Xcel Energy Inc.

04/11/2024 | Press release | Distributed by Public on 04/11/2024 15:26

Material Event - Form 8-K

Item 8.01. Other Events
In 2023, Southwestern Public Service Company (SPS), a New Mexico corporation, and a wholly owned subsidiary of Xcel Energy Inc., filed an electric rate case with the Public Utility Commission of Texas (PUCT) seeking an increase in base rate revenue of $158 million (14%).
The request was based on a return on equity (ROE) of 10.65%, an equity ratio of 54.6%, a retail rate base of $3.6 billion and a change in the Tolk coal plant depreciation life from 2034 to 2028. SPS is requesting a surcharge from July 13, 2023 through the effective date of new base rates.
In December 2023, SPS, PUCT Staff and intervenors filed a black box settlement. Key terms include:
A base rate increase of $65 million effective back to July 13, 2023.
A 9.55% ROE, a 54.51% equity ratio and a 7.11% weighted average cost of capital (WACC) for purposes of calculating SPS' allowance for funds used during construction and in other proceedings filed before the PUCT where a stated WACC is required.
The reflection in rates of the retirement of Tolk Generation Station from 2034 to 2028.
Establishment of a rate rider of approximately $18 million to be recovered over a three-year period for various deferred expenses.
Interim rates based on the settlement went into effect on February 1, 2024.
On April 11, 2024, the PUCT unanimously approved the settlement without modification.