05/19/2022 | Press release | Distributed by Public on 05/19/2022 08:39
On May 18, 2022, approximately 40 gallons of wastewater were discharged at the 4200 block of Fairfield Ave. S. due to a contractor bypass pump suction hose being blocked with rags. The site was cleaned and disinfected.