01/19/2023 | Press release | Distributed by Public on 01/19/2023 06:43
The Petroleum Safety Authority Norway (PSA) has given Equinor consent to use the mobile drilling facility Transocean Enabler for plugging, drilling and completion on the field Visund Nord.
Operator: Equinor
Production license: 120
Field: Visund Nord
Facility:Transocean Enabler
Visund is a field located in the northern part of the North Sea, northeast of the Gullfaks field. The water depth is 335 metres. Visund was discovered in 1986, and the plan for development and operation (PDO) was approved in 1996. The field is developed with a semi-submersible, integrated accommodation, drilling and processing facility (Visund A) and a subsea facility in the northern part of the field. Production started in 1999.
Source: norskpetroleum.no