Oroco Resource Corp.

10/02/2022 | News release | Distributed by Public on 10/02/2022 15:59

Field Activity Update - Week of September 26, 2022

Update for the week ending September 26, 2022

With the expanded drill fleet we were able to drill 1,553m during the week: the most core we have produced in a week since the exploration drill program began last year.

Drill Holes N033 and N35 were completed (though Hole N032 has as yet not been collared owing to mechanical drill issues and some on-site drill changes). Holes N034, N036, N037, S002 and S003 were advanced through the week.

Some 820 samples (including duplicates and standards) were shipped from Ranchito to the assay lab during the week: these samples included material from holes N035 and S002, and the last samples from N029 and N033.

As part of the gearing up of our PEA work program, Tucson-based principals from AUSENCO conducted a site visit during the week. They were able to cover the site in a comprehensive manner by road, and to traverse the Huites reservoir and visit Brasiles by boat to provide a good overview of the project, including prospective infrastructure sites.

Views northward from the south-wall 'La Pareida' area site overlooking South Zone and over to the Brasiles bowl with our AUSENCO guests.

A brief stop at the drill site for hole S003. This site is operated by Major Drilling.

Preparing for the boat ride to return to Ranchito via Buena Vista Camp.