The Petroleum Safety Authority Norway (PSA) has carried out an audit of Equinor and its management of oil loading and dynamic positioning on the Gina Krog field.
The audit was conducted on 28 and 29 October 2021.
The objective was to monitor that the activity is being performed in line with relevant requirements in the HSE legislation.
During the audit, one non-conformity relating to maintenance management was identified. An improvement point was also identified relating to load-cell calibration for a hawser winch.
We have asked Equinor to report on how the non-conformity will be addressed and for its assessment of the improvement point observed.
The reply deadline is set at 21 December 2021.