02/03/2023 | Press release | Distributed by Public on 02/03/2023 19:32
HONOLULU - The Hawai'i Department of Transportation informs the public of lane closures on the H-1 Freeway to address spalling on two bridges in Pearl City, the Kaahumanu Overpass Bridge and the Waiawa Overpass Bridge. The concrete spalling was discovered in regular inspections and must be repaired to avoid future deterioration. There are no weight postings on these structures as a result of the inspection findings.
The schedule for the lane closures to repair the Kaahumanu Overpass is:
Saturday, Feb. 4, from 1 a.m. - 8 a.m.
Sunday, Feb. 5, from 1 a.m. - 8 a.m.
Monday, Feb. 6 through Wednesday, Feb. 8, from 9:15 a.m. to when the Zipmobile reaches the Kaahumanu Overpass
Saturday, Feb. 11, from 1 a.m. - 8 a.m.
Sunday, Feb. 12, from 1 a.m. - 8 a.m.
The schedule for the spall repairs to the Waiawa Overpass Bridge, will be shared as soon as they are finalized.
Motorists are advised to plan ahead and allow for extra travel time to get to their destinations. HDOT's weekly roadwork list and map is published every Friday to https://hidot.hawaii.gov/highways/roadwork/
###