillometer). Where deemed necessary, additional logs may be collected to assist in constraining geophysical survey results. These logs may include magnetic susceptibility or other physical property measurements. For advanced projects where mining studies may be applicable geotechnical logs are expanded and may also include point load testing. All logging data, together with collar and survey information and a drill hole summary, are uploaded to a DHLogger database with central storage on Denison's server at the Saskatoon office. In addition, the drill core is photographed, both wet and dry, before it is stored at project sites either in racks or as cross-stacks. Drill core handling and sampling protocols are in accordance with industry best practices.
Core Sampling, Sample Preparation and Assaying
Assay Samples
Denison submits drill core samples for chemical U3O8 assay for all mineralized intervals, where core recovery permits. Mineralized intervals are identified by handheld scintillometer and confirmed by downhole gamma probe logs. All mineralized core is broken into approximately 10 centimetre pieces and measured with a handheld scintillometer (RS-120 or RS-125) by removing each piece of drill core from the ambient background, noting the most pertinent reproducible result in counts per second ('cps'), and carefully returning it to its correct place in the core box. Any core registering over 500 cps is marked for sampling, typically over 50 centimetre intervals. A threshold of 300 cps has been used at Wheeler River's Gryphon deposit since the beginning of 2017. Additional non-mineralized 'shoulder' samples are marked over 50 centimetre intervals to flank both ends of the mineralized intervals. In areas of strong mineralization, more than one sample on either end is sometimes required. All core samples are split in half with a hand splitter according to the sample intervals marked on the core. One-half of the core is returned to the core box for future reference, and the other half is tagged and sealed in a plastic bag. Bags of mineralized samples are sealed for shipping in metal or plastic pails depending on the radioactivity level.
Because the mineralized drill cores are classified as hazardous materials and are regulated under requirements governing the transport of dangerous goods, Denison staff have been trained in the proper handling and transport of the cores and deliver them from the core facility directly to the laboratory without outside contact.
All drill core U3O8 assays are conducted by the SRC Lab.The assay sample preparation and analytical procedures are as follows:
Drill core samples are received by the analytical laboratory from Denison in sealed five-gallon plastic or metal pails. Each sample is contained in a sealed plastic bag with a sample tag. A packing slip is enclosed that contains instructions and a sample number list. Samples are verified against the packing slip. Any extra samples or missing samples are noted and Denison is informed.
Samples are sorted and processed according to lithology (sandstone or basement) and level of radioactivity.
Sample preparation includes drying, jaw crushing to 60% passing -2 millimetres and pulverizing to 90% passing -106 microns.
2020 Annual Information Form 103
The resultant pulp is split and digested using a two-acid partial digest (HNO3:HCl) and a three-acid 'total' digest (HF: HNO3:HClO4) and the respective solutions analyzed for multi-elements, including uranium, using ICP-OES (SRC Lab analytical method ICP1). Boron values are obtained through NaO2/NaCO3 fusion followed by ICP-OES.
When uranium partial values, as obtained above, are ≥1,000 ppm, sample pulps are re-assayed for U3O8 using SRC Lab's ISO/IEC 17025:2005 accredited method for the determination of U3O8 wt%. A split of the sample pulp is digested using aqua-regia (HCl:HNO3 in the ratio 3:1), and the solution analyzed for U3O8 wt% using ICP-OES.F
Bulk Dry Density Sampling
Samples are routinely collected from mineralized intersections for bulk dry density determination as required for mineral resource estimation. Density samples are typically collected at a frequency of one density sample per 10 assay samples (i.e. 1 sample for every 5 metre interval), also ensuring the density samples are representative of the uranium grade range and the different domains of the deposit. The density samples comprise half-split core over 10 centimeter intervals, and for each sample, the depth, rock type and gamma scinitllometer reading is recorded. Density samples are sent to the SRC Lab for analysis, along with the mineralized core samples for assay. At the SRC Lab, the density samples are first weighed as received and then submerged in de-ionized water and re-weighed. The samples are then dried until a constant weight is obtained. The sample is then coated with an impermeable layer of wax and weighed again while submersed in de-ionized water. Weights are entered into a database and the bulk density of each sample is calculated. Water temperature at the time of weighing was also recorded and used in the bulk density calculation. Following bulk density determination, the samples are sent for uranium assay using SRC Lab's ISO/IEC 17025:2005 accredited method for the determination of U3O8 wt% in order to ensure a direct correlation can be made between density and assay values.
Exploration Samples
Three other types of drill core samples are collected during routine exploration, the results of which are used to prioritize drill holes for follow-up exploration or determine geochemical and/or alteration vectors toward mineralization, as follows:
1.
Composite geochemical samples are collected over approximately 10 metre intervals in the upper Athabasca sandstone and in fresh lithologies beneath the unconformity (basement) and over 5 metre intervals in the basal sandstone and altered basement units. The samples consist of 1 centimetre to 2 centimetres disks of core collected at the top or bottom of each row of core in the box over the specified interval. Care is taken not to cross lithological contacts or stratigraphic boundaries. These samples are submitted to the SRC Lab for sample preparation and multi-element analysis. The same sample preparation procedures are used as described above for U3O8 assay samples. The pulps are analyzed using the ICPMS Exploration Package which includes a total digest (HF:HNO3:HCIO4) and partial digest (HNO3:HCl) followed by ICP-MS analysis. Boron values are obtained through NaO2/NaCO3 fusion followed by ICP-OES.
2.
Representative/systematic core disks (one to five centimetres in width) are collected at regular 5 metre to 10 metre intervals throughout the entire length of core until basement lithologies become unaltered. These samples are analyzed for clay minerals using reflectance spectroscopy. Samples for reflectance clay analyses are analyzed by Denison using an ArcSpectro FT-NIR ROCKET spectrometer and sent to AusSpec International Ltd. (AusSpec) for interpretation.
2020 Annual Information Form 104
3.
Select spot samples are collected from significant geological features (i.e. radiometric anomalies, structure, alteration etc.). Core disks 1 to 2 centimetres thick are collected for reflectance spectroscopy and split core samples are collected for geochemical analysis. The same reflectance spectrometry or geochemical procedures as described above are used.
These sampling types and approaches are typical of uranium exploration and definition drilling programs in the Athabasca Basin.
Data Handling
After the analyses are completed, analytical data are securely sent using electronic transmission of the results, by the SRC Lab to Denison. The electronic results are secured using WINZIP encryption and password protection. These results are provided as a series of Adobe PDF files containing the official analytical results ('assay certificates') and a Microsoft Excel spreadsheet file containing only the analytical results. Analytical data received from the lab is imported directly into Denison's DH Logger database. The data is subject to validation using triggers built into the database to identify blank or standard assays that fall outside the accepted limits that require re-analysis. Field duplicates are validated using control charts. The laboratory is notified immediately of any problematic samples or batches and these are re-analyzed. The lab reports assay values that fall below the method detection limit (MDL) as 'less than' values (<_mdl29_. these='' values='' are='' automatically='' replaced='' with='' a='' value='' of='' half='' the='' mdl='' by='' database='' during='' import.='' is='' backed='' up='' on-='' and='' off-site='' every=''>
QAQC
The SRC Lab has an internal QAQC program dedicated to the active evaluation and continual improvement in the internal quality management system. The laboratory is accredited by the Standards Council of Canada as an ISO/IEC 17025 Laboratory for Mineral Analysis Testing and is also accredited ISO/IEC 17025:2005 for the analysis of U3O8. The laboratory is licensed by the Canadian Nuclear Safety Commission (CNSC) for possession, transfer, import, export, use, and storage of designated nuclear substances by CNSC Licence Number 01784-1-09.3. As such, the laboratory is closely monitored and inspected by the CNSC for compliance. All analyses are conducted by the SRC Lab, which has specialized in the field of uranium research and analysis for over 30 years. The SRC Lab is an independent laboratory, and no associate, employee, officer, or director of Denison is, or ever has been, involved in any aspect of sample preparation or analysis on samples. The SRC Lab uses a Laboratory Management System (LMS) for Quality Assurance. The LMS operates in accordance with ISO/IEC 17025:2005 (CAN-P-4E) 'General Requirements for the Competence of Mineral Testing and Calibration Laboratories' and is also compliant with CAN-P-1579 'Guidelines for Mineral Analysis Testing Laboratories'. The laboratory continues to participate in proficiency testing programs organized by CANMET (CCRMP/PTP-MAL).
The SRC Lab routinely inserts standard reference materials and blanks into batches of the Company's samples as an internal check on accuracy and contamination. Quality control samples (reference materials, blanks, and duplicates) are included with each analytical run, based on the rack sizes associated with the method. Before the results leave the laboratory, the standards, blanks, and split replicates are checked for accuracy and issued, provided the senior scientist is fully satisfied. If for any reason, there is a failure in an analysis, the sub-group affected will be re-analyzed and checked again. A Corrective Action Report will be issued, and the problem is investigated fully to ensure that any measures to prevent the re-occurrence can and will be taken. All human and analytical errors are, where possible, eliminated. If the laboratory suspects any bias, the samples are re-analyzed, and corrective measures are taken.
2020 Annual Information Form 105
Denison has developed several QAQC procedures and protocols for all exploration projects to independently monitor laboratory performance, which includes the analysis of uranium standards, blanks, field duplicates and exploration standards, as follows:
Uranium Standards- Due to the radioactive nature of the standard material, insertion of the standard materials is preferable at the SRC Lab instead of in the field. During sample processing, the appropriate standard grade is determined, and an aliquot of the appropriate standard is inserted into the analytical stream for each batch of materials assayed. Uranium standards are typically inserted at a minimum rate of 1 in every 40 samples. For the Wheeler River project up until the end of 2018, Denison used standards provided by Joint Venture partner Cameco for uranium assays. Six Cameco uranium assay standards were prepared for use in monitoring the accuracy of uranium assays received from the laboratory. For Wheeler River from 2019 and onward, and for other Denison projects, a suitable matrix-matched Certified Reference Material ('CRM') is used as a standard.
Blanks- Denison employs a lithological blank composed of quartzite to monitor the potential for contamination during sampling, processing, and analysis. The selected blank consists of a material that contains lower contents of U3O8than the sample material but is still above the detection limit of the analytical process. Due to the sorting of the samples submitted for assay by the SRC Lab based on radioactivity, the blanks employed must be inserted by the SRC Lab after this sorting takes place in order to ensure that these materials are ubiquitous throughout the range of analytical grades. In effect, if the individual geologists were to submit these samples anonymously, they would invariably be relegated to the minimum radioactive grade level, preventing their inclusion in the higher radioactive grade analyses performed by the SRC Lab. Blanks are typically inserted at a minimum rate of 1 in every 40 samples. For the Wheeler River project up until the end of 2018, Denison used blanks provided by Joint Venture partner Cameco. For Wheeler River from 2019 and onward, and for other Denison projects, another suitable blank material is used, as provided by the SRC Lab.
Field Duplicates- The Company inserts duplicate samples in the sample stream as a check on the precision of the SRC Lab. Core duplicates are prepared by collecting a second sample of the same interval, through splitting the original sample, or other similar technique, and are submitted as an independent sample. Duplicates are typically submitted at a minimum rate of one per 25 samples. The collection may be further tailored to reflect field variation in specific rock types or horizons.
Exploration Standards- Denison has prepared three in-house 'exploration standards' to independently monitor laboratory performance during the processing of routine drill core exploration samples. These standards aim to test laboratory accuracy and precision for a variety of trace metals at low levels, as required for Athabasca uranium exploration.
Assay Checks- In addition to the QAQC described above, up until the end of 2018, Denison sent one in every 25 U3O8assay samples to the SRC Lab's Delayed Neutron Counting (DNC) laboratory, a separate umpire facility located at the SRC Lab in Saskatoon, to compare the uranium values using two different methods, by two separate laboratories. All radioactive samples are monitored and recorded as per CNSC licence 01784-1-09.0. Decommissioning of the SRC Lab's DNC facility is planned for early 2019. The SRC Labe is planning to have an X-ray fluorescence ('XRF') lab running in the spring of 2019 for umpire analyses, which will operate on a similar independent basis as the DNC facility. Furthermore, downhole radiometric probe results provide equivalent uranium data (eU3O8) that is used internally by the Company for comparisons with the SRC Lab U3O8results.
2020 Annual Information Form 106
Data Verification
Denison engages with independent consultants for estimation of mineral resources on its mineral properties, in accordance with CIM Standards and NI 43-101, as well as other studies, including the PFS and ISR field testing and engineering studies. In this regard, the independent consultants undertake rigorous data verification, including, but not limited to, Denison's field procedures, databases and assay results.
Prior to public disclosure of drilling results, including preliminary radiometric equivalent grades ('eU3O8') and chemical assay grades ('U3O8'), the results are subject to data verification by Qualified Persons employed by Denison. This includes checks of 10 to 20% of the results (typically as composited intervals) against non-composited eU3O8determinations and laboratory assay certificates.
DENISON'S OPERATIONS
McClean Lake Mill
The MLJV owns a state of the art uranium processing facility located on the eastern edge of the Athabasca Basin in northern Saskatchewan, approximately 750 kilometres north of Saskatoon. Orano Canada is the operator/manager of the facility.
The McClean Lake mill is specially designed and constructed to process high grade uranium ores in a safe and environmentally responsible manner. The mill uses sulphuric acid and hydrogen peroxide leaching and a solvent extraction recovery process to extract and recover the uranium product from the ore. In addition to the mill facility, other infrastructure on the site includes a sulphuric acid plant, a ferric sulphate plant, an oxygen plant, an electricity transmission line tied into the provincial power grid, a 14 megawatt back-up diesel power plant, warehouses, shops, offices and living accommodations for site personnel.
In 2016, an expansion of the mill was completed and an increase to the licensed capacity of the mill was approved - resulting in an increase to the licensed production capacity of the mill to 24 million pounds U3O8 per year. This increased licensed capacity allowed for the processing of 100% of ore production from the Cigar Lake mine, expected to be 18 million pounds U3O8 per year, and provides the flexibility for the mill to process ore from other sources in the future.
Operations
The McClean Lake mill began production of uranium concentrates in 1999, with the first ore fed to the mill on June 22, 1999 and commercial production achieved on November 1, 1999. The mill operated until the end of June 2010, producing approximately 50 million pounds U3O8, when it was placed on stand-by due to a lack of ore. In 2014, the McClean Lake mill re-commenced operations with the delivery of ore shipments from the Cigar Lake Mine, owned by the CLJV and operated by Cameco. In 2014, the mill processed over 456,800 pounds of U3O8 with a 97.5% recovery rate. Mill feed consisted of a blend of Cigar Lake ores and stockpiled Sue B and McClean Lake North ores (mined via SABRE). In 2015, production ramped up and the mill produced approximately 11.3 million pounds of U3O8 with a 98.9% recovery rate.
In 2016, the mill produced 17.3 million pounds of U3O8 with a 99% recovery, and mill feed was all Cigar Lake ore. From 2017 to 2019, the mill has produced just over 18.0 million pounds of U3O8 per year, processing 100% mill feed from Cigar Lake with recoveries at approximately 99%.
2020 Annual Information Form 107
On March 23, 2020, in response to the onset of the COVID-19 pandemic, the operator of the CLJV announced a decision to suspend production at the Cigar Lake mine for a minimum of four weeks. In parallel, the operator of the MLJV announced that the McClean Lake mill would also suspend operations for the duration of the CLJV shutdown. Mine and mill operations restarted in September 2020; however, in December 2020, the CLJV announced another temporary suspension of production at the Cigar Lake mine, and the MLJV announced that the operations at the mill would again be temporarily suspended. Operations remain suspended and, at this time, the duration of the current suspension is unknown.
The table below shows the operating statistics for McClean Lake over the last five years.
McClean Lake Operations
2020
2019
2018
2017
2016
Ore Milled (thousand tonnes)
27,773
45,456
42,624
36,374
36,682
Average Grade (% U3O8)
17.19
17.89
19.19
22.78
21.39
MLJV Production (thousand pounds U3O8)
-
-
-
-
-
Denison's share MLJV Production (thousand pounds U3O8)
-
-
-
-
-
Toll Mill Production (thousand pounds U3O8)
10,069
18,012
18,018
18,015
17,333
During the fourth quarter of 2019, the McClean Lake Union Unifor Local 48-S ratified a new collective bargaining agreement. The new three-year agreement includes a new two-weeks-in two-weeks-out rotation, which was implemented in 2020.
For information pertaining to taxes and royalties, see 'Government Regulation - Saskatchewan Royalties' and 'Government Regulation - Canadian Income and Other Taxes.'
Mill Licence
The McClean Lake site is operated under various permits, licences, leases and claims granted and renewed from time to time, all of which are currently in good standing. Several key regulatory achievements were completed in 2017 for McClean Lake: (a) the issuance by the CNSC of a 10 year license for operation of both McClean and Midwest projects; (b) the receipt of renewal of provincial approvals to operate for a 6 year term, expiring on October 31, 2023; and (c) CNSC approval to expand the existing tailings facility up to an elevation of 448 metres above sea level ('m ASL'). Historically CNSC issued Mine Operating Licences were granted for a 5 year term, but in 2009 the McClean Lake operations received an 8 year term and in 2017 was granted a further 10 year term: UMOL-MINEMILL-McLEAN.00/2017 (the 'Mine Operating License') which is valid for the period July 1, 2017 to June 30, 2027. In addition to renewal of all previously licensed activities, the current licence authorizes mining of the McClean North deposits using hydraulic borehole mining methods (SABRE) and includes the care and maintenance activities at the Midwest site.
Tailings Disposal
The disposal of mill tailings in an environmentally acceptable manner has led to advances in the design and construction of new tailings management facilities. In the McClean tailings management facility ('TMF'), tailings are deposited sub-aqueously from a barge. This procedure minimizes tailings segregation, reduces concerns of freezing and dust generation, and controls radiation and radon emissions from the pond. This facility has been designed to receive tailings from processing high grade Midwest and Cigar Lake ores in addition to tailings from the McClean Lake deposits.
2020 Annual Information Form 108
Under the regulatory approved 'TMF Optimization' project, the tailings capacity of the TMF was increased in two stages during the period 2013 to 2018. The TMF Optimization project involved the sloping of the TMF walls and the placement of a bentonite liner to increase the TMF capacity up to an elevation of 443 m ASL.
A second project, called 'TMF Expansion', entails adding additional tailings capacity over and above that created through the TMF Optimization project. The first phase of the project entails increasing the consolidated tailings elevation of the TMF up to 448 m ASL. On April 19, 2017, the MLJV received regulatory approvals for the TMF Expansion project. Following such receipt, construction activities were initiated in 2018 with re-sloping of the pit walls, installation of a new tailings pipe bench, decommissioning of 12 dewatering wells and the relocation of the contaminated landfill from the TMF to the Sue C site.
In 2019, phase one construction activities continued and work on placing additional bentonite liner commenced. By the end of September 2019, the first phase of the TMF Expansion was completed with the bentonite liner reaching a level of ~447.4 m ASL. The regulatory costs associated with the TMF Expansion Phase 1 work was funded by the MLJV while the CLJV funded predominantly all of the construction costs.
In 2020, the focus of the TMF Expansion was to advance regulatory work necessary for the permitting associated with the TMF Expansion Project Phase 2, which envisions raising the TMF capacity to 468 m ASL, and to complete design work on the required infrastructure. The regulatory process has been delayed due to the impact of the COVID-19 pandemic; however, the regulatory engagement and review process is ongoing.
Plans for 2021 include completing the regulatory work required to obtain permitting to increase the TMF capacity to 468 m ASL.
Cigar Lake Toll Milling
In 2002, Denison and its partners entered into an agreement with the CLJV to process Cigar Lake ore at the McClean Lake mill. Pursuant to that agreement, all Cigar Lake ore was to be leached at the McClean Lake mill with the pregnant aqueous solution being divided between the McClean Lake and Rabbit Lake facilities for processing into uranium concentrates. In order to process this Cigar Lake ore, an expansion of the McClean Lake mill was required. The expansion and modifications of the McClean Lake mill to raise its capacity to 13.0 million pounds U3O8 were completed in 2008 and all costs were paid for by the CLJV.
As a result of delays in the startup of the Cigar Lake mine and the exhaustion of permitted ore deposits at McClean Lake, the McClean Lake mill was placed on stand-by at the end of June of 2010. Under the Cigar Lake toll milling agreement, the CLJV funded a considerable portion of the McClean Lake stand-by costs, with the relative proportion of the stand-by costs paid by each party calculated on the basis of the percentage of mineral reserves between the McClean Lake and Cigar Lake joint ventures.
In 2011, the CLJV and the MLJV agreed to amend the toll milling agreement. Under the new milling arrangement, the McClean Lake operation is to process and package 100% of the uranium produced from the Cigar Lake mine. To accommodate the annual production of 18.0 million pounds U3O8 from the CLJV, the mill has been further expanded to an annual licensed capacity of 24.0 million pounds U3O8. All costs for the expansion of the McClean Lake mill and a portion of the TMF Optimization and TMF Expansion were paid or will be paid for by the CLJV (see 'Denison's Operations - McClean Lake - Tailings Disposal').
2020 Annual Information Form 109
As noted above, due to the onset of the COVID-19 pandemic, both the Cigar Lake mine and McClean Lake mill were temporarily shutdown in late March 2020. The mine and the mill both reopened in September 2020, but were shutdown again in late December 2020 due to the continued impact of the pandemic. At this time, the duration of the current shutdown is unknown.
Cigar Lake Toll Milling - APG Transaction
Pursuant to the APG Transaction in February 2017, certain of Denison's interests in the Cigar Lake toll milling proceeds have been sold to APG and its subsidiary Centaurus Royalties Ltd. ('Centaurus') for aggregate gross proceeds to Denison of $43,500,000. The APG Transaction is comprised of the following elements: (1) a 13 year limited recourse lending arrangement involving a loan from APG to 9373721 Canada Inc. ('SPV') (the 'APG Loan') and a further loan from SPV to DMI (the 'SPV Loan') each for $40,800,000 (collectively, the 'Lending Arrangement'); and (2) $2,700,000 in proceeds from the sale, to Centaurus, of a stream equal to Denison's 22.5% share of proceeds from the toll milling of Cigar Lake ore by the McClean Lake mill for specified Cigar Lake toll milling throughput in excess of 215 million pounds U3O8 after July 1, 2016 (the 'Stream Arrangement').
Additional details of the APG Transaction are as follows:
No Warranty of the Future Rate of Production - No warranty is provided by Denison (including DMI and SPV) to APG (including Centaurus), under the terms of the Lending Arrangement or the Stream Arrangement, regarding: the future rate of production at the Cigar Lake mine and / or the McClean Lake mill; or the amount or collectability of proceeds to be received by the MLJV in respect of toll milling of Cigar Lake ore.
APG Loan Details - The APG Loan will accrue interest at a rate of 10% per annum and does not have a predetermined principal repayment schedule. The APG Loan is secured by a first priority interest in the assets of SPV which will essentially consist of the SPV Loan to DMI.
SPV Loan Details - The SPV Loan will accrue interest at a rate of approximately 10% per annum and does not have a predetermined principal repayment schedule. The SPV Loan is limited in its recourse against DMI such that it is generally repayable only to the extent of Denison's share of the toll milling revenues earned by the MLJV from the processing of the first 215 million pounds of U3O8 from Cigar Lake ore on or after July 1, 2016. Denison will guarantee the limited recourse loan repayments and will grant a second ranking pledge of its share of DMI to secure performance by DMI of its obligations to pay the SPV Loan. The share pledge is second ranking to Denison's existing pledge of its shares of DMI to the Bank of Nova Scotia ('BNS') under the terms of its Letters of Credit Facility.
As discussed above, the McClean Lake mill has temporarily suspended operations in connection with the COVID-19 pandemic. As a result of the APG Transaction, Denison has sold the toll milling revenue to be earned from the processing of the Cigar Lake ore and the suspension has no economic impact on Denison due to the limited recourse nature of the SPV Loan. The suspension has resulted in a non-cash decrease in revenue recognized by Denison, limited to a reduction in the drawdown of the Company's deferred revenue balance.
Surface Access Borehole Resource Extraction (SABRE) Mining Program
The SABRE program is focused on developing a viable alternate mining method combining surface drilling and borehole mining technology. Benefits of the method may include a reduced time to production, reduced or deferred capital costs, as well as minimized safety and environmental risks.
2020 Annual Information Form 110
Hydraulic borehole mining is a technique used to extract materials through a small access borehole, typically less than one-half of a metre in diameter, resulting in a very small disturbance to the surface. A mining tool containing a high-pressure water jet nozzle is lowered through the access borehole in the overburden and sandstone to the mineralized horizon. The high-pressure water jet is used to cut or erode the mineral-bearing ore and to create a cavity up to four metres in diameter. The cuttings are transported to surface in a slurry form and sent through a series of screens and settling ponds to separate the ore from the jetting water. Jetting water is filtered further and re-used in the process. Each mined out cavity is backfilled after completion with a cemented mixture in the mineralized horizon.
Between 2007 and 2012, approximately 2,100 tonnes of ore was recovered through various SABRE test mining programs, a portion of which has been fed to the mill between 2007 and 2014. After the completion of several significant milestones in 2012 and 2013, a decision was made in late 2013 to suspend the SABRE program in 2014 in response to the low uranium price environment. In 2015, SABRE activities were limited to patent applications and upgrading down-hole sonar capabilities with the objective of improving surveying of cavity dimensions and mining performance. In 2016, an expanded program was evaluated for SABRE including the re-tooling of the program to allow for larger volumes and jetting pressures designed to increase the SABRE production rate. In addition, the purchase, installation and testing of a new solid / liquid separation system was completed to assess the improvement in recovery of small uranium particles from the production slurry created during the SABRE mining process.
In 2017 and 2018, development of the re-tooled SABRE program continued with engineering of larger diameter mining pipes, procurement of high-pressure pumps and a tendering process to contract drilling equipment and labour for a further mining test. In addition, in 2018 four access holes were drilled and cased from surface to just above the McClean North orebody elevation. At the time, it was expected that these access holes would be used in 2020 as part of planned mining tests using the re-tooled equipment. In 2019, engineering and procurement activities for the re-tooled mining equipment continued and various equipment acceptance testing activities were completed.
The SABRE mining test was originally planned for 2020, but was postponed in connection with COVID-19 pandemic related operational disruptions. As a result, the work completed in 2020 focused on further de-risking various elements of the SABRE equipment and the SABRE mining process in advance of a future mining test, now scheduled for 2021.
The plan for 2021 includes completing the four-hole test mining program planned at McClean North, using the four-access holes drilled in 2018.
MANAGER OF UPC
DMI is the manager of UPC. UPC is a public company with the primary investment objective of achieving an appreciation in the value of its uranium holdings. The Company does not, directly or indirectly, have an ownership interest in UPC. As manager, DMI provides UPC's officers and manages UPC's activities, including purchasing uranium for and on behalf of UPC as directed by the UPC board, arranging for its storage and attending to regulatory reporting for UPC.
The MSA is the current management services agreement between DMI and UPC, effective April 1, 2019 for a five year term. Under the MSA, DMI receives the following management fees from UPC: a) a base fee of $400,000 per annum, payable in equal quarterly installments; b) a variable fee equal to (i) 0.3% per annum of UPC's total assets in excess of $100 million and up to and including $500 million,
2020 Annual Information Form 111
and (i) 0.2% per annum of UPC's total assets in excess of $500 million; c) a fee, at the discretion of the UPC board, for on-going monitoring or work associated with a transaction or arrangement (other than a financing, or the acquisition of or sale of U3O8 or UF6); and d) a commission of 1.0% of the gross value of any purchases or sales of U3O8 or UF6, or gross interest fees payable to UPC in connection with any uranium loan arrangements. During 2020, DMI earned an aggregate of $2,604,000 in management fees from UPC.
The MSA may be terminated by Denison upon the provision of 180 days written notice. The MSA may be terminated by UPC (i) in the event of a material breach, (ii) within 90 days of certain events surrounding a change of both of the individuals serving as Chief Executive Officer and Chief Financial Officer of UPC, and / or a change of control of Denison, or (iii) upon the provision of 30 days written notice and, subject to certain exceptions, a cash payment to Denison of an amount equal to the base and variable management fees that would otherwise be payable to Denison (calculated based on UPC's current uranium holdings at the time of termination) for the lesser period of a) three years, or b) the remaining term of the MSA.
DENISON CLOSED MINES GROUP
Denison formed its Denison Environmental Services division ('DES') in 1997 to provide mine decommissioning and mine care and maintenance services to industry and government, as well as to manage Denison's post mine closure environmental obligations on its Elliot Lake landholdings. In late 2019, driven by a new strategic vision for Denison as a mining company with expertise across the full mining life cycle, Denison discontinued the use of the DES name. The team of closed mine care & maintenance specialists and environmental professionals previously working under DES are now part of Denison's integrated Closed Mines group, which is positioned within the organization alongside each of Denison's exploration and project development teams.
The Closed Mines group remains focused on post-closure mine care and maintenance services, and its technical team is principally located in Elliot Lake, Ontario.
The primary activities of the Closed Mines group include: the ongoing monitoring of Denison's two closed Elliot Lake mine sites, plus environmental monitoring, effluent treatment and maintenance services for other non-Denison clients, including in 2020:
Certain of Rio Algom Ltd.'s closed mine sites in Ontario and Quebec, including Elliot Lake;
Yukon Government's closed Mt. Nansen Mine in the Yukon; and
Ontario Government's closed Lockerby Mine in northern Ontario.
ENVIRONMENTAL, HEALTH, SAFETY AND SUSTAINABILITY MATTERS
The Company has an Environmental, Health, Safety & Sustainability Policy (the 'EHSS Policy') that affirms Denison's commitment to prioritize the safety of its workers, its contractors, its community and the environment as well as the principles of sustainable development. Under the EHSS Policy, the Company has committed to run its operations in compliance with applicable legislation, in a manner that minimizes the impact on our ecosystem. The EHSS Policy mandates the use of regular monitoring programs to identify risks to the environment, to the public, Indigenous Rights holders, and to Denison's employees and contractors and to ensure compliance with regulatory requirements. The EHSS Policy also sets out Denison's requirement to train its employees regarding environmental, health and safety compliance and sustainability best practices.
2020 Annual Information Form 112
The EHSS Policy requires regular reporting to the Board regarding the Company's compliance and the results of the Company's monitoring. To assist the Board with its responsibilities in overseeing environmental, health and safety matters, the Board has established the Environment, Health, Safety & Sustainability Committee (the 'EHSS Committee') which works with management to discuss matters affecting the environment, health and safety and its stakeholders and reporting and making recommendations to the Board.
COVID-19
With the onset of the COVID-19 pandemic and its impact on operations in Canada in early March 2020, Denison rapidly adjusted its operations to adapt to restrictions on the ability to conduct business 'as per usual'. Throughout the remainder of 2020, Denison staff worked from home wherever possible and adopted COVID-19 specific health and safety and related operating procedures across its business, including modified work scheduling, enhanced cleaning protocols, various physical distancing measures and special travel protocols designed by Denison for northern Saskatchewan. Where applicable, the Company's protocols incorporated feedback received from potentially impacted communities in northern Saskatchewan to minimize any health and safety risks associated with travel to and from site.
Denison continues to follow guidance from health officials and monitor the COVID-19 pandemic and its impact on operations across the various jurisdictions in which it operates. There have been no reported COVID-19 cases amongst Denison staff or immediate family.
Evaluation and Exploration
In 2020, Denison's project evaluation and exploration teams (and its contractors engaged to support those teams) had 1 modified work injury, 5 medical incidents and 2 equipment damage incidents. There was one minor reportable environmental incident in 2020; no environmental impact has been detected with routine sampling completed to-date.
Closed Mines
In 2018, the Closed Mines group celebrated having achieved over 500,000 cumulative work hours without a lost time injury, representing almost 10 years of continuous service without a lost time injury. In 2019 and 2020, the team continued its excellent safety performance and, as at December 31, 2020, the team had worked a total of 665,801 hours without a lost time injury.
Denison's Closed Mines operations hold the internationally recognized ISO 9001:2015 certification, which is a certification for Quality Management Systems. There were no issues of environmental non-compliance by the Closed Mines group in 2020.
Elliot Lake
Denison's uranium mine at Elliot Lake, Ontario, which started operations in 1957, was permanently closed upon completion of deliveries of U3O8 to Ontario Hydro in May 1992. During its 35 years of continuous operation, the facility produced 147 million pounds of U3O8 in concentrates from the milling of 70 million tons of ore. By 1998, all significant capital reclamation activities at Denison's two closed Elliot Lake mines had been completed and, for the most part, decommissioning has progressed to the long-term monitoring phase (see 'Government Regulation - Canadian Uranium Industry').
During 2020, the water treatment plants operated as planned and all environmental targets were met. Monitoring and other remediation related expenses were $807,000 for the year.
2020 Annual Information Form 113
Reclamation expenses for 2021 are budgeted to be $802,000. All expenditures are funded from the Reclamation Trust described below. It is estimated that sufficient funds are in the Reclamation Trust to meet all monitoring costs through 2026.
All activities and monitoring results are reviewed regularly by the CNSC and the Elliot Lake Joint Regulatory Group, which consists of federal and provincial regulators. Pursuant to a Reclamation Funding Agreement, effective June 30, 1994, with the Governments of Canada and Ontario, Denison has established a Reclamation Trust from which all spending on its Elliot Lake reclamation activities is funded. When the Reclamation Trust was first established in 1994, Denison was required to deposit 90% of its cash receipts after deducting permitted expenses, as defined in such agreement, into the Reclamation Trust. In 1997, the Governments of Canada and Ontario agreed to suspend the 90% funding requirement provided Denison maintained four years of cash requirements in the Reclamation Trust. Early in 1999, the Governments of Canada and Ontario agreed to further amend the Reclamation Funding Agreement, effective when Denison received an amended site decommissioning licence, which was obtained on April 22, 1999. Pursuant to that amendment, Denison is required to maintain sufficient funds in the Reclamation Trust to meet six years of cash requirements.
McClean Lake
During 2020, a total of 589,314 hours were worked by Orano Canada employees, contractors and visitors. During this time, there were 3 medical incidents, 3 modified work injuries and 2 lost time incidents. There were 5 reportable environmental incidents. The facility has maintained its internationally recognized ISO 14001:2004 and OHSAS 18001 certification.
The McClean Lake and Midwest projects are combined under a single Operating License issued by the CNSC. The combined Preliminary Closure Plan was prepared by Orano Canada and approved by the authorities in 2016, estimating the total decommissioning and reclamation costs for both projects to be $107,241,000. Financial assurances are in place for this entire amount, with Denison's share being $24,135,000. An updated Preliminary Closure Plan is required to be filed in 2021.
GOVERNMENT REGULATION
Saskatchewan Exploration and Land Tenure
In Canada, natural resource exploration and land tenure activity fall under provincial legislative jurisdiction. In Saskatchewan, the management of mineral resources and the granting of exploration and mining rights for mineral substances and their use are regulated by the Crown Minerals Act (Saskatchewan) and The Mineral Tenure Registry Regulations, 2012, that are administered by the Saskatchewan Ministry of Energy and Resources.
The right to explore for minerals in Saskatchewan is acquired under a mineral claim from the province. The initial term of a mineral claim is two years, renewable for successive one-year periods, provided the mineral claim is in good standing. To maintain a mineral claim in good standing, generally, the holder of a mineral claim must expend a prescribed amount on exploration. Excess expenditures (also known as assessment credits) can be applied to satisfy expenditure requirements for future claim years. Except for exploration purposes, a mineral claim does not grant the holder the right to mine minerals. A holder of a mineral claim in good standing has the right to convert a mineral claim into a mineral lease. Surface exploration work on a mineral claim requires additional governmental approvals.
2020 Annual Information Form 114
The right to mine minerals in Saskatchewan is acquired under a mineral lease from the province. A mineral lease is for a term of 10 years, with a right to renew for successive 10-year terms in the absence of default by the lessee. The lessee is required to spend certain amounts for work during each year of a mineral lease. A mineral lease cannot be terminated except in the event of default and for certain environmental concerns, as prescribed in The Crown Minerals Act (Saskatchewan). However, mineral leases may be amended unilaterally by the lessor by amendment to The Crown Minerals Act (Saskatchewan) or The Crown Mineral Royalty Regulations, 2013 (Saskatchewan).
Mineral rights, held through mineral claims and mineral leases, are distinct from surface rights. The surface facilities and mine workings are located on lands owned by the province of Saskatchewan. The right to use and occupy lands is acquired under a surface lease from the province of Saskatchewan. A surface lease is for a period of time, up to a maximum of 33 years, as is necessary to allow the lessee to operate its mine and plant and thereafter carry out the reclamation of the lands involved. Surface leases are also used by the province of Saskatchewan as a mechanism to achieve certain environmental and radiation protection and socio-economic objectives, and contain certain undertakings in this regard.
Environmental Assessments
The assessment of a proposed uranium project in Saskatchewan involves both a provincial and federal environmental assessment ('EA'). In Saskatchewan, the assessment of a project with joint federal and provincial jurisdiction is coordinated through established protocols in order to align with the 'one project-one assessment' model for the proponent and the public without compromising any statutory requirements of the legislation of either jurisdiction.
In the province of Saskatchewan, the Environmental Assessment Act is administered by the Ministry of Environment ('SKMOE'). The level of assessment for mining projects is dependent on the specific characteristics of each individual project. A proponent is required to conduct an environmental assessment ('EA') for a project that is considered to be a 'development' pursuant to the Saskatchewan Environmental Assessment Act and subsequently prepare and submit an environmental impact statement ('EIS') to the SKMOE for approval.
Federally, the Canadian Environmental Assessment Act, 2012 ('CEAA 2012') includes the Regulations Designating Physical Activities to clarify when a federal EA is required and which federal agency will act as the 'responsible authority' for the conduct of the EA. For uranium projects, the CNSC is designated as the 'responsible authority' under the CEAA 2012 and carries full authority to complete the screening of the proposed project and any subsequent environmental assessments.
The Government of Canada implemented a new Impact Assessment Act (the 'IAA'), to replace the CEAA 2012 on August 28, 2019. The transitional provision (section 182 of the IAA) provide that a CNSC designated project EA, which commenced under the CEAA 2012, is to be continued under the CEAA 2012. This means that the Wheeler River EA will continue the assessment process under CEAA 2012.
An EA is a planning and decision-making tool, which involves predicting potential environmental effects through each phase of the project (construction, operation, decommissioning and post-decommissioning) at the site, and within the local and regional assessment areas. Under the CEAA 2012, an EA's scope focuses on potential adverse environmental effects that are within federal jurisdiction including: (a) fish and fish habitat and other aquatic species; (b) migratory birds; (c) federal lands; (d) effects that cross provincial or international boundaries; (e) effects that impact on aboriginal peoples, such as their use of lands and resources for traditional purposes, and (f) changes to the environment that are directly linked to or necessarily incidental to any federal decisions about a project.
2020 Annual Information Form 115
Wheeler River
Project Description and Environmental Assessment
In 2019, Denison executed on its decision to advance the Wheeler River Project through the EA regulatory process following the release of the PFS. Activities completed in 2019 included the submission of two key documents to provincial and federal regulators, with respect to the proposed ISR mining operation: 1) the Saskatchewan Provincial Technical Proposal and the Federal Project Description and 2) the Terms of Reference. Acceptance of these documents was announced by both the SKMOE and the CNSC on June 1, 2019. Following a public review and comment period, final confirmation of the scope and guidelines for the Project EA was received from the CNSC on December 20, 2019. The Company identified the EA process as a key element of the Project's critical path.
Shortly after the initiation of the EA technical assessments, Denison suspended all EA related studies in connection with the onset of the global COVID-19 pandemic. Formal correspondence was sent to the Project regulatory agencies (CNSC and SKMOE) as well as the local communities and Indigenous groups to inform them of the suspension.
In 2020, Denison presented the CNSC and the SKMOE with the possible change in freeze containment design for the Project. The discussion of the freeze design was originally outlined in the Project Description and Technical Proposal as a design feature intended to protect the regional ground water through complete encapsulation of the mining chamber by means of a freeze dome. Based on the results of the 2020 freeze wall trade-off study (see 'Wheeler River - Mining Evaluation and Development Operations'), Denison identified the potential to reduce operational and environmental risks with a freeze wall. Denison, under the direction of the CNSC, updated the 2019 Federal Project Description and Provincial Technical Proposal to reflect the change, which was submitted and accepted by the regulators in December 2020.
In November 2020, Denison announced a plan to restart the EA in early 2021. In keeping with the requirements of the CNSC to post all EA related documents on the federal project registry website, a formal notification was submitted to the CNSC and the SKMOE to inform them of the recommencement of the EA.
Environmental Baseline Data Collection
Select baseline work continued throughout the 2020 field season, including ongoing monitoring of several air quality parameters groundwater quality and surface water flow. In addition, five regional sampling wells were installed at locations identified by the EA hydrogeological consultant. The wells were drilled at various depths, down gradient of the Phoenix deposit and near surface water bodies. The data collected from the wells will be used to support the EA through the development of the conceptual site model and assessment of potential effects from the ISR mine to the local ground and surface waters.
2020 Annual Information Form 116
Corporate Social Responsibility
Denison has been focused on strengthening many long-term relationships, and building new relationships, with Indigenous and non-Indigenous communities who have a strong connection to the land on which the Wheeler River Project is located. Denison supports various community initiatives and activities, as part of its focus on community investment.
The Company has conducted site tours for the Indigenous and municipal leaders for communities of interest, including two site tours in 2019. These tours have focused on introducing the community members to the site and an overview of the Company's project-related activities and offering an opportunity for collaboration regarding the advancement of the Project.
The Company was pleased to announce in June 2019 that it executed a series of MOUs, in support of the advancement of Wheeler River, with certain Indigenous communities who assert the project falls within their traditional territories and traditional land use activities are currently practiced within the local and regional area surrounding the project. These non-binding MOUs formalize the signing parties' intent to work together in the spirit of mutual respect and cooperation, in order to collectively identify practical means by which to avoid, mitigate, or otherwise address potential impacts of the project upon the exercise of Indigenous rights, Treaty rights, and other interests, and facilitate sharing in the benefits that will flow from the project.
Later in 2019, the Company saw two significant leadership and relationship changes. By elections held on October 25, 2019, a new Chief and Council were formed for the English River First nation ('ERFN'). Denison has engaged with the newly elected Chief and Council, to develop meaningful lines of communication and enhance their understanding of the Wheeler River Project.
Denison was also formally notified that the Métis Nation - Saskatchewan ('MNS') was appointed to represent a number of Métis communities that Denison had established and developed direct relationships with since 2016. Denison is now engaged with the MNS, pursuant to a new process set out by the MNS, for consultation on Denison's exploration and project development activities.
In 2020, Denison continued to keep various interested parties informed about planned field activities and changes to those plans due to the COVID-19 pandemic. Recognizing that the remote location of communities in northern Saskatchewan pose a unique risk for COVID-19 transmission and treatment, in early April, Denison provided financial support and the procurement of COVID-19 safety supplies, such as hand sanitizer and cleaning products to a number of remote communities in northern Saskatchewan to build the necessary supplies to respond to a COVID-19 outbreak.
In late April 2020, a number of Indigenous and non-Indigenous communities in the north west of Saskatchewan experienced COVID-19 outbreaks. In response, a unique collective of Indigenous and non-Indigenous leaders came together to create the Northwest Communities Incident Command Centre, focused on ensuring the communities responded to COVID-19 from a regional perspective. Denison provided financial support for this initiative, and invited other exploration companies to do the same. Additionally, Denison worked directly with the Command Centre to get input on the development of a travel protocol for travel through northern Saskatchewan that would be respectful of the deep concern for the potential transmission of COVID19 in northern Saskatchewan through activities like Denison's exploration and evaluation activities.
Denison's travel protocol was shared with the Saskatchewan Mining Association ('SMA') and has been provided as an example of best practice for other SMA members to refer to while travelling to and from remote sites.
2020 Annual Information Form 117
McClean and Midwest
Environmental matters related to the McClean Lake uranium facility and the Midwest project are regulated by the CNSC and the SKMOE. A number of other ministries and departments of the federal and Saskatchewan governments also regulate certain aspects of the operation. Prior to proceeding with development of the McClean Lake uranium facility and Midwest project, the proponents were required to submit Environmental Impact Statements for review. After completion of that review and receipt of recommendations, the federal and Saskatchewan governments issued the appropriate initial authorizations, subject to the normal licensing renewal process, for the McClean Lake uranium facility in 1995 and for Midwest in 2012.
Licensing and Permitting
The federal government recognizes that the uranium industry has special importance in relation to the national interest and therefore regulates the mining, extraction, use and export of uranium under the Nuclear Safety and Control Act ('NSCA'). The NSCA is administered by the CNSC which issues licences pursuant to the regulations under the NSCA.
In the event EA approvals by both the provincial and federal governments are granted, a project will be allowed to proceed to the second tier of approvals for licenses. The federal (CNSC) licensing process requires the submission of detailed engineering design packages as well as detailed management plans for all facets of the operation as part of their licensing process. The federal licenses are typically the license (i) to prepare a site and construct, (ii) operate, (iii) decommission, and (iv) abandon. Under provincial jurisdiction, a number of permits and approvals are required prior to construction. Key requirements include the execution of a Surface Lease Agreement with the Province of Saskatchewan and an Approval to Construct and Operate a Pollutant Control Facility as regulated under the Saskatchewan Environmental Management and Protection Act (2010).
Activities at McClean Lake and Midwest are currently carried out under a single operating license issued by the CNSC and are subject to all applicable federal statutes and regulations and to all laws of general application in Saskatchewan, except to the extent that such laws conflict with the terms and conditions of the licences or applicable federal laws.
Decommissioning activities at Elliot Lake are currently carried out under two decommissioning licences issued by the CNSC: for the Stanrock tailings area and the Denison mine site and tailings areas. Decommissioning of the facilities pursuant to the terms of the decommissioning licences has been completed. The CNSC has initiated the actions to combine the Stanrock and Denison sites under one Waste Facility Operating Licence. There are no significant differences between the different forms of licences. After a lengthy period of care, maintenance and monitoring, Denison may apply to the CNSC for permission to abandon the sites.
Saskatchewan Royalties
The province of Saskatchewan imposes royalties on the sale of uranium extracted from ore bodies in the province in accordance with Part III of The Crown Mineral Royalty Regulations (the 'Regulations') pursuant to The Crown Minerals Act (the 'Act'). Significant revisions to the uranium royalty regime in Saskatchewan became effective on January 1, 2013, with the resulting regime consisting of the following three components:
(i)
Basic Royalty: Computed as 5% of gross revenues derived from uranium extracted from ore bodies in the province;
2020 Annual Information Form 118
(ii)
Saskatchewan Resource Credit: Reduction in the basic royalty equal to 0.75% of gross revenues derived from uranium extracted from ore bodies in the province; and
(iii)
Profit Royalty: Two-tier rate structure, computed as 10% or 15% of net profits derived from the mining and processing of uranium extracted from ore bodies in the province.
Gross revenue, for the Basic Royalty, is determined in accordance with the Regulations and allows for reductions based on specified allowances. Net profit, for the Profit Royalty, is calculated based on the recognition of the full dollar value of a royalty payer's exploration, capital, production, decommissioning and reclamation costs, in most cases, incurred after January 1, 2013. Net profits will be taxed under the profit royalty at a rate of 10% for net profits up to and including $22.00 per kilogram ($10 per pound) of uranium sold, and at 15% for net profits in excess of $22.00 per kilogram. The $22.00 per kilogram threshold is applicable for 2013 (the base year) and is indexed in subsequent years for inflation.
Under this system, each owner or joint venture participant in a uranium mine is a royalty payer. Individual interests are consolidated on a corporate basis for the computation and reporting of royalties due to the province.
Royalty payments are due to the province on or before the last day of the month following the month in which the royalty payer sold, or consumed, the uranium for the purposes of the basic royalty, and quarterly installments are required based on estimates of net profits in respect of the profit royalty.
Canadian Income and Other Taxes
Denison and its Canadian subsidiaries are subject to federal and provincial income taxes. In 2020, taxable income was subject to federal taxes at a rate of 15%, and provincial taxes in Saskatchewan, Ontario, Quebec, British Columbia and the Yukon Territory at rates varying between 11.5% and 12.0%. Taxable income for each entity is allocated between provinces and territories based on a two point average of the proportion of salaries and revenues attributable to each province or territory. Denison expects that it will not be liable for Canadian income taxes on a current tax basis for the financial year ended 2020. As a resource corporation in Saskatchewan, Denison is also subject to a resource surcharge equal to 3% of the value of resource sales from production in Saskatchewan, if any, during the year.
In recent years, including 2020, Denison has issued shares eligible for treatment as 'flow through shares', as defined in subsection 66(15) of the Income Tax Act (Canada). As a result, a significant portion of Denison's Canadian Exploration Expenditures have been renounced to shareholders and are not available to Denison as a tax deduction in the current year or future years.
Audit / Review by Taxing Authorities
From time to time, Denison is subject to audit / review by taxing authorities. In certain jurisdictions, periodic reviews are carried out by taxing authorities in the ordinary course of business. Denison cooperates with all requests received from taxing authorities, and is not currently engaged in a material dispute with any of the applicable taxing authorities.
2020 Annual Information Form 119
RISK FACTORS
Denison's business, the value of the Shares and management's expectations regarding the same are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Denison to be materially different than anticipated.
The Board of Directors of Denison have, as part of their mandate, responsibility for the identification of the principal risks of the Company's business and ensuring the implementation of appropriate systems to manage these risks. Where appropriate, they have delegated responsibility for review of certain risks to the Committees of the Board with mandates relevant to such risks, such as the EHSS Committee (defined below) for risks related to environment, health, safety and sustainability matters, and the Audit Committee for risks related to financial reporting, internal controls, ethics and information security.
The following are those risks, uncertainties and other factors pertaining to the outlook and conditions currently known to Denison that have been identified by the Company as having the potential to negatively affect Denison's business and the value of the Shares. Current and prospective security holders of Denison should carefully consider these risk factors. However, these factors are not, and should not be construed as being exhaustive, and other circumstances that are currently not foreseen by management of Denison could arise to negatively affect Denison's business and its Shareholders.
Capital Intensive Industry and Uncertainty of Funding
The exploration and development of mineral properties and any operation of mines and facilities requires a substantial amount of capital and the ability of the Company to proceed with any of its plans with respect thereto depends on its ability to obtain financing through joint ventures, equity financing, debt financing or other means. The Company intends to use the proceeds from its October 2020 Offering, 2020 FT Offering, February 2021 Offering, 2021 FT Offering, March 2021 Offering and ATM issuances of its Shares as described for each such offering; however, the Company's ability to achieve such plans and objectives could change as a result of a number of internal and external factors, such as continued or new impacts of COVID-19 on society and the Company's operations, unfavourable changes in the spot market for physical uranium, and/or the impact that results from continued exploration and evaluation activities may have on the Company's future evaluation and development plans and anticipated costs and timelines. Because of the number and variability of factors that will determine the use of such proceeds, the Company's ultimate use might vary substantially from its planned use. There is no assurance that the proceeds from such prior offerings will be sufficient to meet the stated objectives or are not redirected to other business objectives at the discretion of the Company's management and the Board.
To fund additional activities, including future exploration, evaluation, development and construction activities, the Company will require additional financing. General market conditions, volatile uranium markets, a claim against the Company, a significant disruption to the Company's business or operations or other factors may make it difficult to secure financing necessary to fund the substantial capital that is typically required in order to continue to advance a mineral project, such as the Wheeler River project or Waterbury Lake project, through the testing, permitting and feasibility processes to a production decision or to place a property, such as the Wheeler River project or Waterbury Lake project, into commercial production. Similarly, there is no certainty that the Company's will be able to fund additional exploration or development of the Company's projects or acquisition of new projects at any particular time.
2020 Annual Information Form 120
There is no assurance that the Company will be successful in obtaining required financing as and when needed on acceptable terms, and failure to obtain such additional financing could result in the delay or indefinite postponement of any or all of the Company's exploration, development or other growth initiatives or otherwise have a material adverse impact on the Company's financial condition and/or ability to continue as a going concern.
COVID-19 Outbreaks
The COVID-19 pandemic has caused, and may cause further, disruptions to the Company's business and operational plans. Such disruptions may result from (i) restrictions that governments and communities impose to address the COVID-19 outbreak, (ii) restrictions that the Company and its contractors and subcontractors impose to ensure the safety of employees and others, (iii) shortages of employees and/or unavailability of contractors and subcontractors, and/or (iv) interruption of supplies from third parties upon which the Company relies. It is presently not possible to predict the likelihood, extent or duration of any such disruption. Any such disruption may have a material adverse effect on the Company's business, financial condition and results of operations, which could be rapid and unexpected. These disruptions may severely impact the Company's ability to carry out its business plans for 2021 and beyond.
Global Financial Conditions
Global financial conditions are subject to volatility arising from international geopolitical developments and global economic phenomenon, as well as general financial market turbulence, including the significant market reaction to the onset of the COVID-19 pandemic in 2020, resulting in a significant reduction in in many major market indices, and continuing market uncertainty and volatility. Access to public financing and credit can be negatively impacted by the effect of these events on Canadian and global credit markets. The health of the global financing and credit markets may impact the ability of Denison to obtain equity or debt financing in the future and the terms at which financing or credit is available to Denison. These instances of volatility and market turmoil could adversely impact Denison's operations and the trading price of the Shares.
Speculative Nature of Exploration and Development
Exploration for minerals and the development of mineral properties is speculative, and involves significant uncertainties and financial risks that even a combination of careful evaluation, experience and technical knowledge may not eliminate. While the discovery of an ore body may result in substantial rewards, few properties which are explored prove to return the discovery of a commercially mineable deposit and/or are ultimately developed into producing mines. As at the date hereof, many of Denison's projects are preliminary in nature and mineral resource estimates include inferred mineral resources, which are considered too speculative geologically to have the economic considerations applied that would enable them to be categorized as mineral reserves. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Major expenses may be required to properly evaluate the prospectivity of an exploration property, to develop new ore bodies and to estimate mineral resources and establish mineral reserves. There is no assurance that the Company's uranium deposits are commercially mineable.
Imprecision of Mineral Reserve and Resource Estimates
Mineral reserve and resourcefigures are estimates, and no assurances can be given that the estimated quantities of uranium are in the ground and could be produced, or that Denison will receive the prices assumed in determining its mineral reserves. Such estimates are expressions of judgment based on knowledge, mining experience, analysis of drilling results and industry best practices. Valid estimates made at a given time may significantly change when new information becomes available.
2020 Annual Information Form 121
While Denison believes that the Company's estimates of mineral reserves and mineral resources are well established and reflect management's best estimates, by their nature, mineral reserve and resource estimates are imprecise and depend, to a certain extent, upon statistical inferences and geological interpretations, which may ultimately prove inaccurate. Furthermore, market price fluctuations, as well as increased capital or production costs or reduced recovery rates, may render mineral reserves and resources uneconomic and may ultimately result in a restatement of mineral reserves and resources. The evaluation of mineral reserves or resourcesis always influenced by economic and technological factors, which may change over time.
Risks of, and Market Impacts on, Developing Mineral Properties
Denison's uranium production is dependent in part on the successful development of its known ore bodies, discovery of new ore bodies and/or revival of previously existing mining operations. It is impossible to ensure that Denison's current exploration and development programs will result in profitable commercial mining operations. Where the Company has been able to estimate the existence of mineral resources and mineral reserves, such as for the Wheeler River project, substantial expenditures are still required to establish economic feasibility for commercial development and to obtain the required environmental approvals, permits and assets necessary to commence commercial operations.
Development projects are subject to the completion of successful feasibility studies, engineering studies and environmental assessments, the issuance of necessary governmental permits and the availability of adequate financing. The economic feasibility of development projects is based upon many factors, including, among others: the accuracy of mineral reserve and resource estimates; metallurgical recoveries; capital and operating costs of such projects; government regulations relating to prices, taxes, royalties, infrastructure, land tenure, land use, importing and exporting, and environmental protection; political and economic climate; and uranium prices, which are historically cyclical.
Subject to the availability of capital, if a feasibility study is completed for the Wheeler River project, such feasibility study, and any estimates of mineral reserves and mineral resources, development costs, operating costs and estimates of future cash flow contained therein, will be based on Denison's interpretation of the information available at that time. Development projects have no operating history upon which to base developmental and operational estimates. Particularly for development projects, economic analyses and feasibility studies contain estimates based upon many factors, including estimates of mineral reserves, the interpretation of geologic and engineering data, anticipated tonnage and grades of ore to be mined and processed, the configuration of the ore body, expected recovery rates of uranium from the ore, estimated operating costs, anticipated climatic conditions and other factors. As a result, it is possible that actual capital and operating costs and economic returns will differ significantly from those estimated for a project prior to production. For example, the capital and operating cost projections and related economic indicators in the Wheeler PFS Report and Waterbury PEA may vary significantly from the capital and operating costs and economic returns estimated by a final feasibility study or actual expenditures.
The decision as to whether a property, such as Wheeler River or Waterbury Lake, contains a commercial mineral deposit and should be brought into production will depend upon the results of exploration and evaluation programs and/or feasibility studies, and the recommendations of duly qualified engineers and/or geologists, all of which involves significant expense and risk.
2020 Annual Information Form 122
It is not unusual in the mining industry for new mining operations to take longer than originally anticipated to bring into production, and to require more capital than anticipated. Any of the following events, among others, could affect the profitability or economic feasibility of a project or delay or stop its advancement: unavailability of necessary capital, unexpected problems during the start-up phase delaying production, unanticipated changes in grade and tonnes of ore to be mined and processed, unanticipated adverse geological conditions, unanticipated metallurgical recovery problems, incorrect data on which engineering assumptions are made, unavailability of labour, increased costs of processing and refining facilities, unavailability of economic sources of power and water, unanticipated transportation costs, changes in government regulations (including regulations with respect to the environment, prices, royalties, duties, taxes, permitting, restrictions on production, quotas on exportation of minerals, environmental, etc.), fluctuations in uranium prices, and accidents, labour actions and force majeure events.
The ability to sell and profit from the sale of any eventual mineral production from a property will be subject to the prevailing conditions in the applicable marketplace at the time of sale. The demand for uranium and other minerals is subject to global economic activity and changing attitudes of consumers and other end-users' demand.
Many of these factors are beyond the control of a mining company and therefore represent a market risk which could impact the long term viability of Denison and its operations.
Denison has a History of Negative Operating Cash Flow
Denison has a history of negative operating cash flow for recent past financial reporting periods. In addition, the Company has committed a portion of its short to medium term cash flows in connection with the APG Arrangement. Denison anticipates that it will continue to have negative operating cash flow until such time, if at all, its Wheeler River project goes into production. To the extent that Denison has negative operating cash flow in future periods, Denison may need to allocate a portion of its cash reserves or other financial or non-financial assets to fund such negative cash flow. Denison may also be required to raise additional funds through the issuance of equity or debt securities. There can be no assurance that additional capital or other types of financing will be available when needed or that these financings will be on terms favourable to Denison.
Risks Associated with the Selection of Novel Mining Methods
As disclosed in the Wheeler PFS Report, Denison has selected the ISR mining method for production at the Phoenix deposit. While test work completed to date indicates that ground conditions and the mineral reserves estimated to be contained within the deposit are amenable to extraction by way of ISR, actual conditions could be materially different from those estimated based on the Company's technical studies completed to-date. While industry best practices have been utilized in the development of its estimates, actual results may differ significantly. Denison will need to complete substantial additional work to further advance and/or confirm its current estimates and projections for development to the level of a feasibility study. As a result, it is possible that actual costs and economic returns of any mining operations may differ materially from Denison's best estimates.
Dependence on Obtaining Licenses, and other Regulatory and Policy Risks
Uranium mining and milling operations and exploration activities, as well as the transportation and handling of the products produced, are subject to extensive regulation by federal, provincial and state governments, including the Saskatchewan Government and the Canadian Nuclear Safety Commission.
2020 Annual Information Form 123
Such regulations relate to production, development, exploration, exports, imports, taxes and royalties, labour standards, occupational health, waste disposal, protection and remediation of the environment, mine decommissioning and reclamation, mine safety, toxic substances, transportation safety and emergency response, and other matters. Compliance with such laws and regulations is currently, and has historically, increased the costs of exploring, drilling, developing, constructing, operating and closing Denison's mines and processing facilities. It is possible that the costs, delays and other effects associated with such laws and regulations may impact Denison's decision with respect to exploration and development properties, including whether to proceed with exploration or development, or that such laws and regulations may result in Denison incurring significant costs to remediate or decommission properties that do not comply with applicable environmental standards at such time.
The development of mines and related facilities is contingent upon governmental approvals that are complex and time consuming to obtain and which involve multiple governmental agencies. Environmental and regulatory review has become a long, complex and uncertain process that can cause potentially significant delays. Obtaining these government approvals includes among other things, obtaining environmental assessments and engaging with interested parties. See 'Engagement with Canada's First Nations and Métis' for more information regarding Denison's community engagement. In addition, future changes in governments, regulations and policies, such as those affecting Denison's mining operations, uranium transport and international trade, could materially and adversely affect Denison's results of operations and financial condition in a particular period or its long-term business prospects.
The ability of the Company to obtain and maintain permits and approvals and to successfully explore and evaluate properties and/or develop and operate mines may be adversely affected by real or perceived impacts associated with its activities that affect the environment and human health and safety at its projects and in the surrounding communities. The real or perceived impacts of the activities of other mining companies, locally or globally, may also adversely affect our ability to obtain and maintain permits and approvals. The Company is uncertain as to whether all necessary permits will be obtained or renewed on acceptable terms or in a timely manner. Any significant delays in obtaining or renewing such permits or licences in the future could have a material adverse effect on Denison.
Denison suspended certain activities at Wheeler River during 2020, including the EA process, which is on the critical path to achieving the project development schedule outlined in the PFS. An important part of the EA process involves extensive engagement and consultation with various interested parties. Accordingly, the decision to suspend the EA was motivated by the significant social and economic disruptions that emerged at the onset of the COVID-19 pandemic, and other fiscal prudence measures. While the EA process has resumed, the Company is not currently able to estimate the impact to the project development schedule, cost estimates or other project development assumptions and projections outlined in the PFS, and users are specifically cautioned against relying on the estimates provided therein regarding the start of pre-production activities in 2021 and first production in 2024.
Denison expends significant financial and managerial resources to comply with such laws and regulations. Denison anticipates it will have to continue to do so as the historic trend toward stricter government regulation may continue. Because legal requirements are frequently changing and subject to interpretation, Denison is unable to predict the ultimate cost of compliance with these requirements or their effect on operations. While the Company has taken great care to ensure full compliance with its legal obligations, there can be no assurance that the Company has been or will be in full compliance with all of these laws and regulations, or with all permits and approvals that it is required to have.
2020 Annual Information Form 124
Failure to comply with applicable laws, regulations and permitting requirements, even inadvertently, may result in enforcement actions. These actions may result in orders issued by regulatory or judicial authorities causing operations to cease or be curtailed, and may include corrective measures requiring capital expenditures, installation of additional equipment or remedial actions, which may have a material adverse effect on the Company. Companies engaged in uranium exploration, evaluation, mining or milling activities may be required to compensate others who suffer loss or damage by reason of such activities and may have civil or criminal fines or penalties imposed for violations of applicable laws or regulations.
Engagement with Canada's First Nations and Métis
First Nations and Métis rights, entitlements and title claims may impact Denison's ability and that of its joint venture partners to pursue exploration, development and mining at its Saskatchewan properties. Pursuant to historical treaties, First Nations in northern Saskatchewan ceded title to most traditional lands but continue to assert title to the minerals within the lands. Métis people have not signed treaties; they assert Aboriginal rights throughout Saskatchewan, including Aboriginal title over most if not all of the Company's project lands.
Managing relations with the local First Nations and Métis communities and governments is a matter of paramount importance to Denison. Engagement with, and consideration of the rights of, potentially affected Indigenous peoples may require accommodations, including undertakings regarding funding, contracting, environmental practices, employment and other matters and can be time consuming and challenging. This may affect the timetable and costs of exploration, evaluation and development of the Company's projects.
The Company's relationships with various interested parties are critical to ensure the future success of its existing operations and the construction and development of its projects. There is an increasing level of public concern relating to the perceived effect of mining activities on the environment and on parties impacted by such activities. Adverse publicity relating to the mining industry generated by non-governmental organizations and others could have an adverse effect on the Company's reputation or financial condition and may impact its relationship with interested parties. While the Company is committed to operating in a socially responsible manner, there is no guarantee that the Company's efforts in this regard will be successful or mitigate this potential risk.
The inability of the Company to maintain positive relationships with interested parties, including local First Nations and Métis, may result in additional obstacles to permitting, increased legal challenges, or other disruptions to the Company's exploration, development and production plans, and could have a significant adverse impact on the Company's share price and financial condition.
Environmental, Health and Safety Risks
Denison has expended significant financial and managerial resources to comply with environmental protection laws, regulations and permitting requirements in each jurisdiction where it operates, and anticipates that it will be required to continue to do so in the future as the historical trend toward stricter environmental regulation may continue. The uranium industry is subject to the worker health, safety and environmental risks associated with all mining businesses, including potential liabilities to third parties for environmental damage, and to additional risks uniquely associated with uranium mining and processing. The possibility of more stringent regulations exists in the areas of worker health and safety, the disposition of wastes, the decommissioning and reclamation of mining and processing sites, and other environmental matters each of which could have a material adverse effect on the costs or the viability of a particular project.
2020 Annual Information Form 125
Denison's facilities operate under various operating and environmental permits, licences and approvals that contain conditions that must be met, and Denison's right to pursue its development plans is dependent upon receipt of, and compliance with, additional permits, licences and approvals. Failure to obtain such permits, licenses and approvals and/or meet any conditions set forth therein could have a material adverse effect on Denison's financial condition or results of operations.
Although the Company believes its operations are in compliance, in all material respects, with all relevant permits, licences and regulations involving worker health and safety as well as the environment, there can be no assurance regarding continued compliance or ability of the Company to meet stricter environmental regulation, which may also require the expenditure of significant additional financial and managerial resources.
Mining companies are often targets of actions by non-governmental organizations and environmental groups in the jurisdictions in which they operate. Such organizations and groups may take actions in the future to disrupt Denison's operations. They may also apply pressure to local, regional and national government officials to take actions which are adverse to Denison's operations. Such actions could have an adverse effect on Denison's ability to advance its projects and, as a result, on its financial position and results.
Acquisition of Physical Uranium
The Company plans to use the substantial majority of the proceeds of the March 2021 Offering in order to fund the purchase of physical uranium as part of a financing initiative in connection with the advancement of the Company's uranium projects. This strategy will be subject to a number of risks and there is no assurance that the strategy will be successful. Specific risks include the following:
● The Company has stated its intention to purchase approximately 2.5 million pounds of U3O8 in the spot market. This quantity was estimated based on uranium prices at the time of pricing the March 2021 Offering. There is no assurance that the Company will be able to purchase this quantity of U3O8 as the spot price will be subject to fluctuations and may increase prior to the Company accumulating the targeted position. Accordingly, increases in the spot price may result in the Company accumulating less than the targeted amount of physical uranium.
● The Company intends to hold the physical uranium for long-term investment. During this term, the value of Denison's uranium holdings will fluctuate and accordingly the Company will be subject to losses should it ultimately determine to sell the uranium at prices lower than the acquisition cost. In addition, the Company may incur income statement losses, should uranium prices decrease or foreign exchange rates fluctuate unfavourably in future financial periods.
● The Company intends to use the physical uranium, in part, to support the potential financing of the development of the Wheeler River project. There is no assurance that the physical uranium may be pledged as security for any potential financing, that the full value of the uranium held will be recognized by any party providing financing or that the Company's ownership of the physical uranium will enhance the Company's ability to access future project financing. Further, should the purchased uranium be used as security for a future financing, there is a risk that it would no longer be available for sale by the Company to meet any other objectives described for use of the proceeds of the March 2021 Offering.
2020 Annual Information Form 126
● The Company may be required to sell a portion or all of the physical uranium accumulated to funds its operations should other forms of financing not be available to fund the Company's capital requirements.
Global Demand and International Trade Restrictions
The international nuclear fuel industry, including the supply of uranium concentrates, is relatively small compared to other minerals, and is generally highly competitive and heavily regulated. Worldwide demand for uranium is directly tied to the demand for electricity produced by the nuclear power industry, which is also subject to extensive government regulation and policies. In addition, the international marketing of uranium is subject to governmental policies and certain trade restrictions. For example, the supply and marketing of uranium from Russia is limited by international trade agreements.
As an example, over the past two years, policy related reviews in the United States have impacted the nuclear fuel market. In 2018, certain uranium producers filed a petition with the U.S. Department of Commerce ('DOC') to investigate the import of uranium into the U.S. under Section 232 of the 1962 Trade Expansion Act. The Nuclear Fuels Working Group convened to review the matter recommended that the US build a strategic uranium reserve, and in December 2020, the US Congress passed a Bill that included funding for the first year of the acquisitions for the strategic reserve of uranium. This long-awaited resolution ended a period of uncertainty and disruption in the nuclear fuel market. Similarly, a 2020 extension to the Russian Suspension Agreement ended a period of uncertainty in the uranium market regarding potential changes to restrictions on Russian uranium supplies entering the United States.
The uncertainty surrounding these trade matters are believed to have impacted the uranium purchasing activities of nuclear utilities, especially in the U.S., and consequently negatively impacted the market price of uranium and the uranium industry as a whole.
In general, trade agreements, governmental policies and/or trade restrictions are beyond the control of Denison and may affect the supply of uranium available for use in markets like the United States and Europe, which are currently the largest markets for uranium in the world. Similarly, trade restrictions or foreign policy have the potential to impact the ability to supply uranium to developing markets, such as China and India. If substantial changes are made to regulations affecting the global marketing and supply of uranium, the Company's business, financial condition and results of operations may be materially adversely affected.
No Public Market for Uranium
There is no public market for the sale of uranium. The uranium futures market on the New York Mercantile Exchange does not provide for physical delivery of uranium, only cash on settlement, and that trading forum does not offer a formal market but rather facilitates the introduction of buyers to sellers. The Company may not be able to acquire uranium or, once acquired, sell uranium at a desired price level for a number of weeks or months. The pool of potential purchasers and sellers is limited, and each transaction may require the negotiation of specific provisions. Accordingly, a purchase or sale cycle may take several weeks or months to complete. In addition, as the supply of uranium is limited, the Company may experience additional difficulties purchasing uranium in the event that it is a significant buyer. If the Company determines to sell any physical uranium that it has acquired, it may likewise experience difficulties in finding purchasers that are able to accept a material quantity of physical uranium. The inability to purchase and sell on a timely basis in sufficient quantities could have a material adverse effect on the securities of the Company.
2020 Annual Information Form 127
In using the proceeds from the March 2021 Offering, the Company will enter into commitments to purchase U3O8. Such commitments are generally subject to conditions in favour of both the vendor and the Company, and there is no certainty that the purchases contemplated by such commitments will be completed.
Volatility and Sensitivity to Market Prices
The value of the Company's mineral resources, mineral reserves and estimates of the viability of future production for its projects is heavily influenced by long and short term market prices of U3O8. Historically, these prices have seen significant fluctuations, and have been and will continue to be affected by numerous factors beyond Denison's control. Such factors include, among others: demand for nuclear power, political, economic and social conditions in uranium producing and consuming countries, public and political response to nuclear incidents, reprocessing of used reactor fuel and the re-enrichment of depleted uranium tails, sales of excess civilian and military inventories (including from the dismantling of nuclear weapons) by governments and industry participants, uranium supplies from other secondary sources, and production levels and costs of production from primary uranium suppliers.
Uranium prices failing to reach or sustain projected levels can impact operations by requiring a reassessment of the economic viability of the Company's projects, and such reassessment alone may cause substantial delays and/or interruptions in project development, which could have a material adverse effect on the results of operations and financial condition of Denison.
Public Acceptance of Nuclear Energy and Competition from Other Energy Sources
Growth of the uranium and nuclear power industry will depend upon continued and increased acceptance of nuclear technology as a clean means of generating electricity. Because of unique political, technological and environmental factors that affect the nuclear industry, including the risk of a nuclear incident, the industry is subject to public opinion risks that could have an adverse impact on the demand for nuclear power and increase the regulation of the nuclear power industry. Nuclear energy competes with other sources of energy, including oil, natural gas, coal and hydro-electricity. These other energy sources are, to some extent, interchangeable with nuclear energy, particularly over the longer term. Technical advancements in, and government subsidies for, renewable and other alternate forms of energy, such as wind and solar power, could make these forms of energy more commercially viable and put additional pressure on the demand for uranium concentrates. Sustained lower prices of alternate forms of energy may result in lower demand for uranium concentrates.
Current estimates project increases in the world's nuclear power generating capacities, primarily as a result of a significant number of nuclear reactors that are under construction, planned, or proposed in China, India and various other countries around the world. Market projections for future demand for uranium are based on various assumptions regarding the rate of construction and approval of new nuclear power plants, as well as continued public acceptance of nuclear energy around the world. The rationale for adopting nuclear energy can be varied, but often includes the clean and environmentally friendly operation of nuclear power plants, as well as the affordability and round-the-clock reliability of nuclear power. A change in public sentiment regarding nuclear energy could have a material impact on the number of nuclear power plants under construction, planned or proposed, which could have a material impact on the market's and the Company's expectations for the future demand for uranium and the future price of uranium.
2020 Annual Information Form 128
Market Price of Shares
The market price of Denison's securities may experience wide fluctuations which may not necessarily be related to the financial condition, operating performance, underlying asset values or prospects of the Company. These factors include macroeconomic developments in North America and globally, market perceptions of the attractiveness of particular industries - including mining and nuclear energy - and volatile trading due to unpredictable general market or trading sentiments. The market price of the Company's securities may be affected by many other variables which are not directly related to our success and are, therefore, not within our control, including other developments that affect the market for all resource sector securities, the breadth of the public market for the shares and the attractiveness of alternative investments.
The market price of Denison's securities are also likely to increase or decrease in response to a number of events and factors, including: our operating performance and the performance of competitors and other similar companies; volatility in metal prices; the arrival or departure of key personnel; the number of shares to be publicly traded after an offering pursuant to any prospectus supplement; the public's reaction to the Company's press releases, material change reports, other public announcements and our filings with the various securities regulatory authorities; changes in earnings estimates or recommendations by research analysts who track Denison's shares or the shares of other companies in the resource sector; public sentiment regarding nuclear energy or uranium mining; changes in general economic and/or political conditions; acquisitions, strategic alliances or joint ventures involving us or our competitors; and the other risk factors listed herein.
Financial markets have recently experienced significant price and volume fluctuations that have particularly affected the market prices of equity securities of companies. With respect to the Company's shares, the trading price has recently increased significantly and there is no assurance that this price increase will be sustained. Accordingly, the market price of the shares may decline even if the Company's operating results, underlying asset values or prospects have not changed. Additionally, these factors, as well as other related factors, may cause decreases in asset values that are deemed to be other than temporary, which may result in impairment losses. There can be no assurance that continuing fluctuations in price and volume will not occur. If such increased levels of volatility and market turmoil continue, the Company's operations could be adversely impacted, and the trading price of the shares may be materially adversely affected.
Other factors unrelated to the performance of Denison that may have an effect on the price of the securities of Denison include the lessening (or increasing) in trading volume, exclusion (or inclusion) in market indices, and general investor interest in Denison's securities. Similarly, changes in the liquidity of Denison's Shares may limit the ability of some institutions to invest in (or divest of) Denison's securities, and a substantial decline in the liquidity and/or price of the securities of Denison that persists for a significant period of time could cause Denison's securities to be delisted from an exchange. If an active market for the securities of Denison does not continue, the liquidity of an investor's investment may be limited and the price of the securities of the Company may decline such that investors may lose their entire investment in the Company. As a result of any of these factors, the market price of the securities of Denison at any given point in time may not accurately reflect the long-term value of Denison. Securities class-action litigation often has been brought against companies following periods of volatility in the market price of their securities. Denison may in the future be the target of similar litigation. Securities litigation could result in substantial costs and damages and divert management's attention and resources.
2020 Annual Information Form 129
Dilution from Further Issuances
While active in exploring for new uranium discoveries in the Athabasca Basin region, Denison's present focus is on advancing the Wheeler River project to a development decision, with the potential to become the next large scale uranium producer in Canada. Denison will require additional funds to further such activities.
Denison may sell additional equity securities (including through the sale of securities convertible into Shares) and may issue additional debt or equity securities to finance its exploration, evaluation, development, construction and other operations, acquisitions or other projects. Denison is authorized to issue an unlimited number of Shares. Denison cannot predict the size of future sales and issuances of debt or equity securities or the effect, if any, that future sales and issuances of debt or equity securities will have on the market price of the Shares. Sales or issuances of a substantial number of equity securities, or the perception that such sales could occur, may adversely affect prevailing market prices for the Shares. With any additional sale or issuance of equity securities, investors may suffer dilution of their voting power and it could reduce the value of their investment.
Reliance on Other Operators
At some of its properties, Denison is not the operator and therefore is not in control of all of the activities and operations at the site. As a result, Denison is and will be, to a certain extent, dependent on the operators for the nature and timing of activities related to these properties and may be unable to direct or control such activities.
As an example, Orano Canada is the operator and majority owner of the MLJV and MWJV in Saskatchewan, Canada. The McClean Lake mill employs unionized workers who work under collective agreements. Orano Canada, as the operator, is responsible for most operational and production decisions and all dealings with unionized employees. Orano Canada may not be successful in its attempts to renegotiate the collective agreements, which may impact mill and mining operations. Similarly, Orano Canada is responsible for all licensing and dealings with various regulatory authorities. Orano Canada maintains the regulatory licences in order to operate the McClean Lake mill, all of which are subject to renewal from time to time and are required in order for the mill to operate in compliance with applicable laws and regulations. Any lengthy work stoppages, or disruption to the operation of the mill or mining operations as a result of a licensing matter or regulatory compliance, may have a material adverse impact on the Company's future cash flows, earnings, results of operations and financial condition.
Reliance on Facilities
Any uranium purchased by the Company, in particular with the proceeds of the March 2021 Offering, will be stored at one or more licensed uranium conversion facilities ('Facilities') owned by different organizations. As the number of duly licensed Facilities is limited, there can be no assurance that storage arrangements that are commercially beneficial to the Company will be readily available. Failure to negotiate commercially reasonable storage terms with the Facilities may have a material adverse effect on the financial condition of the Company.
By holding its investments in uranium with licensed Facilities, the Company is exposed to the credit risks of any such Facilities and their operators. There is no guarantee that the Company can fully recover all of its investments in uranium held with the Facilities. Failure to recover all uranium holdings could have a material adverse effect on the financial condition of the Company.
2020 Annual Information Form 130
Any loss or damage of the uranium may not be fully covered or absolved by contractual arrangements with the Facilities or the Company's insurance arrangements, and the Company may be financially and legally responsible for losses and/or damages not covered by indemnity provisions or insurance. Such responsibility could have a material adverse effect on the financial condition of the Company.
Reliance on Contractors and Experts
In various aspects of its operations, Denison relies on the services, expertise and recommendations of its service providers and their employees and contractors, whom often are engaged at significant expense to the Company. For example, the decision as to whether a property contains a commercial mineral deposit and should be brought into production will depend in large part upon the results of exploration programs and/or feasibility studies, and the recommendations of duly qualified third party engineers and/or geologists. In addition, while Denison emphasizes the importance of conducting operations in a safe and sustainable manner, it cannot exert absolute control over the actions of these third parties when providing services to Denison or otherwise operating on Denison's properties. Any material error, omission, act of negligence or act resulting in environmental pollution, accidents or spills, industrial and transportation accidents, work stoppages or other actions could adversely affect the Company's operations and financial condition.
Foreign Exchange Rates
The Company maintains its accounting records and reports its financial position and results in Canadian dollars. Fluctuations in the U.S. currency exchange rate relative to the Canadian currency could significantly impact the Company, including its financial results, operations or the trading value of its securities, as a result of various factors including: (a) the anticipated acquisition of physical uranium, pursuant to the March 2021 Offering, will generally be made in U.S. dollars; (b) any storage costs from the Facilities for storage of such uranium could be payable in U.S. dollars or other non-Canadian currency and (c) the price of uranium is quoted in U.S. dollars, and a decrease in value of USD would result in a relative decrease in the valuation of uranium and the associated market value from a Canadian currency perspective. In addition, the Company's outstanding common share purchase warrants (issued pursuant to the February 2021 Offering and the March 2021 Offering) have a USD denominated exercise price, and fluctuations in relative currency exchange rates will impact the proceeds raised from future exercises of such warrants. Exchange rate fluctuations, and any potential negative consequences thereof, are beyond the Company's control.
Benefits Not Realized From Transactions
Denison has completed a number of transactions over the last several years, including without limitation the acquisition of International Enexco Ltd., the acquisition of Fission, the acquisition of JNR, the sale of its mining assets and operations located in the United States to Energy Fuels Inc., the Mongolia Transaction, the optioning of the Moore Lake property to Skyharbour Resources Ltd., the acquisition of an 80% interest in the Hook-Carter property from ALX, the acquisition of an interest in the Moon Lake property from CanAlaska, entering into the APG Transaction and Cameco Transaction. Despite Denison's belief that these transactions, and others which may be completed in the future, will be in Denison's best interest and benefit the Company and Denison's shareholders, Denison may not realize the anticipated benefits of such transactions or realize the full value of the consideration paid or received to complete the transactions. This could result in significant accounting impairments or write-downs of the carrying values of mineral properties or other assets and could adversely impact the Company and the price of its Shares.
2020 Annual Information Form 131
Inability to Exploit, Expand and Replace Mineral Reserves and Resources
Denison's mineral reserves and resources at its Wheeler River, Waterbury Lake, McClean Lake and Midwest projects are Denison's material future sources of possible uranium production. Unless other mineral reserves or resources are discovered or acquired, Denison's sources of future production for uranium concentrates will decrease over time if its current mineral reserves and resources are exploited or otherwise depleted. There can be no assurance that Denison's future exploration, development and acquisition efforts will be successful in replenishing its mineral reserves and resources. In addition, while Denison believes that many of its properties demonstrate development potential, there can be no assurance that they can or will be successfully developed and put into production in future years.
Competition for Properties
Significant competition exists for the limited supply of mineral lands available for acquisition. Participants in the mining business include large established companies with long operating histories. In certain circumstances, the Company may be at a disadvantage in acquiring new properties as competitors may have greater financial resources and more technical staff. Accordingly, there can be no assurance that the Company will be able to compete successfully to acquire new properties or that any such acquired assets would yield resources or reserves or result in commercial mining operations.
Property Title Risk
The Company has investigated its rights to explore and exploit all of its material properties and, to the best of its knowledge, those rights are in good standing. However, no assurance can be given that such rights will not be revoked, or significantly altered, to its detriment. There can also be no assurance that the Company's rights will not be challenged or impugned by third parties, including the Canadian federal, provincial and local governments, as well as by First Nations and Métis.
There is also a risk that Denison's title to, or interest in, its properties may be subject to defects or challenges. If such defects or challenges cover a material portion of Denison's property, they could have a material adverse effect on Denison's results of operations, financial condition, reported mineral reserves and resources and/or long-term business prospects.
Ability to Maintain Obligations under Credit Facility and Other Debt
The Credit Facility has a term of one year, and will need to be renewed on or before January 31, 2022. There is no certainty what terms of any renewal may be, or any assurance that such renewal will be made available to Denison.
Denison is required to satisfy certain financial covenants in order to maintain its good standing under the Credit Facility. Denison is also subject to a number of restrictive covenants under the Credit Facility and the APG Transaction, such as restrictions on Denison's ability to incur additional indebtedness and sell, transfer of otherwise dispose of material assets. Denison may from time to time enter into other arrangements to borrow money in order to fund its operations and expansion plans, and such arrangements may include covenants that have similar obligations or that restrict its business in some way.
2020 Annual Information Form 132
Events may occur in the future, including events out of Denison's control, which could cause Denison to fail to satisfy its obligations under the Credit Facility, APG Transaction or other debt instruments. In such circumstances, the amounts drawn under Denison's debt agreements may become due and payable before the agreed maturity date, and Denison may not have the financial resources to repay such amounts when due. The Credit Facility and APG Transaction are secured by DMI's main properties by a pledge of the shares of DMI. If Denison were to default on its obligations under the Credit Facility, APG Transaction or other secured debt instruments in the future, the lender(s) under such debt instruments could enforce their security and seize significant portions of Denison's assets.
Change of Control Restrictions
The APG Transaction and certain other of Denison's agreements contain provisions that could adversely impact Denison in the case of a transaction that would result in a change of control of Denison or certain of its subsidiaries. In the event that consent is required from our counterparty and our counterparty chooses to withhold its consent to a merger or acquisition, then such party could seek to terminate certain agreements with Denison, including certain agreements forming part of the APG Transaction, or require Denison to buy the counterparty's rights back from them, which could adversely affect Denison's financial resources and prospects. If applicable, these restrictive contractual provisions could delay or discourage a change in control of our company that could otherwise be beneficial to Denison or its shareholders.
Decommissioning and Reclamation
As owner of the Elliot Lake decommissioned sites and part owner of the McClean Lake mill, McClean Lake mines, the Midwest uranium project and certain exploration properties, and for so long as the Company remains an owner thereof, the Company is obligated to eventually reclaim or participate in the reclamation of such properties. Most, but not all, of the Company's reclamation obligations are secured, and cash and other assets of the Company have been reserved to secure this obligation. Although the Company's financial statements record a liability for the asset retirement obligation, and the security requirements are periodically reviewed by applicable regulatory authorities, there can be no assurance or guarantee that the ultimate cost of such reclamation obligations will not exceed the estimated liability contained on the Company's financial statements.
As Denison's properties approach or go into decommissioning, regulatory review of the Company's decommissioning plans may result in additional decommissioning requirements, associated costs and the requirement to provide additional financial assurances. It is not possible to predict what level of decommissioning and reclamation (and financial assurances relating thereto) may be required from Denison in the future by regulatory authorities.
Technical Innovation and Obsolescence
Requirements for Denison's products and services may be affected by technological changes in nuclear reactors, enrichment and used uranium fuel reprocessing. These technological changes could reduce the demand for uranium or reduce the value of Denison's closed mines services to potential customers. In addition, Denison's competitors may adopt technological advancements that give them an advantage over Denison.
Mining and Insurance
Denison's business is capital intensive and subject to a number of risks and hazards, including environmental pollution, accidents or spills, industrial and transportation accidents, labour disputes, changes in the regulatory environment, natural phenomena (such as inclement weather conditions, earthquakes, pit wall failures and cave-ins) and encountering unusual or unexpected geological conditions.
2020 Annual Information Form 133
Many of the foregoing risks and hazards could result in damage to, or destruction of, Denison's mineral properties or processing facilities in which it has an interest; personal injury or death; environmental damage; delays in or interruption of or cessation of exploration, development, production or processing activities; or costs, monetary losses and potential legal liability and adverse governmental action. In addition, due to the radioactive nature of the materials handled in uranium exploration, mining and processing, as applicable, additional costs and risks are incurred by Denison and its joint venture partners on a regular and ongoing basis.
Although Denison maintains insurance to cover some of these risks and hazards in amounts it believes to be reasonable, such insurance may not provide adequate coverage in the event of certain circumstances. No assurance can be given that such insurance will continue to be available, that it will be available at economically feasible premiums, or that it will provide sufficient coverage for losses related to these or other risks and hazards.
Denison may be subject to liability or sustain loss for certain risks and hazards against which it cannot insure or which it may reasonably elect not to insure because of the cost. This lack of insurance coverage could result in material economic harm to Denison.
Uranium Industry is Subject to Influential Political and Regulatory Factors
The international uranium industry, including the supply of uranium concentrates, is relatively small, competitive and heavily regulated. Worldwide demand for uranium is directly tied to the demand for electricity produced by the nuclear power industry, which is also subject to extensive government regulation and policies. In addition, the international marketing and trade of uranium is subject to current, and potential changes in, governmental policies, regulatory requirements, and international trade restrictions (including trade agreements, customs, duties and/or taxes).
International agreements, governmental policies and trade restrictions are beyond the control of the Company. Changes in regulatory requirements, customs, duties or taxes may affect the supply of uranium available in the United States and Europe, which are currently the largest markets for uranium in the world, as well as the future of supply to developing markets, such as China and India. If substantial changes are made to the regulations affecting global marketing and supply of uranium, the Company's business, financial condition and results of operations may be materially adversely affected.
Anti-Bribery and Anti-Corruption Laws
The Company is subject to anti-bribery and anti-corruption laws, including the Corruption of Foreign Public Officials Act (Canada) and the United States Foreign Corrupt Practices Act of 1977, as amended. Failure to comply with these laws could subject the Company to, among other things, reputational damage, civil or criminal penalties, other remedial measures and legal expenses which could adversely affect the Company's business, results from operations, and financial condition. It may not be possible for the Company to ensure compliance with anti-bribery and anti-corruption laws in every jurisdiction in which its employees, agents, sub-contractors or joint venture partners are located or may be located in the future.
Climate Change
Due to changes in local and global climatic conditions, many analysts and scientists predict an increase in the frequency of extreme weather events such as floods, droughts, forest and brush fires and extreme storms.
2020 Annual Information Form 134
Such events could materially disrupt the Company's operations, particularly if they affect the Company's sites, impact local infrastructure or threaten the health and safety of the Company's employees and contractors. In addition, reported warming trends could result in later freeze-ups and warmer lake temperatures, affecting the Company's winter exploration programs at certain of its projects. Any such event could result in material economic harm to Denison.
The Company is focused on operating in a manner designed to minimize the environmental impacts of its activities; however, environmental impacts from mineral exploration and mining activities are inevitable. Increased environmental regulation and/or the use of fiscal policy by regulators in response to concerns over climate change and other environmental impacts, such as additional taxes levied on activities deemed harmful to the environment, could have a material adverse effect on Denison's financial condition or results of operations.
Information Systems and Cyber Security
The Company's operations depend upon the availability, capacity, reliability and security of its information technology ('IT') infrastructure, and its ability to expand and update this infrastructure as required, to conduct daily operations. Denison relies on various IT systems in all areas of its operations, including financial reporting, contract management, exploration and development data analysis, human resource management, regulatory compliance and communications with employees and third parties.
These IT systems could be subject to network disruptions caused by a variety of sources, including computer viruses, security breaches and cyber-attacks, as well as network and/or hardware disruptions resulting from incidents such as unexpected interruptions or failures, natural disasters, fire, power loss, vandalism and theft. The Company's operations also depend on the timely maintenance, upgrade and replacement of networks, equipment, IT systems and software, as well as pre-emptive expenses to mitigate the risks of failures.
The ability of the IT function to support the Company's business in the event of any such occurrence and the ability to recover key systems from unexpected interruptions cannot be fully tested. There is a risk that, if such an event actually occurs, the Company's continuity plans may not be adequate to immediately address all repercussions of the disaster. In the event of a disaster affecting a data centre or key office location, key systems may be unavailable for a number of days, leading to inability to perform some business processes in a timely manner. As a result, the failure of Denison's IT systems or a component thereof could, depending on the nature of any such failure, adversely impact the Company's reputation and results of operations.
Although to date the Company has not experienced any material losses relating to cyber-attacks or other information security breaches, there can be no assurance that the Company will not incur such losses in the future. Unauthorized access to Denison's IT systems by employees or third parties could lead to corruption or exposure of confidential, fiduciary or proprietary information, interruption to communications or operations or disruption to the Company's business activities or its competitive position. Further, disruption of critical IT services, or breaches of information security, could have a negative effect on the Company's operational performance and its reputation. The Company's risk and exposure to these matters cannot be fully mitigated because of, among other things, the evolving nature of these threats. As a result, cyber security and the continued development and enhancement of controls, processes and practices designed to protect systems, computers, software, data and networks from attack, damage or unauthorized access remain a priority.
2020 Annual Information Form 135
The Company applies technical and process controls in line with industry-accepted standards to protect information, assets and systems; however, these controls may not adequately prevent cyber-security breaches. There is no assurance that the Company will not suffer losses associated with cyber-security breaches in the future, and may be required to expend significant additional resources to investigate, mitigate and remediate any potential vulnerabilities. As cyber threats continue to evolve, the Company may be required to expend additional resources to continue to modify or enhance protective measures or to investigate and remediate any security vulnerabilities.
Dependence on Key Personnel and Qualified and Experienced Employees
Denison's success depends on the efforts and abilities of certain senior officers and key employees. Certain of Denison's employees have significant experience in the uranium industry, and the number of individuals with significant experience in this industry is small. While Denison does not foresee any reason why such officers and key employees will not remain with Denison, if for any reason they do not, Denison could be adversely affected. Denison has not purchased key man life insurance for any of these individuals. Denison's success also depends on the availability of and competitiveness for qualified and experienced employees to work in Denison's operations and Denison's ability to attract and retain such employees. In addition, Denison's ability to keep essential operating staff in place may also be challenged as a result of potential COVID-19 outbreaks or quarantines.
Conflicts of Interest
Some of the directors and officers of Denison are also directors of other companies that are similarly engaged in the business of acquiring, exploring and developing natural resource properties. Such associations may give rise to conflicts of interest from time to time. In particular, one of the consequences would be that corporate opportunities presented to a director or officer of Denison may be offered to another company or companies with which the director or officer is associated, and may not be presented or made available to Denison. The directors and officers of Denison are required by law to act honestly and in good faith with a view to the best interests of Denison, to disclose any interest which they may have in any project or opportunity of Denison, and, where applicable for directors, to abstain from voting on such matter. Conflicts of interest that arise will be subject to and governed by the procedures prescribed in the Company's Code of Ethics and by the OBCA.
Disclosure and Internal Controls
Internal controls over financial reporting are procedures designed to provide reasonable assurance that transactions are properly authorized, assets are safeguarded against unauthorized or improper use, and transactions are properly recorded and reported. Disclosure controls and procedures are designed to ensure that information required to be disclosed by a company in reports filed with securities regulatory agencies is recorded, processed, summarized and reported on a timely basis and is accumulated and communicated to the company's management, including its Chief Executive Officer and Chief Financial Officer, as appropriate, to allow timely decisions regarding required disclosure. A control system, no matter how well designed and operated, can provide only reasonable, not absolute, assurance with respect to the reliability of reporting, including financial reporting and financial statement preparation.
Potential Influence of KEPCO and KHNP
Effective December 2016, KEPCO indirectly transferred the majority of its interest in Denison to KHNP Canada.
2020 Annual Information Form 136
Denison and KHNP Canada subsequently entered into an amended and restated strategic relationship agreement effective September 19, 2017 (the 'KHNP SRA') (on substantially similar terms as the original strategic relationship agreement between Denison and KEPCO), pursuant to which KHNP Canada is contractually entitled to Board representation. Provided KHNP Canada holds over 5% of the Shares, it is entitled to nominate one director for election to the Board at any shareholder meeting.
KHNP Canada's shareholding level gives it a large vote on decisions to be made by shareholders of Denison, and its right to nominate a director may give KHNP Canada influence on decisions made by Denison's Board. Although KHNP Canada's director nominee will be subject to duties under the OBCA to act in the best interests of Denison as a whole, such director nominee is likely to be an employee of KHNP and he or she may give special attention to KHNP's or KEPCO's interests as indirect Shareholders. The interests of KHNP and KEPCO, as indirect Shareholders, may not always be consistent with the interests of other Shareholders.
The KHNP SRA also includes provisions granting KHNP Canada a right of first offer for certain asset sales and the right to be approached to participate in certain potential acquisitions. The right of first offer and participation right of KHNP Canada may negatively affect Denison's ability or willingness to entertain certain business opportunities, or the attractiveness of Denison as a potential party for certain business transactions. KEPCO's large indirect shareholding block may also make Denison less attractive to third parties considering an acquisition of Denison if those third parties are not able to negotiate terms with KEPCO or KHNP Canada to support such an acquisition.
United States investors may not be able to obtain enforcement of civil liabilities against the Company
The enforcement by investors of civil liabilities under the United States federal or state securities laws may be affected adversely by the fact that the Company is governed by the OBCA, that the majority of the Company's officers and directors are residents of Canada, and that all, or a substantial portion, of their assets and the Company's assets are located outside the United States. It may not be possible for investors to effect service of process within the United States on certain of its directors and officers or enforce judgments obtained in the United States courts against the Company or certain of the Company's directors and officers based upon the civil liability provisions of United States federal securities laws or the securities laws of any state of the United States.
There is some doubt as to whether a judgment of a United States court based solely upon the civil liability provisions of United States federal or state securities laws would be enforceable in Canada against the Company or its directors and officers. There is also doubt as to whether an original action could be brought in Canada against the Company or its directors and officers to enforce liabilities based solely upon United States federal or state securities laws.
If the Company is characterized as a passive foreign investment company, U.S. holders may be subject to adverse U.S. federal income tax consequences
U.S. investors should be aware that they could be subject to certain adverse U.S. federal income tax consequences in the event that the Company is classified as a 'passive foreign investment company' ('PFIC') for U.S. federal income tax purposes. The determination of whether the Company is a PFIC for a taxable year depends, in part, on the application of complex U.S. federal income tax rules, which are subject to differing interpretations, and the determination will depend on the composition of the Company's income, expenses and assets from time to time and the nature of the activities performed by the Company's officers and employees.
2020 Annual Information Form 137
The Company may be a PFIC in one or more prior tax years, in the current tax year and in subsequent tax years. Prospective investors should carefully read the discussion below under the heading 'Material United States Federal Income Tax Considerations for U.S. Holders' and the tax discussion in any applicable prospectus supplement for more information and consult their own tax advisors regarding the likelihood and consequences of the Company being treated as a PFIC for U.S. federal income tax purposes, including the advisability of making certain elections that may mitigate certain possible adverse U.S. federal income tax consequences that may result in an inclusion in gross income without receipt of such income.
As a foreign private issuer, the Company is subject to different U.S. securities laws and rules than a U.S. domestic issuer, which may limit the information publicly available to U.S. investors
The Company is a foreign private issuer under applicable U.S. federal securities laws and, therefore, is not required to comply with all of the periodic disclosure and current reporting requirements of the U.S. Exchange Act and related rules and regulations. As a result, the Company does not file the same reports that a U.S. domestic issuer would file with the SEC, although it will be required to file with or furnish to the SEC the continuous disclosure documents that the Company is required to file in Canada under Canadian securities laws. In addition, the Company's officers, directors and principal shareholders are exempt from the reporting and 'short swing' profit recovery provisions of Section 16 of the U.S. Exchange Act. Therefore, the Company's securityholders may not know on as timely a basis when its officers, directors and principal shareholders purchase or sell securities of the Company as the reporting periods under the corresponding Canadian insider reporting requirements are longer. In addition, as a foreign private issuer, the Company is exempt from the proxy rules under the U.S. Exchange Act.
The Company could lose its foreign private issuer status in the future, which could result in significant additional costs and expenses to the Company
In order to maintain its current status as a foreign private issuer, 50% or more of the Company's Shares must be directly or indirectly owned of record by non-residents of the United States unless the Company also satisfies one of the additional requirements necessary to preserve this status. The Company may in the future lose its foreign private issuer status if a majority of the Shares are owned of record in the United States and the Company fails to meet the additional requirements necessary to avoid loss of foreign private issuer status. The regulatory and compliance costs to the Company under U.S. federal securities laws as a U.S. domestic issuer may be significantly more than the costs the Company incurs as a Canadian foreign private issuer eligible to use the multijurisdictional disclosure system. If the Company is not a foreign private issuer, it would not be eligible to use the multijurisdictional disclosure system or other foreign issuer forms and would be required to file periodic and current reports and registration statements on U.S. domestic issuer forms with the SEC, which are more detailed and extensive than the forms available to a foreign private issuer.
2020 Annual Information Form 138
DENISON'S SECURITIES
The Shares
The Company is entitled to issue an unlimited number of Shares. As of December 31, 2020, Denison had an aggregate of 678,981,882 Shares issued and outstanding, and 798,526,517 Shares issued and outstanding as at the date hereof.
Shareholders are entitled to receive notice of, and to one vote per share at, every meeting of Shareholders and to share equally in the assets of Denison remaining upon the liquidation, dissolution or winding up of Denison after the creditors of Denison have been satisfied.
ATM Program Activity
As at the date hereof, Denison, through its agents, has issued 4,230,186 Shares under the ATM, at an average price of $0.93, for aggregate gross proceeds of $3,914,000. The Company paid total commissions of $78,000, resulting in net proceeds after commissions of $3,836,000.
In March 2021, Denison terminated the EDA for the ATM under the 2020 Prospectus, and the Company will no longer offer or sell common shares through the facilities of the TSX and/or NYSE American pursuant to such ATM.
Price Range and Trading Volume of Shares
The Shares trade on the TSX under the symbol 'DML' and on the NYSE American under the symbol 'DNN'. The following table sets forth, for the periods indicated, the reported intra-day high and low sales prices and aggregate volume of trading of the Shares on the TSX and NYSE American during the year ended December 31, 2020.
Month
High (CAD$)TSX
Low (CAD$)TSX
VolumeTSX
High (US$)NYSE American
Low (US$)NYSE American
VolumeNYSE American
January
0.54
0.43
10.85 M
0.4165
0.321
1.92 M
February
0.51
0.415
6.66 M
0.39
0.31
2.15 M
March
0.49
0.235
12.18 M
0.38
0.19
3.82 M
April
0.68
0.335
19.52 M
0.4888
0.23
4.65 M
May
0.66
0.54
8.76 M
0.48
0.382
1.72 M
June
0.58
0.44
8.17 M
0.43
0.3212
2.15 M
July
0.66
0.47
8.95 M
0.496
0.345
2.61 M
August
0.70
0.60
6.56 M
0.54
0.4601
1.93 M
September
0.75
0.51
10.72 M
0.575
0.3824
2.34 M
October
0.69
0.41
14.12 M
0.5215
0.3049
5.20 M
November
0.52
0.42
10.16 M
0.3966
0.3277
2.54 M
December
0.97
0.47
25.48 M
0.7607
0.3667
7.84 M
Source: Bloomberg
The trading of the Shares on the TSX and the NYSE American do not represent all trading in the Shares, and significant volumes of trading may be facilitated through other platforms.
Prior Sales
During the year ended December 31, 2020, the Company issued the following securities pursuant to the Company's Option Plan and Share Unit Plan, as applicable:
2020 Annual Information Form 139
Stock Options:
Date of Issuance
Options Issued(#)
Exercise Prices($)
March 9, 2020
3,523,000
$0.455
August 10, 2020
46,000
$0.66
November 9, 2020
102,000
$0.45
TOTAL
3,671,000
Share Units:
Date of Issuance
Restricted Share Units (#)
Performance Share Units (#)
March 16, 2020
2,745,000
-
April 2, 2020
-
180,000
May 27, 2020
539,750
-
August 10, 2019
20,000
-
November 9, 2020
41,000
-
TOTAL
3,345,750
180,000
Dividends
Shareholders are entitled to receive dividends if, as and when declared by the Board of Directors. The Company is restricted from paying dividends under its Credit Facility, and the directors are focused on dedicating cash flow to reinvestment in the business of the Company. Accordingly, no dividends have been declared to date.
DENISON'S MANAGEMENT
Denison's Directors
The following table sets out the names and the provinces and countries of residence of each of the directors of Denison as of the date hereof, their respective positions and offices held with Denison and their principal occupations during the five preceding years. The following table also identifies the members of each committee of the Board of Directors.
Name and Province and
Country of Residence
Principal Occupation and Employment for
Past Five Years
Director Since(1)
David D. Cates
Ontario, Canada
President and Chief Executive Officer of the Company since 2015; prior: serving in various roles with the Company since 2008, including Vice President Finance, Tax & Chief Financial Officer as well as Director, Taxation.
2018
W. Robert Dengler(5,8,10)
Ontario, Canada
Corporate Director since 2006; prior: Vice-Chairman and Director of Dynatec Corporation; President and Chief Executive Officer of Dynatec Corporation.
2006
Brian D. Edgar(3,4)
British Columbia, Canada
Chairman of Silver Bull Resources, Inc., a mineral exploration company listed on both OTCMKTS and the TSX, since 2012, and President and Chief Executive Officer of Dome Ventures Corporation, a subsidiary of Silver Bull Resources Inc., since 2005.
2005
2020 Annual Information Form 140
Name and Province and
Country of Residence
Principal Occupation and Employment for
Past Five Years
Director Since(1)

Ron F. Hochstein(7,9,10)British Columbia, Canada
President and Chief Executive Officer of Lundin Gold Inc. since 2014; prior: President and Chief Executive Officer of the Company from 2009 to 2015.
2000
Jun Gon KimGyeongsangbuk-do, Korea
General Manager of the Nuclear Fuel Supply division of KHNP; prior: has held various positions at KHNP.
2020
Jack O.A. Lundin(9,10)
British Columbia, Canada
Chief Executive Officer of Bluestone Resources Inc.; prior: Senior Mine Project Engineer of Lundin Gold Inc. since 2017 and analyst in the commercial department of Lundin Norway AS.
2018
Catherine J. G. Stefan(2,5)
Ontario, Canada
Chair of the Board of the Company; prior: President, Stefan & Associates, a consulting firm based in Ontario, from 2009-2016; prior: Managing Partner, Tivona Capital Corporation, a private investment firm, from 1999-2008.
2006
Patricia M. Volker(3,6)
Ontario, Canada
Corporate Director since 2016; prior: over 17 years of service in various roles at the Chartered Professional Accountants of Ontario including Director of Standards Enforcement and Director, Public Accounting.
2018
Notes:
(1)
The term of office of each of the directors of Denison will expire at the Annual Meeting of the Shareholders currently scheduled to be held on May 6, 2021.
(2)
Chair, Audit Committee
(3)
Member, Audit Committee
(4)
Chair, Corporate Governance and Nominating Committee
(5)
Member, Corporate Governance and Nominating Committee
(6)
Chair, Compensation Committee
(7)
Member, Compensation Committee
(8)
Chair, Environment, Health, Safety & Sustainability Committee
(9)
Member, Environment, Health, Safety & Sustainability Committee
(10)
Member, Technical Committee
Denison's Executive Officers
The following table sets out the names and the provinces or states and countries of residence of each of the executive officers of Denison as of the date hereof, their respective positions and offices held with Denison and their principal occupations during the five preceding years.
Name and Province and
Country of Residence
Position with Denison and Employment for Past Five Years
David Cates
Ontario, Canada
President and Chief Executive Officer since 2015; prior: Vice President Finance, Tax and Chief Financial Officer from 2013.
Gabriel McDonald
Ontario, Canada
Executive Vice President and Chief Financial Officer, with Denison since 2015; prior: Director of Financial Reporting at IAMGOLD Corporation from 2015, Senior Manager at PricewaterhouseCoopers LLP from 2008.
2020 Annual Information Form 141
Name and Province and
Country of Residence
Position with Denison and Employment for Past Five Years
David Bronkhorst
Saskatchewan, Canada
Vice President Operations since 2019; prior: Vice President, Mining, Projects and Technology at Cameco Corporation until retirement in 2016.
Michael Schoonderwoerd
Ontario, Canada
Vice President Controller since 2013.
Amanda Willett
British Columbia, Canada
Vice President Legal since June 2020 and Corporate Secretary since June 2016; prior: Corporate Counsel from June 2016; Senior Associate at Blake, Cassels & Graydon LLP in Vancouver from 2011.
The directors and executive officers of Denison, as a group, beneficially own, or control or direct, directly or indirectly, 4,718,299 Shares, or less than one percent of the Shares as of the date of this AIF. No single director or officer beneficially owns or controls or directs, directly or indirectly, one percent or more of the Shares as of the date of this AIF. The information as to Shares beneficially owned or directed by the directors and officers, not being within the knowledge of the Company, has been furnished by each such individual.
Cease Trade Orders, Bankruptcies, Penalties or Sanctions
Other than as referred to below, no director or officer of the Company:
(a) is, as at the date of this AIF, or has, within the previous ten year period, been a director or executive officer of a company (including Denison) that:
(i) was subject to a cease trade or similar order or an order that denied the relevant company access to any exemption under securities legislation that was in effect for a period of more than 30 consecutive days that was issued (A) while that person was acting in such capacity or (B) after that person ceased to act in such capacity but which resulted from an event that accrued while that person was acting in that capacity; or
(ii) became bankrupt, made a proposal under any legislation relating to bankruptcy or insolvency or was subject to or instituted any proceedings, arrangement or compromise with creditors or had a receiver, receiver manager or trustee appointed to hold its assets (A) while that person was acting in such capacity or (B) within a year of that person ceasing to act in such capacity, or
(b) has, within the previous ten year period, become bankrupt, made a proposal under any legislation relating to bankruptcy or insolvency, or become subject to or instituted any proceedings, arrangement or compromise with creditors, or had a receiver, receiver manager or trustee appointed to hold such person's assets; or
(c) is, or has been, subject to any penalties or sanctions (i) imposed by a court relating to securities legislation or by a securities regulatory authority or has entered into a settlement agreement with a securities regulatory authority, or (ii) imposed by a court or regulatory body that would likely be considered important to a reasonable security holder in making an investment decision.
Ron Hochstein was a director of Sirocco Mining Inc. ('Sirocco'). Pursuant to a plan of arrangement completed on January 31, 2014, Canadian Lithium Corp. amalgamated with Sirocco to form RB Energy Inc. ('RBI').
2020 Annual Information Form 142
In October 2014, RBI commenced proceedings under the Companies' Creditors Arrangement Act (the 'CCAA'). CCAA proceedings continued in 2015 and a receiver was appointed in May 2015. The TSX de-listed RBI's common shares in November 24, 2014 for failure to meet the continued listing requirements of the TSX. Ron Hochstein was a director of RBI until October 3, 2014.
Conflicts of Interest
Some of Denison's directors and officers are also directors and/or officers of other natural resource companies and, consequently, there exists the possibility for such directors and officers to be in a position of conflict relating to any future transactions or relationships between the Company and such other companies or common third parties. However, the Company is unaware of any such pending or existing conflicts between these parties. Any decision made by any of such directors and officers involving the Company are made in accordance with their duties and obligations to deal fairly and in good faith with the Company and such other companies and their obligations to act in the best interests of Denison's shareholders. In addition, each of the directors of the Company discloses and refrains from voting on any matter in which such director may have a conflict of interest.
None of the present directors or senior officers of the Company, and no associate or affiliate of any of them, has any material interest in any transaction of the Company or in any proposed transaction which has materially affected or will materially affect the Company.
However, investor relations, administrative service fees and other pass-through expenses of $206,000 were incurred during the financial year ended December 31, 2020 with Namdo Management Services Ltd., a company which shares a common director with Denison. These services were incurred in the normal course of operating a public company.
In addition, one of Denison's directors, Mr. Kim, is employed by KHNP, a subsidiary of KEPCO and the parent corporation of KHNP Canada. Through its corporate holdings, KEPCO holds approximately 7.3% of the outstanding Shares as of the date hereof (the majority of which are held directly by KHNP Canada). The Company and KHNP Canada are parties to the KHNP SRA, which may present a conflict of interest for Mr. Kim. The KHNP SRA provides KHNP Canada with a right of first offer for certain asset sales and the right to be approached to participate in certain potential acquisitions being considered by Denison. While the Company is not aware of a pending or existing conflict of interest with Mr. Kim as of the date hereof, the interests of KEPCO, KHNP and KHNP Canada as shareholders of Denison and their business relationships with Denison may place Mr. Kim in a position of conflict as a director of the Company in the future.
Interest of Management and Others in Material Transactions
Other than as disclosed in this AIF, no director or executive officer of Denison, no person or company that beneficially owns, controls or directs, indirectly or directly, more than 10% of the Shares, and no associate or affiliate of any of them, has or has had, within the three most recently completed financial years or during the current financial year, any material interest, direct or indirect, in any transaction which materially affects or is reasonably expected to materially affect Denison.
2020 Annual Information Form 143
Standing Committees of the Board
The Audit Committee
The audit committee of the Company's Board of Directors is principally responsible for:
● recommending to the Company's Board of Directors the external auditor to be nominated for election by the Company's shareholders at each annual general meeting and negotiating the compensation of such external auditor;
● overseeing the work of the external auditor;
● reviewing the Company's annual and interim financial statements, its MD&A in respect thereof and press releases regarding earnings before they are reviewed and approved by the Board of Directors and publicly disseminated by the Company; and
● reviewing the Company's financial reporting procedures for the Company's public disclosure of financial information extracted or derived from its financial statements.
The Company's Board of Directors has adopted an audit committee mandate/terms of reference (the 'Mandate') which sets out the Audit Committee's mandate, organization, powers and responsibilities. The complete Mandate is attached as Schedule A to this AIF.
Below are the details of each Audit Committee member, including his or her name, whether she or he is independent and financially literate as such terms are defined under National Instrument 52-110 - Audit Committees of the Canadian Securities Administrators('NI 52-110') and his or her education and experience as it relates to the performance of his or her duties as an Audit Committee member. All three audit committee members have 'financial expertise' within the meaning of the U.S. Sarbanes-Oxley Act of 2002, as amended, and are financially literate under NI 52-110. The qualifications and independence of each member is discussed.
Director
Independent(1)
Financially Literate(2)
Education & Experience Relevant to Performance of Audit Committee Duties
Catherine Stefan
Chair of the Audit Committee
Yes
Yes
●Chartered Professional Accountant, Chartered Accountant
●B.Comm
●Held position of Chief Operating Officer, O&Y Properties Inc., President of Stefan & Associates and Executive Vice-President of Bramalea Group, Chair, Tax Committee of the Canadian Institute of Public Real Estate Companies (CIPREC).
Brian Edgar
Yes
Yes
●Law degree, with extensive corporate finance experience
●Held positions of Chairman (since 2011) and President and Chief Executive Officer (2005 to 2011) of a public company.
●Has served on audit committees of a number of public companies
2020 Annual Information Form 144
Director
Independent(1)
Financially Literate(2)
Education & Experience Relevant to Performance of Audit Committee Duties
Patricia Volker
Yes
Yes
●Chartered Professional Accountant, Chartered Accountant,
Certified Management Accountant
●B.Sc.
●Served for over 17 years in various positions at the Chartered Professional Accountants of Ontario during her 30+ year career in the accounting profession.
●Serves on private and public company audit and/or finance committees
Notes:
(1)
Independent within the meaning of NI 52-110.
(2)
To be considered financially literate, a member of the Committee must have the ability to read and understand a set of financial statements that present a breadth and level of complexity of accounting issues that are generally comparable to the breadth and complexity of the issues that can reasonably be expected to be raised by the Company's financial statements.
Since the commencement of the Company's most recently completed financial year, there has not been a recommendation of the Audit Committee to nominate or compensate an internal auditor which was not adopted by the Company's Board of Directors.
The Audit Committee has adopted specific policies and procedures for the engagement of non-audit services as described in Section D of the Mandate.
Effective October 1, 2020, at the request of the Company, the Company's prior auditor, PricewaterhouseCoopers LLP ('PwC'), resigned as auditors of the Company and KPMG was appointed to fill their vacancy for the fiscal year ended December 31, 2020.
In accordance with the requirements of National Instrument 51-102 of the Canadian Securities Administrators ('51-102'), a notice of change of auditors dated October 1, 2020 (the 'Notice of Change') was sent to PwC and KPMG, each of whom has provided a letter to the securities regulatory authorities in each of the jurisdictions where the Company is a reporting issuer stating that they agree with the statement made in the Notice of Change. A 'reporting package', as in 51-102, relating to the change (comprising the Notice of Change of Auditors from the Corporation and confirmation letters from each of PwC and KPMG) is available on SEDAR and EDGAR.
The following table discloses the fees billed to the Company by its independent auditors during the last two fiscal years.
Financial Year
Audit-Related
Ending
Audit Fees(1)
Fees(2)
Tax Fees(3)
All Other Fees(4)
December 31, 2019
$180,775
$116,567
Nil
Nil
December 31, 2020
$112,837
$273,208(5)
24,015(6)
Nil
Notes:
1.
The aggregate fees billed for audit services of the Company's consolidated financial statements.
2.
The aggregate fees billed for assurance and related services that are reasonably related to the performance of the audit or review of the Company's financial statements and are not disclosed in the Audit Fees column. Fees relate to reviews of interim consolidated financial statements, specified audit procedures not included as part of the audit of the consolidated financial statements and consent and comfort procedures in connection with various equity issuance documents.
2020 Annual Information Form 145
3.
The aggregate fees billed for tax compliance, tax advice, and tax planning services, such as transfer pricing and tax return preparation.
4.
The aggregate fees billed for professional services other than those listed in the other three columns.
5.
The increase in Audit-Related Fees in 2020 relates to the extensive work required of the auditors to support the Company's 2020 equity issuances, including the completion and filing of a short-form prospectus and a short form base shelf prospectus.
6.
The increase in Tax Fees is a result of the change in the Company's auditor to KPMG LLP, which has historically been engaged by the Company to provide it with corporate tax advice.
7.
Fees for 2019 relate to the Company's former auditor; fees in 2020 include $59,337 of audit fees and $192,959 of audit related fees for professional services billed by our former auditor.
Other Board Committees
The Board currently has four other committees in addition to the Audit Committee, namely the Corporate Governance and Nominating Committee, the Compensation Committee, the Environment, Health, Safety and Sustainability Committee and the Technical Committee. Each standing committee of the Board operates according to its mandate, which is approved by the Board and sets out the committee's duties and responsibilities. A discussion of each committee and its composition can be found in the most recent management information circular prepared in connection with the Company's Shareholder meeting ('Circular'), and copies of the standing committee mandates are available atwww.denisonmines.com.
Corporate Governance
As a Canadian reporting issuer with its Shares listed on the TSX, Denison has in place a system of corporate governance practices which is responsive to applicable Canadian requirements, including National Policy 58-201 -Corporate Governance Guidelinesof the Canadian Securities Administrators (the 'Guidelines'). Denison's corporate governance practices meet or exceed the Guidelines and all other applicable Canadian requirements. Reference is made to the Corporate Governance Practices section of the Circular, which contains a description of the Company's system of corporate governance practices with reference to the Guidelines.
Denison is classified as a foreign private issuer under U.S. securities law and its Shares are also listed on the NYSE American. Pursuant to the rules of the NYSE American, a foreign private issuer is permitted to follow home country practice except with respect to certain rules, with which Denison complies.
LEGAL AND REGULATORY PROCEEDINGS
Except as described below, the Company was not a party to, and none of the Company's property was the subject of, any material legal proceedings in 2020, and the Company knows of no such material legal proceedings that are contemplated. However, from time to time, the Company may become party to litigation incidental to its business or other litigation matters deemed by the Company to not be material.
Uranium Industry a.s. Arbitration
Pursuant to the terms of the Amended and Restated Share Purchase Agreement between Denison and UI dated November 25, 2015 (the 'GSJV Purchase Agreement') with respect to the Mongolia Transaction, the Company had sold its interest in the Gurvan Saihan Joint Venture (the 'GSJV') effective December 1, 2015 (the 'Mongolia Transaction'). In connection with the closing the Company received US$1,250,000 and retained rights to receive additional proceeds from contingent payments of up to US$12,000,000, for total consideration of up to US$13,250,000.
2020 Annual Information Form 146
The contingent payments are payable as follows: (1) US$5,000,000 within 60 days of the issuance of a mining licence for an area covered by any of the four principal exploration licences held by the GSJV, being the Hairhan, Haraat, Gurvan Saihan and Ulzit projects (the 'First Project'); (2) US$5,000,000 within 60 days of the issuance of a mining licence for an area covered by any of the other exploration licences held by the GSJV (the 'Second Project'); (3) US$1,000,000 within 365 days following the production of an aggregate of 1,000 pounds U3O8 from the operation of the First Project; and (4) US$1,000,000 within 365 days following the production of an aggregate of 1,000 pounds U3O8 from the operation of the Second Project.
The issuance by the Mongolian government of mining licence certificates for the Hairhan, Haraat, Gurvan Saihan and Ulzit projects in 2016 triggered an obligation for UI to make an aggregate of US$10,000,000 of contingent payments to Denison by November 16, 2016.
Pursuant to a January 2017 extension agreement (the 'Extension Agreement') entered into between UI and the Company, the payment due date for the contingent payments was extended from November 16, 2016 to July 16, 2017. As consideration for the extension, UI agreed to pay interest on the contingent payments at a rate of 5% per year, payable monthly up to July 16, 2017 and agreed to pay a US$100,000 instalment amount towards the balance of contingent payments. The first payment under the Extension Agreement was due on or before January 31, 2017. The required payments were not made, putting UI in breach of the GSJV Purchase Agreement and the Extension Agreement.
On February 24, 2017, the Company served notice to UI that it was in default of its obligations under the GSJV Agreement and the Extension Agreement and on December 12, 2017, the Company filed a Request for Arbitration between the Company and UI under the Arbitration Rules of the London Court of International Arbitration. Hearings in front of the arbitration panel were held in December 2019. The final award was rendered by an arbitration panel on July 27, 2020, with the panel finding in favour of Denison and ordering UI to pay the Company US$10,000,000 plus interest at a rate of 5% per annum from November 16, 2016, plus certain legal and arbitration costs. Denison and UI have exchanged correspondence, and award recovery options are being considered.
Other Arbitration
Denison commenced arbitration with Orano Canada and OURD in October 2019, with Denison's initial written submission made on March 9, 2020. Denison claimed that certain payments it was required to make related to matters outside the scope of the joint venture agreement for the MLJV. Proceedings in front of the arbitration panel were held in October 2020 and the panel released its decision in December 2020, finding in favour of Orano Canada and OURD on the facts. A settlement of $850,000 was paid by Denison in January 2021, agreed amongst the parties as full settlement of all legal fees and expenses incurred by Orano Canada and OURD.
MATERIAL CONTRACTS
Reference is made to the material contracts which have been filed by Denison with the Canadian securities regulatory authorities on the SEDAR website at www.sedar.com.
Below are the particulars of each contract, other than those entered into in the ordinary course of business, that is material to Denison and that was entered into between January 1, 2020 and the date hereof or was entered into before that date but is still in effect:
2020 Annual Information Form 147
1.
The following agreements executed in connection with the APG Transaction:
a.
The loan agreement between DMI and SPV dated January 31, 2017 with respect to the DMI Loan;
b.
The loan agreement between SPV and APG dated January 31, 2017 with respect to the SPV Loan;
c.
The performance guarantee by Denison as guarantor in favour of the SPV as beneficiary and APG as permitted assignee, pursuant to which Denison has agreed to guarantee the performance of DMI's obligations to SPV under the SPV Loan, which guarantee has been assigned by SPV in favour of APG;
d.
The streaming agreement between the DMI and Centaurus dated January 31, 2017 with respect to the Stream Arrangement; and
e.
The performance guarantee by Denison as guarantor in favour of Centaurus as beneficiary, pursuant to which Denison has agreed to guarantee the performance of DMI's obligations to Centaurus under the Stream Arrangement.
2.
The Reclamation Funding Agreement made as of the 21st day of December 1995 among Denison Mines Limited ('DML'), Her Majesty the Queen in Right of Canada (the 'Government of Canada') and Her Majesty the Queen in Right of the Province of Ontario (the 'Government of Ontario') as amended by the Amending Agreement made as of the 11th day of April 1997 among DML (now DMI), the Government of Canada and the Government of Ontario and as further amended by the Amending Agreement made as of the 25th day of February 1999 among DML, the Government of Canada and the Government of Ontario and further amended by an Assignment and Novation Agreement made as of the 29th day of December, 2003 among Denison Energy, DMI, the Government of Canada and the Government of Ontario.
According to the Reclamation Funding Agreement, the Company is required to maintain funds in an Environmental Trust sufficient for the succeeding six years of the estimated reclamation and on-going care and monitoring expenditures for the Company's closed Elliot Lake mining facility.
3.
The KHNP SRA dated September 19, 2017 between the Company and KHNP Canada.
The KHNP SRA provides for a long-term collaborative business relationship between the parties, replacing the strategic relationship agreement made as of June 15, 2009 among the Company, KEPCO and KEPCO Canada Uranium Investment Limited Partnership. Under the KHNP SRA, KHNP Canada is entitled to the nomination of one Board representative, provided that KHNP Canada's shareholding percentage stays above 5%.
The KHNP SRA also provides that if Denison intends to sell an interest in certain of its substantial assets, it will first notify KHNP Canada of each such proposed sale and provide KHNP Canada with a 30-day right of first offer to allow KHNP Canada to purchase the interest in the asset that Denison proposes to sell. The KHNP SRA provides that Denison will allow KHNP Canada to participate in potential purchases of certain assets, including a mill facility, a producing mine or a mineral resource for which a production feasibility study has been completed, which Denison plans to pursue with a co-investor. KHNP Canada's ability to purchase will not be available where Denison and KHNP Canada cannot agree on terms within a reasonable time or where their involvement would adversely affect Denison's ability to pursue an investment opportunity.
2020 Annual Information Form 148
The right of first offer and co-investment rights are subject to pre-existing contractual commitments and do not apply to certain pre-existing transactions. KHNP Canada is also entitled to subscribe for additional Shares in order to maintain or increase its shareholding percentage in Denison to thresholds which are relevant to its rights under the KHNP SRA, in circumstances where Denison completes a public offering or broadly distributed private placement to raise proceeds of greater than $10 million.
Denison is entitled to terminate the KHNP SRA if KHNP Canada's shareholding percentage in Denison drops below 5% and stays below 5% for 60 days following delivery of a notice to that effect by Denison to KHNP Canada or if Denison completes an Extraordinary Transaction, as defined in the KHNP SRA.
4.
The Credit Facility dated January 30, 2015, and all subsequent amendments including the Seventh Amending Agreement to the Fourth Amended and Restated Credit Facility dated January 14, 2021.
NAMES AND INTERESTS OF EXPERTS
The Company's Independent Registered Public Accounting Firm is KPMG LLP, Chartered Professional Accountants, Licensed Public Accountants, who have issued an independent auditor's report dated March 4, 2021 in respect of Denison's consolidated financial statements as at December 31, 2020 for the year ended 2020 and the effectiveness of the Company's internal control over financial reporting as at December 31, 2020. KPMG has advised that it is independent with respect to the Company within the meaning of the Rules of Professional Conduct of the Chartered Professional Accountants of Ontario and Public Company Accounting Oversight Board Rule 3520 Auditor Independence.
The Company's former Independent Registered Public Accounting Firm was PricewaterhouseCoopers LLP ('PwC'), Chartered Professional Accountants, Licensed Public Accountants, which issued a Report of Independent Registered Public Accounting Firm dated March 5, 2020 in respect of Denison's consolidated financial statements as at December 31, 2019 for the year ended 2019. PwC has advised that as of October 1, 2020 and during the period covered by the consolidated financial statements on which PwC reported, they were independent with respect to the Company within the meaning of the Rules of Professional Conduct of the Chartered Professional Accountants of Ontario and Public Company Accounting Oversight Board Rule 3520 Auditor Independence.
David Bronkhorst, P.Eng., Denison's Vice President Operations, who is a 'Qualified Person' within the meaning of this term in NI 43-101, has prepared sections of this AIF that are of a scientific or technical nature pertaining to the Company's mineral projects and has verified the data disclosed therein. To the knowledge of Denison, David Bronkhorst is the registered or beneficial owner, directly or indirectly, of less than one percent of the outstanding Shares.
Andy Yackulic, P.Geo., Denison's Director Exploration, who is a 'Qualified Person' within the meaning of this term in NI 43-101, has prepared sections of this AIF that are of a scientific or technical nature pertaining to the Company's mineral projects and has verified the data disclosed therein. To the knowledge of Denison, Andy Yackulic is the registered or beneficial owner, directly or indirectly, of less than one percent of the outstanding Shares.
The principal author of the Wheeler PFS Report dated October 30, 2018 was Mark Liskowich, P.Geo. of SRK, who is independent in accordance with the requirements of NI 43-101.
2020 Annual Information Form 149
The principal author of the Waterbury PEA Report dated October 30, 2020 was Gordon Graham, P.Eng. of EngComp, who is independent in accordance with the requirements of NI 43-101.
RPA, which was retained to independently review and audit the mineral reserves and mineral resources in accordance with the requirements of NI 43-101, prepared the following technical reports: (a) McClean Technical Report dated November 21, 2005 as amended on February 16, 2006 by Richard E. Routledge, M.Sc., P.Geo. and James W. Hendry, P.Eng.; (b) McClean North Technical Report dated January 31, 2007 by Richard E. Routledge, M.Sc., P.Geo.; and (c) Sue D Report dated March 31, 2006 by Richard E Routledge, M.Sc., P.Geo. and James W. Hendry, P.Eng.
The Midwest Technical Report dated March 26, 2018 was authored by Dale Verran, MSc, Pr.Sci.Nat., formerly of the Company, Chad Sorba, P.Geo, of the Company and G. David Keller, PGeo, formerly of SRK, and Oy Leuangthong, PEng, of SRK. Each of Messrs. Keller and Leuangthong and SRK were independent in accordance with the requirements of NI 43-101.
To the knowledge of Denison as of the date hereof, each of SRK, EngComp, RPA, GeoVector and SGS Geostat and each of their respective partners, employees and consultants who participated in the preparation of the aforementioned reports, or who were in a position to influence the outcome of such reports, are the registered or beneficial owner, directly or indirectly, of less than one percent of the outstanding Shares.
ADDITIONAL INFORMATION
Additional information regarding the Company is available on the SEDAR website at www.sedar.com. Further information concerning the Company, including directors' and officers' remuneration and indebtedness, principal holders of the Company's securities, options to purchase securities and interests of insiders in material transactions, where applicable, is contained in the management information circular for the Company's most recent meeting of shareholders. Additional financial information is provided in the Company's audited consolidated financial statements and MD&A for the financial year ended December 31, 2020.
A copy of this AIF, as well as the Circular and such other information and documentation that the Company makes available via SEDAR, can be found at www.sedar.com. In addition, certain of this information is distributed to shareholders in connection with Denison's Annual General Meeting of Shareholders. The Company will provide any of the foregoing documents subject to its rights to require people who are not security holders of the Company to pay a reasonable charge. Copies of these documents may be obtained by writing to:
Denison Mines Corp.
1100 - 40 University Avenue
Toronto, Ontario, M5J 1T1
Telephone: (416) 979-1991
Facsimile: (416) 979-5893
2020 Annual Information Form 150
Schedule A
Audit Committee Mandate and Charter
A.
Composition of the Committee
(1) The Board shall appoint annually from among its members at the first meeting of the Board following the annual meeting of the shareholders a committee to be known as the Audit Committee (the 'Committee') to be composed of three (3) directors or such other number not less than three (3) as the Board may from time to time determine.
(2) Any member of the Committee may be removed or replaced at any time by the Board. Any member of the Committee ceasing to be a director or ceasing to qualify under A(3) below shall cease to be a member of the Committee. Subject to the foregoing, each member of the Committee shall hold office as such until the next annual appointment of members to the Committee after his or her election. Any vacancy occurring in the Committee shall be filled at the next meeting of the Board.
(3) Each member of the Committee shall:
(a) be a member of the Board;
(b) not be an officer or employee of the Company or any of its affiliates;
(c) be an unrelated director as defined in the Toronto Stock Exchange (the 'TSX') Corporate Governance Guidelines ('TSX Guidelines') as the same may be amended from time to time;
(d) satisfy the independence requirements applicable to members of audit committees under each of Multilateral Instrument 52-110 - Audit Committees of the Canadian Securities Administrators ('M1 52-110'), Rule 10A-3(b)(1)(ii) of the United States Securities and Exchange Commission, and any other applicable laws and regulations, as the same may be amended from time to time (with the TSX Guidelines, 'Applicable Laws'); and
(e) satisfy the financial literacy requirements prescribed by Applicable Laws.
(4) A majority of the Committee shall constitute a quorum.
(5) The Committee shall elect annually a chairperson from among its members.
B. Purpose
(1) The Committee's purpose is to assist the Board in its supervision of the management of the business and affairs of the Company through oversight of:
(a) the integrity of the Company's financial statements, Management's Discussion and Analysis ('MD&A') and other financial reporting;
(b) the integrity of the Company's internal control and management information systems;
(c) the Company's compliance with all applicable laws, rules, regulations, policies and other requirements of governments, regulatory agencies and stock exchanges relating to accounting matters and financial disclosure;
(d) the auditor's qualifications and activities;
(e) communication among the auditor, management and the Board; and
(f) such other matters as are determined by the Board from time to time.
_____________________________________________________________________________________________
2020 Annual Information Form A-1
C. Committee Resources
(1) The Committee shall have direct channels of communication with the Company's auditor to discuss and review specific issues as appropriate.
(2) The Committee, or any member of the Committee with the approval of the Committee, may retain at the expense of the Company such independent legal, accounting (other than the auditor) or other advisors on such terms as the Committee may consider appropriate and shall not be required to obtain the approval of the Board in order to retain or compensate any such advisors.
(3) The Committee shall have unrestricted access to Company personnel and documents and shall be provided with all necessary funding and other resources to carry out its responsibilities.
D. Committee Responsibilities
(1) The responsibilities of the Committee shall be to:
(a) with respect to financial accounting matters:
(i)
review with management and the external auditors the annual consolidated financial statements, MD&A and press release announcing annual financial results of operations before making recommendations to the Board relating to approval of such documents;
(ii)
review with management and the external auditors interim financial statements, MD&A and press release announcing interim financial results of operations before making recommendations to the Board relating to approval of such documents;
(iii)
review and discuss with management and the external auditors all public disclosure documents containing audited or unaudited financial information including: any Prospectus; the Annual Report; interim unaudited reports; and any material change report pertaining to the Company's financial matters. The Committee will review the consistency of the foregoing documents with facts, estimates or judgments contained in the audited or unaudited financial statements;
(iv)
satisfy itself that adequate procedures are in place for the review of the Company's disclosure of financial information extracted or derived from the Company's financial statements, other than the Company's financial statements, MD&A and earnings press releases, and shall periodically assess the adequacy of those procedures;
(v)
prior to the completion of the annual audit, and at any other time deemed advisable by the Committee, review and discuss with management and the auditor the quality of the Company's accounting policies and financial statement presentation, including, without limitation, the following:
1. all critical accounting policies and practices to be used, including, without limitation, the reasons why certain estimates or policies are or are not considered critical and how current and anticipated future events may impact those determinations as well as an assessment of any proposed modifications by the auditors that were not made;
2. all alternative accounting treatments for policies and practices that have been discussed by management and the auditors; and
3. other material written communications between the auditor and management, including, without limitation, any management letter, schedule of unadjusted differences, the management representation letter, report on internal controls, as well as the engagement letter and the independence letter;
_____________________________________________________________________________________________
2020 Annual Information Form A-2
(vi) review annually the accounting principles and practices followed by the Company and any changes in the same as they occur;
(vii) review new accounting principles of the Chartered Professional Accountants of Canada and the International Accounting Standards Board which would have a significant impact on the Company's financial reporting as reported to the Committee by management;
(viii) review the status of material contingent liabilities as reported to the Committee by management;
(ix) review potentially significant tax problems as reported to the Committee by management; and
(x) review any errors or omissions in the current or prior year's financial statements which appear material as reported to the Committee by management;
(b) with respect to the external auditors:
(i) be directly responsible for recommending the appointment of the auditor, the auditor's compensation, retention and termination and for oversight of the work of the auditor (including, without limitation, resolution of disagreements between management and the auditor regarding financial reporting) for the purpose of preparing or issuing an audit report or performing other audit, review or services for the Company;
(ii) approve, prior to the auditor's audit, the auditor's audit plan (including, without limitation, staffing), the scope of the auditor's review and all related fees;
(iii) satisfy itself as to the independence of the auditor. The Committee shall pre-approve any non-audit services (including, without limitation, fees therefor) provided to the Company or its subsidiaries by the auditor or any auditor of any such subsidiary and shall consider whether these services are compatible with the auditor's independence, including, without limitation, the nature and scope of the specific non-audit services to be performed and whether the audit process would require the auditor to review any advice rendered by the auditor in connection with the provision of non-audit services. The Committee shall not allow the auditor to render any non-audit services to the Company or its subsidiaries that are prohibited by Applicable Law;
(iv) review and approve the Company's policies concerning the hiring of employees and former employees of the Company's auditor or former auditor.
(c) with respect to internal controls:
(i) oversee management's design, testing and implementation of the Company's internal controls and management information systems and review the adequacy and effectiveness thereof.
(d) with respect to concerns and complaints:
(i) establish procedures for:
1. the receipt, retention and treatment of complaints received by the Company regarding accounting, internal accounting controls or auditing matters; and
2. the confidential, anonymous submission by employees of the Company of concern regarding questionable accounting or auditing matters.
(e) The Committee shall be responsible for oversight and enforcement of the Code of Ethics for the Chief Executive Officer, Senior Financial Officers and Other Officers of the Company, subject to the supervision of the Board.
_____________________________________________________________________________________________
2020 Annual Information Form A-3
(f) with respect to general audit matters:
(i) inquire of management and the external auditors as to any activities that may or may not appear to be illegal or unethical;
(ii) review with management, the operations analyst and the external auditors any frauds reported to the Audit Committee;
(iii) review with the external auditors the adequacy of staffing for accounting and financial responsibilities; and
(iv) report and make recommendations to the Board as the Committee considers appropriate.
(2) In addition, the Board may refer to the Committee such matters and questions relating to the Company as the Board may from time to time see fit;
(3) Any member of the Committee may require the auditors to attend any or every meeting of the Committee.
E. Meetings
(1) The times of and the places where meetings of the Audit Committee shall be held and the calling of and procedure at such meetings shall be determined from time to time by the Committee, provided however that the Committee shall meet at least quarterly, and the Committee shall maintain minutes or other records of its meetings and activities. Notice of every such meeting to be given in writing not less than five (5) days prior to the date fixed for the meeting, and shall be given to the auditors of the Company, that the auditors shall be entitled to attend and be heard thereat. Meetings shall be convened whenever requested by the auditors, the operations analyst or any member of the Audit Committee in accordance with the Ontario Business Corporations Act.
(2) As part of each meeting of the Committee at which it recommends that the Board approve the financial statements of the Company, and at such other times as the Committee deems appropriate, the Committee shall meet separately with the auditor to discuss and review specific issues as appropriate.
F. Evaluation of Charter and Mandate
(1) On at least an annual basis, the Committee shall review and assess the adequacy of this Charter and Mandate and recommend any proposed changes to the Board of Directors.
(2) All prior resolutions of the Board relating to the constitution and responsibilities of the Audit Committee are hereby repealed.
_____________________________________________________________________________________________
2020 Annual Information Form A-4
Schedule B
Glossary of Technical Terms
Note: The terms related to Mineral resources and mineral reserves presented herein are as defined in 'CIM DEFINITION STANDARDS on Mineral Resources and Mineral Reserves' prepared by the CIM Standing Committee on Reserve Definitions, adapted by CIM Council, May 10, 2014.
eU3O8oreU
This term refers to equivalent U3O8grade derived from the downhole logging of drill holes using a calibrated total gamma probe.
Feasibility Study
A Feasibility Study is a comprehensive technical and economic study of the selected development option for a mineral project that includes appropriately detailed assessments of applicable Modifying Factors together with any other relevant operational factors and detailed financial analysis that are necessary to demonstrate, at the time of reporting, that extraction is reasonably justified (economically mineable). The results of the study may reasonably serve as the basis for a final decision by a proponent or financial institution to proceed with, or finance, the development of the project. The confidence level of the study will be higher than that of a Pre-Feasibility Study.
Historical Estimate
A historical estimate means an estimate of the quantity, grade or metal or mineral content of a deposit that an issuer has not verified as a current mineral resource or mineral reserve, and which was prepared before the issuer acquiring, or entering into an agreement to acquire, an interest in the property that contains the deposit.
Indicated Mineral Resource
An indicated mineral resource is that part of a mineral resource for which quantity, grade or quality, densities, shape and physical characteristics, can be estimated with a level of confidence sufficient to allow the appropriate application of technical and economic parameters, to support mine planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough for geological and grade continuity to be reasonably assumed.
Inferred Mineral Resource
An inferred mineral resource is that part of a mineral resource for which quantity and grade or quality can be estimated on the basis of geological evidence and limited sampling and reasonably assumed, but not verified, geological and grade continuity. The estimate is based on limited information and sampling gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes
Measured Mineral Resource
A measured mineral resource is that part of a mineral resource for which quantity, grade or quality, densities, shape, and physical characteristics are so well established that they can be estimated with confidence sufficient to allow the appropriate application of technical and economic parameters, to support production planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough to confirm both geological and grade continuity.
_____________________________________________________________________________________________
2020 Annual Information Form B-1
Mineral Reserve
A mineral reserve is the economically mineable part of a measured or indicated mineral resource demonstrated by at least a Preliminary Feasibility Study. This Study must include adequate information on mining, processing, metallurgical, economic and other relevant factors that demonstrate, at the time of reporting, that economic extraction can be justified. A mineral reserve includes diluting materials and allowances for losses that may occur when the material is mined.
Mineral Resource
A mineral resource is a concentration or occurrence of diamonds, natural solid inorganic material, or natural solid fossilized organic material including base and precious metals, coal, and industrial materials in or on the Earth's crust in such form and quantity and of such a grade or quality that it has reasonable prospects for economic extraction. The location, quantity, grade, geological characteristics and continuity of a mineral resource are known, estimated or interpreted from specific geological evidence and knowledge.
Modifying Factors
Modifying Factors are considerations used to convert Mineral Resources to Mineral Reserves. These include, but are not restricted to, mining, processing, metallurgical, infrastructure, economic, marketing, legal, environmental, social and governmental factors.
Preliminary Feasibility Study or Pre-Feasibility Study
A Pre-Feasibility Study is a comprehensive study of a range of options for the technical and economic viability of a mineral project that has advanced to a stage where a preferred mining method, in the case of underground mining, or the pit configuration, in the case of an open pit, is established and an effective method of mineral processing is determined. It includes a financial analysis based on reasonable assumptions on the Modifying Factors and the evaluation of any other relevant factors which are sufficient for a Qualified Person, acting reasonably, to determine if all or part of the Mineral Resource may be converted to a Mineral Reserve at the time of reporting. A Pre-Feasibility Study is at a lower confidence level than a Feasibility Study.
Probable Mineral Reserve
A 'probable mineral reserve' is the economically mineable part of an indicated, and in some circumstances, a measured mineral resource demonstrated by at least a Preliminary Feasibility Study. This Study must include adequate information on mining, processing, metallurgical, economic, and other relevant factors that demonstrate, at the time of reporting, that economic extraction can be justified.
Proven Mineral Reserve
A 'proven mineral reserve' is the economically mineable part of a measured mineral resource demonstrated by at least a Preliminary Feasibility Study. This Study must include adequate information on mining, processing, metallurgical, economic, and other relevant factors that demonstrate, at the time of reporting, that economic extraction is justified.
Qualified Person
A 'Qualified Person' means an individual who is an engineer or geoscientist with at least five years of experience in mineral exploration, mine development or operation or mineral project assessment, or any combination of these; has experience relevant to the subject matter of the mineral project and the technical report and is a member or licensee in good standing of a professional association of geoscientists and/or engineers meeting the criteria set out in NI 43-101.
_____________________________________________________________________________________________
2020 Annual Information Form B-2