Road Report 4-4-24

City Projects

12th Street and Avenue C

In early April, the City will convert the intersection of 12th Street and Avenue C into a four-way stop, following pavement preservation work in the area. Motorists should watch for message boards and signs indicating the change.

North End pavement replacement project

A contractor working for the City will remove and replace street pavement, water lines, and ADA-standard sidewalk ramps on various streets in northern Yuma, roughly between Avenue A and 4th Avenue. Most of the major street reconstruction work is complete; however, work crews will continue to operate in isolated areas. Currently the contractor is raising utility accesses to grade level. The overall project is expected to conclude in summer 2024.

Avenue 5E, 37th Street to 40th Street

A contractor working for the City is installing water and sewer lines on Avenue 5E between 37th Street and 40th Street, plus new fire hydrants and new service connections, followed by pavement replacement. Avenue 5E will be closed to through traffic between 32nd Street and 40th Street, and to all traffic between 37th Street and 40th Street. Detour using Avenue 4E or Avenue 6E. Pavement work will take place April 8-9. This project is expected to be complete by late April or early May.

45th Avenue, 24th Street to 28th Street

A contractor working for the City will construct a multi-use path along 45th Avenue between 24th Street and 28th Street. Most work will occur off the roadway; however, one phase of the project will prompt a closure of 45th Avenue between 24th Street and 26th Street. Project is expected to run through mid-April.

28th Drive, 31st Street to 29th Place

28th Drive traffic is restricted to northbound only between 31st Street and 29th Place for emergency storm drain repair.

Spring pavement preservation

Spring surface treatments are expected to run through the end of April. Impacted neighborhood property owners will receive a door hanger that indicates the area where the roadway maintenance is taking place as well as the dates and times. Find a complete list of roadways and subdivisions to be preserved on the Pavement Preservation page of the City's website. This page provides an interactive map where residents can zoom in on highlighted streets and click for that street's scheduled maintenance date.

Slurry Seal

April 5:

Castle Dome Avenue from Best Western hotel entrance to Yuma Palms Parkway.

April 6:

24th Street from Avenue A to Avenue B.

April 7:

24th Street from Avenue A to Avenue B.

April 9:

24th Street, 4th Avenue to Avenue A (outside lanes).

Pacific Avenue, 12th Street to 17th Street.

April 10:

24th Street, 4th Avenue to Avenue A (inside lanes).

Pacific Avenue, 12th Street to 17th Street.

April 11:

24th Street, 4th Avenue to Avenue A (middle splits).

April 12:

Castle Dome Avenue from Shilo Inn hotel entrance to Yuma Palms Parkway.

Oil Seal

April 8,Citrus View subdivision:

33rd Avenue from Kinnow Avenue to Minneola Avenue.

33rd Lane from Kinnow Avenue to Minneola Avenue.

34th Street from Minneola Avenue to 5000 block of 34th Street.

April 9,Citrus View subdivision:

Minneola Avenue from 33rd Place to 34th Street.

34th Street, from 5000 block to Avenue 5-1/2E.

April 10,Kerley Ranch subdivision:

36th Place from Francesca Way to east end cul-de-sac.

36th Lane from Francesca Way to east end cul-de-sac.

37th Lane from Francesca Way to east end cul-de-sac.

37th Street from Francesca Way to Victoria Way.

April 11,Kerley Ranch subdivision:

38th Street from Francesca Way to Kerley Drive.

Francesca Way from 36th Place to 38th Street (east side).

April 12,Kerley Ranch subdivision:

Francesca Way from 36th Place to 38th Street (west side).

City Street Maintenance

City Street Maintenance operations for April 8-12 will take place in the following areas.

Streets Concrete Sidewalk Repair

San Carlos subdivision.

Westridge subdivision.

Street Asphalt Patching

La Mesa Linda.

Streets Crack Sealing

None scheduled this week.

Streets Lane Striping

Walnut Avenue from 12th Street to 10th Street.

Castle Dome Avenue from 8th Street to Yuma Palms Parkway.

24th Street from 4th Avenue to Avenue B.

Pacific Avenue, 12th Street to 17th Street.

Avenue C, 8th Street to 16th Street.

Other utility projects and encroachment permits

Avenue A, Parkview to 28th Street (Yuma County)

A contractor working for Yuma County is working on the Smucker Park flood control basin, which will at times affect Avenue A between Parkview Loop and 28th Street. The sidewalk on the west side of Avenue A is closed. Motorists on Avenue A should be aware of trucks entering and exiting the roadway on the north side of the park. Later phases of work will include lane restrictions on Avenue A and a closure at Westridge, currently anticipated for early 2024. Message boards will be activated 72 hours prior to any such closure.

Concrete pouring is expected at 28th Street and Avenue A on April 9.

Fiber optic installations (Allo)

Communications line installations will take place in areas designated for utility easements within the City limits and surrounding vicinity in the following areas:

  • Avenue B, 8th Street to 3rd Street.
  • Area between Avenue B and 15th Avenue, from West Main Canal to 8th Street.
  • Area between 1st Street and Giss Parkway, 4th Avenue to Gila Street.
  • Area between 12th Street to 14th Street, Pageant Avenue to 44th Avenue.
  • 24th Street and Kennedy Lane.
  • Las Casitas subdivision.
  • The Dunes subdivision.
  • Areas surrounding 8th Street to 47th Drive, including Donovan Estates.
  • 32nd Street between avenues 6E and 8E.
  • Avenue C and 16th Street.
  • Gila Ridge Road, east toward Avenue 6E.
  • Area between 2nd Street and 6th Street, Magnolia to 13th Avenue.
  • Area between 16th Street and 20th Street, from Avenue A to 5th Avenue.
  • 3rd Street west of 15th Avenue.
  • Hettema Street.

Avenue 8-1/2E, 34th Street to 40th Street (Gila Electronics)

Installation of new fiber optic cables will require a lane shift on southbound Avenue 8-1/2E between 34th Street and 40th Street through late April.

Maiden Lane, 1st Street to 2nd Street (Yuma County)

Installation of a construction crane will prompt the closure of Maiden Lane between 1st Street and 2nd Street.

Avenue B, 15th Street (Century Link)

Century Link has a 60-day project that will include a closure of the right southbound lane of Avenue B approaching 15th Street. Work is expected to conclude by mid-May.

24th Street, Pacific Avenue to Avenue 3E (SW Gas)

Gas line replacement work will include eastbound lane closures of 24th Street between Pacific Avenue and Avenue 3E. Work should complete in late April.

Riley Avenue B, 17th Street to 18th Street

Riley Avenue is currently closed between 17th Street and 18th Street for construction work.

40th Street/ County 12th Street, Avenue 5E (APS)

APS pole and line work will require lane closures at 40th Street/County 12th Street at Avenue 5E the week of April 29 through May 3. Traffic will be regulated by flag persons.

Arizona Avenue, 25th Street (SW Gas)

Gas valve maintenance work will require a 15-day lane restriction on Arizona Avenue at 25th Street. Work should conclude by June 5.