GTT – Gaztransport & Technigaz SA

11/16/2021 | Press release | Distributed by Public on 11/17/2021 04:08

GTT obtains tank design order for a new LNG Carrier from Daewoo Shipbuilding & Marine Engineering

Paris - November 16th, 2021. GTT announces that it has received an order from its partner the Korean shipyard Daewoo Shipbuilding & Marine Engineering (DSME) for the tank design of a new LNGC[1]on behalf of an Asian ship-owner.

As part of this order, GTT will provide the design and associated engineering services for the tanks of the vessel, which will offer a capacity of 174,000 m3. The tanks will be fitted with the GTT NO96 GWmembrane containment system, a technology developed by GTT.

The vessel will be delivered in the second half of 2024.

Media contact:
[email protected]/ +33 (0)1 30 23 48 36

Investor Relations contact:
[email protected]/ + 33 (0)1 30 23 20 87

> Download in .pdf

[1]Liquefied Natural Gas Carrier