Ministry of Construction of the Socialist Republic of Vietnam

01/08/2024 | Press release | Distributed by Public on 01/09/2024 02:42

Dong Nai kick-starts construction on three road infrastructure projects worth more than 2 trillion VND (08/01/2024)



Delegates at the ground-breaking ceremony

The three projects included Road 25B, phase 1 of Road 25C, and the Le Hong Phong Street extension.

Of which, the 3.8-kilometre-long 25B Road has a total investment of 639 billion VND. Work on the road is slated to finish in 730 days.

Meanwhile, Road 25C is set to start at the intersection with Hung Vuong Street and end at the interchange with Nguyen Huu Canh Street.

The road, which is 6.4km in length and 61m in width, has a price tag of nearly 1.3 trillion VND.

The extended Le Hong Phong Street will be built in 540 days, costing 216 billion VND. Its ending point will connect to the road leading to Phuoc An Port in Dong Nai.

Once completed, these roads will connect with the local key routes leading to Beltway No. 3, Phuoc An Port, and Long Thanh International Airport.

The projects will also enhance the transportation of goods and the mobility of residents, contributing to the establishment of well-structured traffic infrastructure within the Nhon Trach District while facilitating socio-economic growth in the region.