Chevron Corporation

04/26/2024 | Press release | Distributed by Public on 04/26/2024 12:07

Kazakhstan project reaches new milestone

When the Tengiz Field was developed, each well operated under high pressure. Over time, reservoir pressure declined, and the oil and gas no longer flow at the same intensity.

To address this, the entire field is being converted to operate under low pressure. Micah Coston, a project manager with Tengizchevroil, compared the project to uncorking a bottle of champagne. The liquid initially overflows from the top, but eventually loses momentum.

"The WPMP will help keep our existing plants full and maintain reliable performance at these facilities," said Steve Kovacevich, a TCO production operations manager.