04/11/2024 | Press release | Distributed by Public on 04/12/2024 16:03
Las Animas and Baca Counties - The Colorado Department of Transportation with its contract partner APC Southern will begin a highway resurfacing project on April 15 on US Highway 160 from Kim to Pritchett.
Work will include the resurfacing of east and westbound lanes of US 160, updating sign panels, installation of new signs to meet safety standards, and widening of a portion of the curve shoulder. In addition, one paved shoulder widening area will be added. This work will occur from Mile Point 423 east of Kim to MP 451 north of Pritchett.
This project will improve and prolong the life of the road surface and enhance safety by providing a smoother road surface for motorists. Resurfacing can greatly extend the life of the asphalt pavement. Some highways may last more than 50 years with periodic resurfacing of the top layer of asphalt and timely repairs. The project is scheduled for completion in September 2024.
Motorists and area residents can expect the following impacts during construction:
For additional information about this project:
Travelers are urged to "know before you go." Gather information about weather forecasts and anticipated travel impacts and current road conditions prior to hitting the road. CDOT resources include:
The following tips are to help you stay safe while traveling through maintenance and construction work zones.
The new free COtrip Planner mobile app was designed to meet the growing trend of information on mobile and tablet devices for the traveling public. The COtrip Planner app provides statewide, real-time traffic information, and works on mobile devices that operate on the iOS and Android platforms. Visit the Google Play Store (Android devices) or the Apple Store (iOS devices) to download!