U.S. Army Corps of Engineers

07/27/2021 | Press release | Distributed by Public on 07/26/2021 22:36

Construction continues at Carlisle Barracks

The U.S. Army Corps of Engineers, Baltimore District is proud to be a part of a team that includes Carlisle Barracks, the U.S. Army War College, and other stakeholders involved in the General Instruction Building project. With more than 201,000 square feet of space, this facility will support multiple strategic education programs and enhance the college's ability to develop strategic leaders and influential ideas. Check out some images of the project.


The south concrete wall of the GIB in the distance in front of Collins Hall.


Slab-on-grade rebar on the east side of the building. The south wall (from Photo #1) is on the left. Mechanical, electrical, and plumbing (MEP) piping penetrations are shown with the red tape on top.


Vertical construction in the northeast corner of the GIB began to take shape in May. Here you can see the structural steel as well as the slab on grade rebar and forms.


More progression of the structural steel and the last section of the south wall is shown formed on the right.


North elevation structural steel for approximately 50% of the building.


The northeast corner of the building, showing all four floors, including the terrace level.